Ssr Mining Inc. · NASDAQ:SSRM

Ssr Mining — Silver Standard Resources — Investor Presentation (February 2012)

36 slides from Ssr Mining's investor presentation, Feb 27, 2012

  1. Slide 1: Corporate Presentation

    CORPORATE PRESENTATION SSRI:NDAQ | SSO: TSX 1

  2. Slide 2: Notes Regarding Forward Looking Statements

    Notes Regarding Forward Looking Statements This presentation contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward looking information” within Canadian securities laws (collectively “forward looking statements”) re

  3. Slide 3: Cautionary Note to U.S. Investors

    Cautionary Note to U.S. Investors All disclosure about our exploration properties in this Presentation conforms to the standards of United States Securities and Exchange Commission (the “SEC”) Industry Guide 7, Description of Property by Issuers Engaged or to be Engaged in Significant Mining Operati

  4. Slide 4: 192Moz Silver Reserves

    192Moz SILVER RESERVES SSRI:NDAQ | SSO: TSX 4

  5. Slide 5: $356M cash: Strong Balance Sheet

    $356Mcash STRONG BALAN C E SHEET Cash balance as of September 30, 2011. SSRI:NDAQ | SSO: TSX 5

  6. Slide 6: Silver Fundamentals

    Silver Fundamentals A MULTI-BENEFIT METAL  Monetary  Industrial AN INCREASINGLY IMPORTANT RESOURCE  Growing industrial demand  Finite resource base SSRI:NDAQ | SSO: TSX 6

  7. Slide 7: Our Assets

    Our Assets PRODUCTION Pirquitas DEVELOPMENT Pitarrilla San Luis Diablillos RESOURCES Berenguela Challacollo San Agustin Veta Colorada Candelaria Maverick Springs Sunrise Lake SSRI:NDAQ | SSO: TSX 7

  8. Slide 8: Pirquitas: One of the Largest Open-Pit Primary Silver Mines

    PIRQUITAS ONE OF THE LARGEST OPEN-PIT PRIMARY SILVER MINES IN THE WORLD Source: Metals Economics Group. Based on annual production. SSRI:NDAQ | SSO: TSX 8

  9. Slide 9: Pirquitas at a Glance

    Pirquitas at a Glance (1) Average Annual Production +8.0M oz Ag 93Moz Resources (M + I) 150M oz Ag Mine Life 9 years 2012E direct mining RESERVES cost / oz $11.85 SSRI:NDAQ | SSO: TSX 9

  10. Slide 10: Pirquitas: Recent Accomplishments

    Pirquitas: Recent Accomplishments  Improved milling efficiency  Rebuilt ball mill gearbox Q4 2011  Increased crushing capacity  Installed new tertiary crusher Q1 2011  Operating at or above designed levels  Milling rates averaging above 4,800 tpd  Recovery rates averaging above 78%  Pursuing

  11. Slide 11: Pirquitas: Production Outlook

    Pirquitas: Production Outlook 12.0 10.0 8.0 - 10.0  2012 Guidance Silver Ounces Produced (millions) 8.0 8.2 - 8.5  8.2 - 8.5M oz Ag 7.1 6.0 6.3  10.5 - 11.5M lb Zn 4.0 2.0 1.1 0.0 2009 2010 2011 2012E LOM * * Over first 6.5 years of the mine plan. The final 2.5 years of production is the re-proce

  12. Slide 12: Pirquitas: Expanding The Resource

    Pirquitas: Expanding The Resource N S Cortaderas Current Pit Oploca +15,000m Valley Potosí TO BE DRILLED IN 2012 San Miguel 2-Level 100 m 200 m GEOPHYSICAL PROGRAM 300 m Cortaderas Breccia Reserve Pit Limit = Drilling Targets SSRI:NDAQ | SSO: TSX 12

  13. Slide 13: Pitarrilla: Our Large Scale Opportunity Discovered by Silver Standard

    PITARRILLA OUR LARGE SCALE OPPORTUNITY DISCOVERED BY SILVER STANDARD SSRI:NDAQ | SSO: TSX 13

  14. Slide 14: Pitarrilla at a Glance

    Pitarrilla at a Glance (2) Mine Design Open-Pit Plant Design 16,000 tpd with Leach & Flotation Circuits Resources (M + I) 656M oz Ag Estimated Construction Time ~3 Years SSRI:NDAQ | SSO: TSX 14

  15. Slide 15: Pitarrilla: Recent Accomplishments

    Pitarrilla: Recent Accomplishments  $25M investment in August 2011  Hired project manager and development team  Baseline environmental survey commenced  Released updated mineral resource estimate  Measured + Indicated: 655.7M oz Ag  Inferred: 65.0M oz Ag  Advanced construction and operations

  16. Slide 16: Pitarrilla: 2012 Feasibility Study

    Pitarrilla: 2012 Feasibility Study  Contracted M3 Engineering for Feasibility study  Scheduled to be completed by mid-year 2012  Design based on:  16,000 tpd open-pit mine  Leach and flotation processing facilities  Producing silver doré and separate zinc and lead concentrates SSRI:NDAQ | SSO:

  17. Slide 17: Pitarrilla: Mineralization Zones

    Pitarrilla: Mineralization Zones W Breccia Ridge E Javelina Creek / East South Ridge Cordon Colorado Likely Pit Shape SSRI:NDAQ | SSO: TSX 17

  18. Slide 18: San Luis: High-Grade Gold and Silver Project

    SAN LUIS HIGH-GRADE GOLD AND SILVER PROJECT SSRI:NDAQ | SSO: TSX 18

  19. Slide 19: San Luis at a Glance

    San Luis at a Glance (3) Estimated Average 1.9M oz Ag Annual Production 78,000 oz Au Resources 7.2M oz Ag (M + I) 0.29M oz Au Estimated Mine Life 3.5 Years (Ayelén vein only) Estimated Cap-Ex $90 - $100M Estimated Construction Time <2 Years SSRI:NDAQ | SSO: TSX 19

  20. Slide 20: San Luis: Recent Accomplishments

    San Luis: Recent Accomplishments  Feasibility study completed in Q2 2010 LA LIBERTAD  Consolidated interest in Q3 2011 ANCASH  Agreement with San Luis Pierina (Barrick) HUÁNCO Cochabamba community  Progressing negotiations PASCO with Ecash community LIMA JUNÍN SSRI:NDAQ | SSO: TSX 20

  21. Slide 21: San Luis: 2012 Focus

    San Luis: 2012 Focus  Drill the BP Zone targeting a copper porphyry  Gain approval for the Environmental Impact Statement  Continue advancing community programs  Land access agreements  Sustainable development projects SSRI:NDAQ | SSO: TSX 21

  22. Slide 22: Diablillos at a Glance

    Diablillos at a Glance (4) Resources 77M oz Ag (M + I) 0.64M oz Au 2012 Focus Increase resources with drilling program in H1 2012 SSRI:NDAQ | SSO: TSX 22

  23. Slide 23: San Agustin at a Glance

    San Agustin at a Glance (5) Resources 48M oz Ag (M + I) 1.59M oz Au 2012 Focus Expand gold resource with drilling program in H2 2012 SSRI:NDAQ | SSO: TSX 23

  24. Slide 24: Our Future

    Our Future 400KHECTARES +$20M OF UNDEREXPLORED, PROSPECTIVE LAND 2012 EXPLORATION INVESTMENT SSRI:NDAQ | SSO: TSX 24

  25. Slide 25: Successful Exploration Track Record

    Successful Exploration Track Record Reserves 192M oz Ag Measured & Indicated 1,149M oz Ag (Inclusive of reserves) Inferred 373M oz Ag Snowfield + Cash Proceeds: C$348M Brucejack Retained Interest: C$381M* = Budgeted 2012 Bowdens Sold for A$75M Drilling Programs * Based on 18.9 million shares at a pr

  26. Slide 26: Management and Board of Directors

    Management and Board of Directors Management Team John Smith Joe Phillips Gregory Martin Ron Burk John DeCooman President, CEO SVP, Operations SVP and Chief VP, Exploration VP, Business and Director and Development Financial Officer Development Board of Directors Peter Tomsett Richard C. Campbell Mi

  27. Slide 27: Now: Building Performance

    NOW BUILDING PERFORMANC E SSRI:NDAQ | SSO: TSX 27

  28. Slide 28: Mineral Reserves

    Mineral Reserves (6) Mineral Reserves Metal grade Contained metal Tonnes Silver Gold Lead Zinc Tin Silver Gold (mil.) (g/t) (g/t) (%) (%) (%) (mil. oz) (mil. oz) Pirquitas Proven 10.4 181.2 - - 0.52 0.26 60.4 - Probable 5.1 168.9 - - 1.04 0.19 27.6 - Stockpiles 1.2 129.2 - - 1.03 0.15 5.0 - Pitarril

  29. Slide 29: Mineral Resources: Measured & Indicated

    Mineral Resources: Measured & Indicated (6) Measured & Indicated Mineral Resources Metal grade Contained metal Tonnes Silver Gold Lead Zinc Tin Copper Silver Gold (mil.) (g/t) (g/t) (%) (%) (%) (%) (mil. oz) (mil. oz) Pirquitas* Measured 13.5 156.2 - - 0.49 0.24 - 68.0 - Indicated 19.3 132.4 - - 1.0

  30. Slide 30: Mineral Resources: Inferred

    Mineral Resources: Inferred (6) Inferred Mineral Resources Metal grade Contained metal Tonnes Silver Gold Lead Zinc Tin Copper Silver Gold (mil.) (g/t) (g/t) (%) (%) (%) (%) (mil. oz) (mil. oz) Pirquitas 7.0 99.7 - - 2.3 0.04 - 22.6 - Pitarrilla 31.3 64.7 - 0.18 0.44 - 0.01 65.0 - Diablillos 7.2 27.

  31. Slide 31: Reserves & Resources: Notes to Tables

    Reserves & Resources: Notes to Tables The Mineral Reserves & Resources Summary complies with National Instrument 43-101. Mineral Reserves have been calculated based on the following metal prices and cutoffs: Silver Tin Lead Zinc Copper Gold Cut-off Property (US$/oz) (US$/lb) (US$/lb) (US$/lb) (US$/l

  32. Slide 32: Presentation Footnotes

    Presentation Footnotes 1) See the NI 43-101 Technical Report on the Pirquitas Mine, Jujuy Province, Argentina, dated December 23, 2011 filed on SEDAR and available on the company’s web site. See news release dated January 12, 2012, for cost guidance. 2) See news release dated February 27, 2012, for

  33. Slide 33: Notes

    SILVER STANDARD SSRIINDAQ | SSO: TSX 33

  34. Slide 34: Notes

    SILVER STANDARD SSRIINDAQ | SSO: TSX 34

  35. Slide 35: Notes

    SILVER STANDARD SSRIINDAQ | SSO: TSX 35

  36. Slide 36: Corporate Presentation

    CORPORATE PRESENTATION SSRI:NDAQ | SSO: TSX 36