Lockheed Martin Corporation · NYSE:LMT

Lockheed Martin — Technical Presentation (2025)

12 slides from Lockheed Martin's technical presentation, Jan 29, 2025

  1. Slide 1: 2025 FAI Compliance Matrix Industry Guide

    2025 FAI COMPLIANCE MATRIX Industry Guide Non-Export Controlled Information LOCKHEED MARTIN REL TO LOCKHEED MARTIN, US DOD, © 2025 Lockheed Martin Corporation US DOMESTIC & FOREIGN SUPPLIERS

  2. Slide 2: Purpose

    PURPOSE  Introduce Lockheed Martin suppliers to the Compliance Matrix concept  Equip them to successfully use this Quality tool © 2025 Lockheed Martin Corporation

  3. Slide 3: Motivation for Change Within the Industry

    MOTIVATION FOR CHANGE WITHIN THE INDUSTRY Lockheed Martin Aeronautics has experienced significant cost and schedule impact to programs due to issues directly resulting from the lack of accountability for embedded specification requirements in the First Article Inspection (FAI) process across numerou

  4. Slide 4: The Compliance Matrix Tool

    THE COMPLIANCE MATRIX TOOL • Lockheed Martin Quality Clause Q2A Rev 16 requires the identification and verification of all embedded design characteristics within Lockheed Martin process specifications using a compliance matrix or individual line items on Form 3 • Premise: Lockheed Martin provides cl

  5. Slide 5: Compliance Matrix Attached to AS9102 Form 3

    COMPLIANCE MATRIX ATTACHED TO AS9102 FORM 3 FAI Compliance Matrix Note result referencing an attachment AS9102 Form 3 See attached 36A Zone 1D3 Fracture Critical Drill holes per ProcSpec XY Compliance Matrix © 2025 Lockheed Martin Corporation

  6. Slide 6: Compliance Matrix Example

    COMPLIANCE MATRIX EXAMPLE Field 9 Compliance Method What’s this for? Field 8 Requirement Result (Recommended) (Required) See next slide. (Required) Spec Nomenclature Different aspects of Design Characteristics (Content to be determined by each Supplier) (OPTIONAL) Section Headers © 2025 Lockheed Mar

  7. Slide 7: Compliance Matrix as a Risk Indicator

    COMPLIANCE MATRIX AS A RISK INDICATOR If supplier chooses to fill out this field, it can be used by Quality as a risk indicator for continued compliance Low Risk High Risk © 2025 Lockheed Martin Corporation

  8. Slide 8: The Compliance Matrix Tool

    THE COMPLIANCE MATRIX TOOL We are providing these tools both as an enabler for our Supplier Quality Engineers (SQEs) to properly oversight the process and as a benefit to our suppliers. If a supplier has its own process that adequately generates this objective evidence, they can use that and work wi

  9. Slide 9: Lockheed Martin Steps Forward

    LOCKHEED MARTIN STEPS FORWARD Lockheed Martin SQEs have been directed to increase their focus on oversight of contractually mandated FAI Planning in order to ensure the proper identification of all design characteristics while also verifying the successful documentation of those characteristics via

  10. Slide 10: Supplier Expectations

    SUPPLIER EXPECTATIONS  Review technical data package with your assigned SQE during the FAI planning stage to determine all embedded design characteristics invoked within required specifications  Determine if the specification has an available compliance matrix for use  Review the design requireme

  11. Slide 11: Compliance Matrix Benefits

    COMPLIANCE MATRIX BENEFITS  Initial investment of time spent executing the compliance matrix will be recouped when the Supplier can re-use the compliance matrix on similar parts  Use of the compliance matrix can: • Prevent future escapes • Reduce nonconformances • Prevent need for corrective actio

  12. Slide 12: Lockheed Martin

    LOCKHEED MARTINZS

Lockheed Martin — Technical Presentation (2025) on 6ix