    Whitehaven Coal Limited First Half Results FY2014 Sydney, Australia 26 February 2014

  2. Slide 2: Disclaimer

    Disclaimer Statements contained in this material, particularly those regarding the possible or assumed future performance, costs, dividends, returns, production levels or rates, prices, reserves, potential growth of Whitehaven Coal Limited, industry growth or other trend projections and any estimate

  3. Slide 3: First Half Results FY2014

    First Half Results FY2014 Key Themes and Safety Summary Financials Costs Operations and Capex Maules Creek Progress Investment Proposition Conclusion First Half FY2014 Results 3

  4. Slide 4: Key themes

    Key themes Strong growth in revenue, margins and earnings reflect major turnaround Strong operating cash flows funding operations, debt service costs, sustaining capex and contributing to development projects Unit costs down 10% driven by increased mine efficiency and improved utilisation of rail an

  5. Slide 5: Safety performance

    Safety performance Safety statistics at Narrabri remains significantly below NSW coal industry averages Performance at the open cut mines beginning to improve Note: Data includes WHC employees and contractors at all mine sites, Gunnedah CHPP and Corporate office. LTIFR refers to lost time injury fre

  6. Slide 6: Financial highlights

    Financial highlights Headlines HY14 HY13 Comment on HY14 Increase driven by 48% increase in sales EBITDA before significant items ($’m) 50.8 6.0 volume, primarily due to Narrabri ramp up, and reduced unit costs per tonne HY14 significant items relate to Sunnyside EBITDA including significant items (

  7. Slide 7: Costs trending down

    Costs trending down H1 H2 H1 (1) On a like for like basis mine coal sales have FY2014 FY2013 FY2013 (1) increased 63% over the same period last year, driven by the doubling of Narrabri Coal Sales (equity basis, excl. purchased coal) '000t 4,302 3,355 (3) 2,639 production. The coal sales mix for the

  8. Slide 8: Delivering on targets

    Delivering on targets TARGETS OUTCOME Improve safety performance at all operations Safety statistics showing improvement Production records at Narrabri and open cut mines on Ensure current operations are performing to plan plan Continue to reduce FOB costs Costs continued to reduce across the mine p

  9. Slide 9: Coal sales - on target

    Coal sales - on target Strong performance by the Narrabri Mine resulted in record sales for the half Purchased coal sales as a proportion of total sales have declined as logistical issues are resolved and production increases Equity Basis – 000t H1 FY2014 H1 FY2013 Change Open Cuts (including purcha

  10. Slide 10: Saleable coal production - on target

    Saleable coal production - on target Excellent performance by the longwall at Narrabri increased Whitehaven production by 37%, achieving a new half year record for the company Open cut production on plan Equity Basis – 000t H1 FY2014 H1 FY2013 Change Open Cuts 2,042 2,053 -1% Narrabri 2,039 929 119%

  11. Slide 11: Narrabri exceeding expectations

    Narrabri exceeding expectations Record ROM coal production of 3.29Mt for the half with 193kt produced in a single week. Saleable coal Narrabri HY Saleable Coal Production production was 2.91Mt (managed) (000's t) 3,500 Completed the first longwall relocation on schedule 3,000 early in the half 2,500

  12. Slide 12: Disciplined allocation of capital

    Disciplined allocation of capital Capital Investment - $ Million H1 FY2014 H1 FY2013 Sustaining capex Mine Sustaining Capital Sustaining capex at the operating mines has been maintained at minimum levels without compromising Open Cuts 5.1 6.9 production Narrabri 2.5 15.5 Sustaining capex during H1 F

  13. Slide 13: Narrabri development costs

    Narrabri development costs Narrabri Development Costs - $ Millions H1 FY2014 H1 FY2013 Longwall “float” remains at a comfortable level to Narrabri cash development costs 36.3 61.2 ensure longwall mining continuity Reduction in Narrabri development costs reflect Development costs amortisation charge

  14. Slide 14: Capital management remains a key focus

    Capital management remains a key focus 31-Dec 2013 30-Jun 2013 Increase in interest bearing liabilities comprises: $’m $’m • Drawings of $30.0 million from the corporate debt facility to fund capital expenditure on the Maules Cash on hand 97.7 110.5 Creek development. • New finance leases of $56.8 m

  15. Slide 15: Maules Creek construction underway

    Maules Creek construction underway Tier 1 World Class Mine Mine Infrastructure Simple and well understood geology with multiple seams, no major faulting and a low strip ratio High quality resource of PCI, SSCC and high energy thermal coal Maules Creek Rail Loop Situated close to existing infrastruct

  16. Slide 16: Maules Creek - project schedule

    Maules Creek - project schedule Site Access Rail Construction CHPP Construction Box Cut First Coal to Trains 13 months to first coal railed Production to 6Mtpa ROM Potential expansion to 13Mtpa ROM CY Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2013 2014 2015 2016 Confirming scheduled delivery First H

  17. Slide 17: Construction progress Maules Creek

    Construction progress Maules Creek 100% Maules Creek Coal Overall Project- S-Curve Simple project built by 90% “A” group contractors 80% Work already completed 70% Legend includes the fabrication of the Actual CHPP with delivery to Narrabri 60% Forecast 50% Rail and access road corridor cleared and

  18. Slide 18: Major contract progress

    Major contract progress CONTRACT STATUS CHPP design and fabrication Completed with CHPP in yard in Narrabri Rail spur and access road Awarded to Leighton and work underway Construction and permanent water supply Awarded with work well advanced Bulk earthworks for mine site Awarded with contractor mo

  19. Slide 19: De-risking Maules Creek

    De-risking Maules Creek Maules Creek Capital Expenditure Construction and Other Risks (100% basis) Key risk areas for the rail construction are Total estimate $767 million blasting, material movement and weather Rail conditions. Work being performed by highly Spent to date $224 million regarded cont

  20. Slide 20: Preparing to mine as owner operator

    Preparing to mine as owner operator Contract miner quotes for Maules Creek were not deemed competitive Decision taken to go owner operator at the mine Review Mining Model Whitehaven currently operates mines in close proximity to Maules Creek so completely understands the mining costs in the region L

  21. Slide 21: Mining equipment ordered

    Mining equipment ordered Ultra class mining equipment order has been placed for the initial 6Mtpa fleet, coaling truck order still to be placed Selected ultra class equipment for overburden mining Productivity benefits and the ability to match equipment (trucks and excavators) provides significant c

  22. Slide 22: Recent project images of Maules Creek

    Recent project images of Maules Creek First Half FY2014 Results 22

  23. Slide 23: Maules Creek rail path and loop

    Maules Creek rail path and loop First Half FY2014 Results 23

  24. Slide 24: Whitehaven and the community

    Whitehaven and the community Whitehaven currently employs over 600 people with over 84% living in the region around its operating mines Wages to employees in the region total $86 million each year, boosting the local economy Whitehaven has set out an aspirational target of 10% for the Maules Creek w

  25. Slide 25: Investment proposition - unmatched growth

    Investment proposition - unmatched growth Saleable Production by Mine 25.0 21 20 20.0 Production is expected to double by FY2017 as Maules Creek ramps up million's tonnes 14 toward its full capacity 15.0 11 Saleable production in FY2014 is 10.0 expected to be 10.7Mt on a 100% 8 basis 5.0 The Vickery

  26. Slide 26: Investment proposition - low cost capacity

    Investment proposition - low cost capacity Capex $US/t Annualised Capacity 250 The estimated construction capital cost of $767 million on a 100% basis for a mine 200 producing 13Mtpa is low at A$64/t compared to many other coal projects developed in 150 recent years 100 50 Low construction cost comb

  27. Slide 27: Investment proposition – broker consensus

    Investment proposition – broker consensus Investment Bank Modelling Project NPV (A$m’s) Share Price Share Price Maules Creek Project Discount/ Discount/ Premium Premium UBS 1,867 Goldman Sachs 2,237 WHC Share $1.70 Price CIMB 2,307 Mean (1) Median (1) Citi 2,977 Target Price $2.50 (32%) $2.40 (29%)

  28. Slide 28: The focus for CY2014

    The focus for CY2014 Ensure construction of the Maules Creek project remains on schedule and budget Develop long term markets and sales contracts for all Maules Creek production Recruit and commence training of diversified workforce for Maules Creek Engage with local indigenous groups to achieve an

  29. Slide 29: Conclusion

    Conclusion Whitehaven is generating positive operating cash flow Whitehaven to reduce average costs further when Maules Creek commences production Narrabri and the open cut mines to produce at or above planned levels Construction of Maules Creek is progressing on schedule and budget Funding committe

  30. Slide 30: Thank you

    Thank you www.whitehavencoal.com.au

  31. Slide 31: Appendices

    Appendices First Half FY2014 Results 31

  32. Slide 32: Where we operate

    Where we operate Maules Creek (75%) • Reserves to support ~ 30 years • Permitted & Planned : 13 Mtpa ROM • SSCC, PCI and high energy thermal Narrabri North (70%) • Reserves to support ~ 25 years • Permitted : 8 Mtpa ROM • Planned : 6 Mtpa ROM • PCI & low ash thermal coals Tarrawonga (70%) • Reserves

  33. Slide 33: Reconciliation - NPAT to Operating EBITDA

    Reconciliation - NPAT to Operating EBITDA A$ millions H1 - FY2014 H1 - FY2013 Net profit/(loss) for the period attributable to members (11.6) (48.6) Add back: Significant items after tax (1) 2.7 19.5 Net profit/(loss) before significant items (8.9) (29.1) Profit/(loss) before tax (16.0) (67.8) Add b

  34. Slide 34: Significant Items

    Significant Items A$ millions H1 - FY2014 H1 - FY2013 Included within the balances presented on the face of the Consolidated Interim Statement of Comprehensive Income: Operating Expenses: Suspension of mining activities and office closures (2.0) (22.9) Other expenses: Share-based payment expense - (

  35. Slide 35: Balance sheet at 31 December

    Balance sheet at 31 December A$ millions 31 Dec - 2013 30 June - 2013 Cash 97.7 110.5 Current receivables 102.8 87.3 Other current assets 57.9 58.4 Current assets 258.4 256.2 Non-current receivables 32.6 37.8 Other non-current assets 3,870.6 3,806.8 Total assets 4,161.6 4,100.8 Current payables 142.

  36. Slide 36: First half cash flow

    First half cash flow A$ millions H1 FY2014 H1 FY2013 Cash from / (used in) operations 78.3 (100.1) Interest and tax payments (22.0) (13.6) Net cash from / (used in) operating activities 56.3 (113.7) Capital investment (139.2) (124.2) Other investing activities (including cash from acquisition of sub

Whitehaven Coal — H1 FY2014 Earnings Presentation on 6ix