Waratah Minerals Limited · ASX:WTM

Waratah Minerals — Investor Presentation (August 2023)

15 slides from Waratah Minerals's investor presentation, Aug 30, 2023

  1. Slide 1: Investor Presentation: Defining a New Intrusion-Related Gold District

    INVESTOR PRESENTATION DEFINING A NEW INTRUSION-RELATED GOLD DISTRICT IN WESTERN VICTORIA 30 August 2023

  2. Slide 2: Company Overview

    COMPANY OVERVIEW DEFINING A NEW INTRUSION-RELATED GOLD DISTRICT IN VICTORIA  Multiple IRG targets in White Rabbit District, 15km from Stawell Gold Mine1  Stawell Gold Mine (>5MOz1) (Stawell Gold Mines Pty Ltd - Arete Capital Partners) DISCOVERY  Initial drilling results have confirmed Intrusion-r

  3. Slide 3: Stavely-Stawell Project

    Stawell Gold Mine BAT 5Moz STAVELY-STAWELL PROJECT EL6871 TARGETING THE WHITE RABBIT INTRUSIVE Stawell-Wonga IRG Deposit 294k oz COMPLEX FOR INTRUSION-RELATED GOLD (IRG) • 60 km strike of Stawell Gold Corridor – Stavely-Dryden Belt • Last sustained exploration effort early 1990s (Gold @ A$400/oz) •

  4. Slide 4: Intrusion-Related Gold Systems Exploration Model

    Intrusion-Related Gold Systems (IRGS) Exploration Model STAVELY-STAWELL PROJECT INTRUSION - RELATED GOLD SYSTEMS (IRGS) ATTRACTIVE EXPLORATION TARGET – NOTABLE DEPOSITS POGO - 8Moz @ 13.6g/t Au 1 FORT KNOX - 7Moz @ 0.83g/t Au 1 STAWELL-WONGA – 6moz 1 KIDSTON – 5Moz @ 1.7g/t Au 1 MINERALISATION STYLE

  5. Slide 5: Stavely-Stawell Project: Intrusion-Related Gold Systems

    STAVELY-STAWELL PROJECT INTRUSION - RELATED GOLD SYSTEMS (IRGS) ATTRACTIVE EXPLORATION TARGET – NOTABLE DEPOSITS POGO - 8Moz @ 13.6g/t Au 1 FORT KNOX - 7Moz @ 0.83g/t Au 1 STAWELL-WONGA – 6moz 1 KIDSTON – 5Moz @ 1.7g/t Au 1 MINERALISATION STYLES 1) Intrusion-hosted, sheeted vein arrays Hart 2007 2)

  6. Slide 6: Four Priority IRG Targets 15km from Stawell Gold Mine

    Sporadic hist. gold assaying BILLYGOAT 1m @ 3g/t Au from 6m (AC93AA114) 24m @ 0.21g/t Au from Rockchips to 16 g/t Au 24m to EOH (23BATAC036) COSMOPOLITAN STAVELY-STAWELL PROJECT 1m @ 0.99g/t Au at EOH (22AC134) Rock chips >10 g/t Au FOUR PRIORITY IRG TARGETS – 15km FROM DD results pending DD8 STAWEL

  7. Slide 7: White Rabbit District: Large IRG System at Coxs Find

    WHITE RABBIT DISTRICT Drilling and geophysics define large IRG system at Coxs Find COXS FIND – Major IRG alteration zone, thickening + increasing pathfinder anomalism indicates northerly vector i.e. drill stepout to the north 23BATDD006 – 50m north from DD003 - 273.5 - 291.8m (18.3m) - Massive, inte

  8. Slide 8: White Rabbit District: Large IRG System at Coxs Find

    WHITE RABBIT DISTRICT Drilling and geophysics define large IRG system at Coxs Find COXS FIND – Major IRG alteration zone, thickening + increasing pathfinder anomalism indicates northerly vector i.e. drill stepout to the north NORTH COXS FIND COXS FIND SOUTH 23BATDD006 – 280m, massive zone of IRG alt

  9. Slide 9: White Rabbit District: Large IRG System at Frankfurt

    WHITE RABBIT DISTRICT Drilling and geophysics define large IRG system at Frankfurt FRANKFURT – drilled ‘halo’ IRG mineralisation / geophysics indicates easterly vector i.e. drill stepout to the east 8m @ 0.79g/t Au from 27m @ 0.62g/t Au from 24m @ 0.21g/t Au from 27m to EOH (22BATAC136) 15m to EOH (

  10. Slide 10: Azura Project

    Argyle Diamond AZURA PROJECT COPPER - NICKEL - COBALT - PGEs • Underexplored, multiple target styles Savannah ( Ni-Cu ) • Michigan Cu-Ag • Magmatic Ni – Cu - PGEs AZURA • Skarn Cu-Au PROJECT • Mesothermal Au - Cu/Pb/Zn/Ag Panton ( PGE ) Copernicus ( PGE ) • Operating Mines • Savannah Ni-Cu-Co (PAN.A

  11. Slide 11: Azura Project: Drill Targets, EM Anomalies, Surface Geochem

    AZURA PROJECT DRILL TARGETS - EM ANOMALIES - STRONG SURFACE GEOCHEM • Priority Cu-Ni-Co-PGE drill targets identified • EM conductors + strong surface Cu anomalism, up to 29.9% Cu rockchips (ASX BAT 22 June 2021) • Olympio Target: coincident strong conductivity (600m long at 100m depth) and concealed

  12. Slide 12: Company Investment in Emerging High Margin Graphite Producer

    Tirupati Graphite Operations1 UKFY23 Results AUD Production 4,770t Average Flake Production Cost $597/t COMPANY INVESTMENT IN Average Flake Price achieved $1,365/t Average operating margin $768/t EMERGING HIGH MARGIN Revenue $5.4m Production expansion underway1 GRAPHITE PRODUCER Gross Profit $2.6m L

  13. Slide 13: High Impact Newsflow

    HIGH IMPACT NEWSFLOW ACTIVITY SUMMARY DISCOVERY ACTIVITY SEPT QTR DEC QTR MAR QTR GOLD-COPPER Target Definition, inc. geophys GOLD-COPPER STAWELL Drilling - AC Drilling – DD INVESTMENT Enviro Surveys GRAPHITE COPPER- NICKEL AZURA Field work / Drilling Value Accretive Acquisition GEN Estimates of tim

  14. Slide 14: References

    REFERENCES ASX BAT 2 May 2022 Coxs Find High Grade Gold ASX BAT 11 July 2022 Stavely-Stawell Update ASX BAT 27 September 2022 IP Commences at Stawell ASX BAT 21 November 2022 IP Defines Priority Targets at Stawell ASX BAT 3 April 2023 Completion of Tirupati Sale ASX BAT 17 May 2023 White Rabbit Maid

  15. Slide 15: Disclaimer – Important Information

    DISCLAIMER – IMPORTANT INFORMATION Forward Looking Statements Previously Reported Information • This announcement contains “forward-looking statements” within • The information in this presentation that relates to Mineral Resources in the • The information in this report that references previously r

Waratah Minerals — Investor Presentation (August 2023) on 6ix