Vantage Metals Limited · ASX:VAN

Vantage Metals — Belararox — Investor Presentation (February 2025)

28 slides from Vantage Metals's investor presentation, February 2025

  1. Slide 1: Investor Presentation & Activity Update

    Investor Presentation & Activity Update February 2025 Exploring for Large Copper deposits

  2. Slide 2: Disclaimer

    Disclaimer Belararox Limited (”The Company”) does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this document. Recipients of this document should carefully consider whether the securities to be issued

  3. Slide 3: Corporate Overview

    Corporate Overview BOARD OF DIRECTORS CAPITAL STRUCTURE Share Price* A$0.18 52 Week Range $0.125 – 0.37 Shares on Issue 143,964,113 Options expiring 13 July 2026 (66c exercise price ASX:BRXOA) 38,716,761 Mr. Neil Warburton Mr. Arvind Misra Mr. Jason Ward Mr. John Traicos Performance Rights on issue

  4. Slide 4: Investment Highlights - TMT

    Investment Highlights - TMT EXPLORING FOR ELEPHANTS IN A LAND OF COPPER GIANTS TMT Project (100% BRX) Proven Track Record Poised to Deliver Significant Growth • Developing the Company’s TMT • Proven exploration team with a • Drilling of multiple large porphyry targets Project in San Juan, Argentina

  5. Slide 5: Peer Performance – Significant Value Creation Upon Discovery

    Peer Performance – Significant Value Creation Upon Discovery Recent local discoveries in the northern San Juan region have resulted in significant value creation • The below chart reflects the uplift in market capitalisation of select companies that have made an epithermal and/or porphyry discovery

  6. Slide 6: TMT Project (100% BRX) – San Juan, Argentina

    TMT Project (100% BRX) – San Juan, Argentina EXPLORING FOR ELEPHANTS IN A LAND OF COPPER GIANTS Strategically located near major Highly prospective 32,000 hectares copper and gold discoveries such as landholding located in an area Filo del Sol (Lundin), Los Helados boasting large copper porphyry (NG

  7. Slide 7: Two High Priority Targets to be Drilled Tested

    Two High Priority Targets to be Drilled Tested Systematic Exploration Tambo North 2 • Target-rich environment • 16 priority targets identified by BRX to date Tambo North Earthworks • Brig SRL to receive 50% of all fees in BRX shares Tambo V • Road access and access to tracks for drilling Malambo 4 p

  8. Slide 8: Tambo South Fieldwork - Drilling Commenced January 2025

    Tambo South Fieldwork - Drilling Commenced 19 January 2025 8

  9. Slide 9: Tambo South – Planned Drillholes

    Tambo South – Planned Drillholes 2024/25 Drilling Program • 2,600 m of diamond drilling planned in two drill holes. • Targets high probability porphyry system (interpreted from 3D geochemical modelling) within 900m from surface. • Holes will also intersect shallower target interpreted. • Planned hol

  10. Slide 10: Drilling Update TMT-TSU-DDH-001

    Drilling Update TMT-TSU-DDH-001 Covellite Hole summary • Target depth: 900 m • Planned depth: 1300 Covellite • Current depth: 410 m (1-Feb-2025) Highlight • Covellite was observed in the core at 287 m • The presence of covellite is Covellite encouraging as it is an indicator of indication of high su

  11. Slide 11: Malambo – Drill Road Construction, Magnetics Survey and Fieldwork

    Malambo – Drill Road Construction, Magnetics Survey and Fieldwork Complete at Malambo (100% complete at Toro, 09 Jan planned for Tambo South) 11

  12. Slide 12: Malambo – Collar Locations With Hydrothermal Alteration

    Malambo – Collar Locations With Hydrothermal Alteration Three Drill Holes are Planned for ~3400m • The location of the third hole (3 or 3*) is dependent on the results of DDH1 and 21 Satellite Oblique-View DDH 1 DDH 1 DDH 2 DDH 3* DDH 2 DDH 3 DDH 3 DDH 3* Note 1: The actual locations of drill pads a

  13. Slide 13: Malambo – Planned Drillholes

    Malambo – Planned Drillholes 2024/25 Drilling Program • Drilling to commence 7 February 2025 • 3400m of diamond core drilling planned • 3 drillholes target below outcropping potassic alteration zone • Planned hole depths of 1000m to 1200m • Targets high probability porphyry system within 600m from s

  14. Slide 14: Geochemistry Cohen - Halley Model

    GEOCHEMESTRY COHEN - HALLEY MODEL

  15. Slide 15: TMT Project – Lola Target

    TMT Project – Lola 2 Target 1 15

  16. Slide 16: TMT Project – Lola Target

    TMT Project – Lola 2 Target • Fine-grained diorite, mod. to strong phyllic alteration + high fracture abundance. • Two vein-like structures were observed cross-cutting the diorite: A) Quartz-Carbonate with copper carbonates: Azurite + Malachite; B) massive Quartz with Pyrite. • Geochemical grid rock

  17. Slide 17: TMT Project - Emilia Vein

    TMT Project - Emilia Vein 17

  18. Slide 18: TMT Project - Emilia Vein

    TMT Project - Emilia Vein Description Interpreted as a low-medium sulphidation epithermal system distal to a porphyry system. • Quartz Vein Pseudo vuggy filled with Goethite • Outcrop length of 300 meters • Average thickness of 1-2 meters Fluid textures • Strike: 160°/170° • Dip 70° Visual estimates

  19. Slide 19: Satellite-Supported Spectral Zone of Interest

    Satellite-Supported Spectral Zone of Interest Near Tambo South VI-2 Tambo South Spectral zone of interest Panoramic-view, looking west towards the Chile – Argentina border from the Malambo drill access road (approx. 12km field of view). The dashed line approximately outlines the northerly-trending,

  20. Slide 20: TMT Project – Key Activities

    TMT Project – Key Activities Maiden Drilling commenced at TMT Project 19-January 2025 CompletedWorks Completed Works CivilWorks Civil Works Targetgeneration Target generation Sep2024 Sep 2024- -Apr Apr2025 2025 Reconnaissance Reconnaissance Reconnaissance Constructdrill Construct drillrig rig Oct202

  21. Slide 21: Investment Highlights - KCB

    Investment Highlights - KCB EXPLORING FOR COPPER GIANTS IN THE LAND OF ELEPHANTS KCB Project (100% BRX) Proven Track Record Poised to Deliver Significant Growth • Kalahari Copper Belt project in • Proven exploration team with a • Kalahari Copper Belt has the highest Botswana - A region hosting succe

  22. Slide 22: MOD Resources … a Demonstrable Botswana Copper Success Story

    MOD Resources … a Demonstrable Botswana Copper Success Story 1,800% September 2016: Maiden MRE – August 2017: 1,600% 28Mt @ 1.24% Cu MRE Upgrade – 36Mt June 2019: @ 1.14% Cu July 2018: Sandfire announces 1,400% MRE Upgrade – acquisition of MOD (A$167m / March 2016: 60Mt @ 0.98% Cu 45% premium) 1,200

  23. Slide 23: BRX - KCB Project

    BRX - KCB Project Asset • Project located in the Kalahari Copper Belt in Botswana • 14 tenements covering 4,268 km2 of land in prospective areas Highlights • The observed structures in areas with known mineralisation extend to BRX tenements • Most tenements along the interpreted N’gwako Pan Formatio

  24. Slide 24: Field Program Underway

    Field Program Underway Positive Initial Assessment 2025 Exploration Program Objectives • Promising targets identified in Dr. Jacques Batumike's • Positive community engagement review • Verify regolith mapping interpreted from Aster and • Focus on D'Kar/Ngwako Pan contact and strike extensions Sentin

  25. Slide 25: KCB Project – Key Activities

    KCB Project – Key Activities Indicative Timing for KCB Activities Completed Works Mapping and Sampling Exploration Strategy Jan 2025 - Feb 2025 Geophysics & Mapping Aster and Sentinel-2 Apr 2025 – May 2025 Drilling Field reconnaissance Jun 2025 – Dec 2025 regolith mapping Assays & AMT survey on 5 Id

  26. Slide 26: Investment Highlights - Australia

    Investment Highlights - Australia Belara Project • Comprehensive tenement package spanning the northern extent of the Hill End Trough. • Drilling intersected several shallow, high-grade zones including: • 7m @2.54% Cu, 2.22 % Zn (from 78m) • 5m @1.19% Cu, 6.8% Zn (from 51m) • Mineral resource estima

  27. Slide 27: Belararox Limited

    Belararox Limited Discovering Copper Giants Belararox Limited (ASX:BRX) Arvind Misra Managing Director arvind.misra@belararox.com.au Paul Berson Corporate Storytime paul@corporatestorytime.com www.belararox.com.au This presentation has been authorised for release by the Board of Directors. 27

  28. Slide 28: Competent Person Statements

    Competent Person Statements Competent Person Statement Mr Jason Ward is a Competent Person who is a Fellow and Chartered Professional of the Australasian Institute of Mining and The information in this announcement that relates to Belara and Bullabulling exploration results is extracted from ASX Met

Belararox — Investor Presentation (February 2025) on 6ix