Southern Cross Electrical Engineering Limited · ASX:SXE

Southern Cross Electrical Engineering — FY2010 Earnings Presentation

24 slides from Southern Cross Electrical Engineering's earnings presentation, Sep 16, 2010

  1. Slide 1: 2010 Annual Results Presentation

    For personal use only 2010 Annual Results Presentation

  2. Slide 2: Presentation Overview

    Presentation Overview For personal use only • 2010 full year results • Four pillars • Safety and people • Strategy • Summary & Outlook 1

  3. Slide 3: 2010 Financial Results

    2010 Financial Results For personal use only 2

  4. Slide 4: Group Highlights

    Group Highlights For personal use only • Underlying NPAT $11.7m (excludes business acquisition costs of $3.0m) • Statutory NPAT $8.7m Financial • Australian SCEE revenue up 3% • 6.5 cps fully franked dividend for 2010 • Solid contribution from acquisitions • Sixth year in a row with 0 LTIs • $40m of

  5. Slide 5: Financial Overview

    Financial Overview For personal use only Jun 10 Jun 09 % change Sales revenue $m 93.4 100.3 -6.9% EBITDA $m 18.3 26.9 -32.0% Underlying NPAT $m 11.7 15.5 -24.5% Statutory NPAT $m 8.7 15.5 -43.9% NPAT margin % 12.5 15.4 -19.4% EPS cps 7.1 12.9 -45.0% DPS cps ff 6.5 6.5 0.0% Return on equity % 18.3 37

  6. Slide 6: Historical Financial Performance

    Historical Financial Performance For personal use only SCEE Five Year Gross Profit SCEE Five Year EBITDA SCEE Five Year NPAT 40 30 20 $ Millions $ Millions $Millions 25 30 20 15 20 15 10 10 10 5 5 0 0 0 FY06 FY07 FY08 FY09 FY10 FY06 FY07 FY08 FY09 FY10 FY06 FY07 FY08 FY09 FY10 SCEE Five Year GP % SC

  7. Slide 7: Revenue Contribution

    Revenue Contribution For personal use only Revenue by Business ($M) • Revenue from SCEE Australia 120 increased by $2.7m 100 • International revenue decreased $27.6m due to lack of projects 80 • Acquired businesses contributed 60 $21.9m • Gross margins from SCEE Australia 40 increased, however, chan

  8. Slide 8: NPAT Contribution Analysis

    NPAT Contribution Analysis For personal use only NPAT Contribution ($M) 25 20 15.5 15 10 8.7 5 - FY09 NPAT SCEE International SCEE Australia FY10 Acquisitions Acquisition Costs FY10 NPAT 7

  9. Slide 9: Four Pillars

    8 For personal use only Four Pillars

  10. Slide 10: Minerals & Metal Australia Revenue Contribution

    Minerals & Metal Australia Revenue Contribution For personal use only • Major projects included Brockman 4, Mesa A and Tiwest Mining Australia • National 2009 NECA Excellence in Other Safety Award for Cape Lambert port upgrade • National 2009 NECA Excellence in Industry Award for Cape Lambert port u

  11. Slide 11: Oil & Gas Revenue Contribution

    Oil & Gas Revenue Contribution For personal use only • Re-entry into the oil & gas space with award of Pluto off-take and storage E & I contract Oil & Gas Other • Strategically important for Group’s future growth with Gorgon construction commencing in 2011 • Safety performance recognised by NECA wit

  12. Slide 12: Infrastructure Revenue Contribution

    Infrastructure Revenue Contribution For personal use only • Major projects include Brockman 4 and Sino Iron Infrastructure • Acquisition of K.J. Johnson & Co Other increases power line capacity • Leveraging Oceanic’s presence to tender for east coast power line contracts • Large greenfield minerals

  13. Slide 13: Minerals & Metal International Revenue Contribution

    Minerals & Metal International Revenue Contribution For personal use only • 2010 was substantially lower due to a lack of international projects Mining International Other • Contributed approx $30m in 2009 • Pipeline in South America and Africa has improved with award decisions expected over coming

  14. Slide 14: Safety and People

    13 For personal use only Safety and People

  15. Slide 15: Safety Performance

    Safety Performance For personal use only SCEE TRCFR (2003 - 2010) 50 700,000 45 600,000 40 35 500,000 Hours worked 30 400,000 25 20 300,000 15 200,000 10 100,000 5 0 0 TRCFR Hours worked • 0 LTI’s recorded for last 6 years • 2007 national NECA award winner for excellence in safety • 2009 national NE

  16. Slide 16: Our Team

    Our Team For personal use only Permanent employees 90 Permanent staff retention 90% Total employees 412 Apprentices 25 Indigenous trainees 11 Training and development • Dedicated Training Supervisor and training management systems • Continued investment in hazardous area training • Leadership and me

  17. Slide 17: National Electrical and Communication Association Awards

    National Electrical and Communication Association Awards For personal use only (2010) State OH&S Excellence Category – Pluto (2009) National OH&S Excellence Category – Cape Lambert Port Upgrade (2009) National Industrial Category – Cape Lambert Port Upgrade (2007) National OH&S Excellence Category –

  18. Slide 18: Strategy

    17 For personal use only Strategy

  19. Slide 19: SCEE – an E&I Market Leader

    SCEE – an E&I Market Leader For personal use only Core values, Our Customers Our Performance • Proven track record with blue-chip customers over 32 years • Proven ability to set-up and perform in remote locations key strengths Our People Our Experience • A deeply experienced team across all levels o

  20. Slide 20: Four Pillars

    Four Pillars For personal use only Australian International Minerals & Oil & Gas Infrastructure Mining Metals Overhead power LNG downstream Process plants lines and Process plants process plant switchyards Bulk material CSG compressor Power generation Bulk material handling facilities stations facil

  21. Slide 21: Major Minerals and Energy Projects

    Major Minerals and Energy Projects (cont) For personal use only Projects – 8 Projects – 13 Cost - $67.2bn Cost - $5.2bn Projects – 6 Cost - $4.1bn Key Oil & Gas Mining & Processing Projects – 23 Cost - $25.8bn $ Source: List of Major Minerals and Energy Projects, Abare Economics, October 2009 20

  22. Slide 22: Australian tracked projects

    Australian tracked projects For personal use only Estimated E&I % of Total Estimated Expected Expected Engineering Estimated Project Description Sponsor Project E&I Contract Commenc- Completion Construction Engineering Value ($m) ($m) ement Date ($m) Construction Sino Project CITIC Pacific 1,363 954

  23. Slide 23: Summary & Outlook

    22 For personal use only Summary & Outlook

  24. Slide 24: Summary & Outlook

    Summary & Outlook For personal use only • Post GFC, key clients have re-commenced their project investment plans • Contracted revenue currently at $40m with tenders totalling approximately $250m in the decision phase • Successful re-entry into oil & gas market places SCEE in a strong position for up

Southern Cross Electrical Engineering — FY2010 Earnings Presentation on 6ix