  1. Slide 1: First Lithium Minerals Corp.

    First Lithium Minerals Corp. C A N A D I A N L I T H I U M A N D C R I T I C A L M E TA L S E X P L O R AT I O N A N D D E V E L O P M E N T C O M PA N Y C S E : F L M | OT C : F L M C F | F S E : X 2 8 Q3 2026

  2. Slide 2: Cautionary Statements

    Cautionary Statements Information set forth in this presentation contains forward-looking statements that are based on assumptions as of the date of this presentation. These statements reflect management's current estimates, beliefs, intentions and expectations. They are not guarantees of future per

  3. Slide 3: Ascotan Lithium Brine Project (Chile) and Lidstone Gold (Ontario)

    Ascotan Lithium Brine Project (CHILE) ❖ 6,400 ha of exploration concessions ❖ 100% ownership, no royalties ❖ Hydrogeologic setting of the Andean plateau (“lithium triangle”) ❖ Excellent infrastructure: power, highway and railroad onsite, water, access to seaport ❖ Two geophysical surveys 47 line-km;

  4. Slide 4: Corporate Profile

    Corporate Profile CSE: FLM Shares issued and outstanding 112.2 million Share price $0.11 Market cap. (Aug. 26, 2026) $12.3MM Cash $2.0 MM No Debt No warrants Options 4,350,000 @ $0.08 exp. Dec. 2028 4

  5. Slide 5: Management and Board

    Rob Saltsman | President, CEO and Director Mr. Saltsman has 25 years of experience in venture capital and public investments and is the Founder of First Lithium Minerals Corp., a company he founded in 2017. He served as the CEO of Compel Capital Inc. and RMM Ventures Inc., and as Vice President of G

  6. Slide 6: Lithium Price

    Lithium Price Continued recovery in lithium prices in 2026 Spot LCE prices stabilized at USD $22/kg, which made brine producers cash flow positive with a healthy operating margin Lithium battery storage systems started to account for more than 20% of the total demand Strong EV and battery storage sy

  7. Slide 7: Lithium Demand

    DEMAND ~1.5 MM TPY LCE 2026 Others, 10% Other Batteries, 20% Lithium Demand EV Batteries, 70% Lithium demand is expected to continue be driven by EV, consumer electronics, grid, and mobility DEMAND ~2.8 MM TPY LCE 2030E Others, 8% Other Batteries, 17% EV Batteries, 75% Source: SQM, S&P Global, Indus

  8. Slide 8: Lithium Supply

    Share of lithium minerals and brine production LCE tpy (%) Lithium Zimbabwe 1% United States 1% Portugal Supply Brazil 1% Argentina 6% 1% China 13% Global lithium production is expected to reach ~ 1.6 million tpy LCE in 2026 Australia Inelastic nature of supply 52% Long time to bring new capacity on

  9. Slide 9: Salar de Ascotan Project

    Salar de Ascotan Project 9

  10. Slide 10: Project Location and Infrastructure

    Project Location and Salar de Ascotan Project Infrastructure One of the six lithium salars approved by the Chilean Government for priority development EL Abra Copper Mine Hydrogeologic settings of the Andean plateau bordering Bolivia Cerro Pabellion Geothermal Plant Access from the town of Calama, C

  11. Slide 11: Topography of the Salar de Ascotan

    Topography of the Salar de Ascotan The salar basin is bordered on the north by the Salar de Carcote basin, on the east by volcanic chains bordering Bolivia To the south, the basin is bordered by the San Pedro de Inacaliri River basin, while to the west the basin is cut-off by a volcanic chain summit

  12. Slide 12: Mineralization

    Mineralization Mineralization in the Salar de Ascotan Project is primarily represented by three different fractions: ❑Liquid, represented mainly by chloride and sulfate brines ❑Dendritic material, consisting of sand, silt and clay intercalated in the salar sediments ❑Various precipitated salt compou

  13. Slide 13: Salar de Ascotan Exploration Target

    Salar de Ascotan Exploration Target 6,400 ha of exploration concessions form on-going exploration and potential resource delineation target Sediment brine sampling up to 1,300 mg/L Li Climate is arid with average annual precipitation < 100 mm Project altitude 3,716 msnm Soft and hard saline crusts a

  14. Slide 14: Hydrogeology

    Hydrogeology Lithium (Li), potash (K), boron (B), sodium (Na) and magnesium (Mg), among others, are leached and transported from rocks in the catchment, and then accumulated and concentrated by evaporation in the Salars Geology and hydrogeology extensively studied and investigated by SQM, Codelco an

  15. Slide 15: Exploration Program

    Exploration Program 15

  16. Slide 16: TEM and MT Geophysics

    TEM and MT Geophysics Completed extensive property-wide Transient Electromagnetic (TEM) geophysical surveys (December 2022) TEM contiguously spaced stations along 28 profiles for a total of 47.8 line-km Highly conductive zones across concessions up to 400m at less than 1.0 Ohm-m beneath the surface

  17. Slide 17: Salar de Ascotan sediment brine up to 1,300 mg/L lithium

    Salar de Ascotan sediment brine up to 1,300 mg/L lithium Highs of >1,000 Li mg/l sedimentary brine samples validate Salar de Ascotan as a strong exploration target for a potential future resource Salar de Ascotan mineralization is expected to exhibit typical hydrogeological conditions of the salars

  18. Slide 18: Sedimentary Brine Sampling Program

    Sedimentary Brine Sampling Program ❑ 20 sedimentary brine samples collected via augur drilling 1-1.5 m depth ❑Assays of the complete sample set range from to 93.5 to 1,299.5 Li (mg/l), with the average of 417.4 Li (mg/l) ❑3 brine samples above 1,000 Li (mg/L) – a concentration one of the highest in

  19. Slide 19: Near Surface Sediment Geochemistry

    Near Surface Sediment Geochemistry A semi-systematic near surface sediment sampling program was completed over identified geophysical and drill targets at the Ascotan Project (April 2025) 50 samples were taken using portable auger drill at a depth between 0.5-1.5 meters with an average depth of 0.8

  20. Slide 20: Environmental Approval and Cooperation Agreement with The Cebollar-Ascotan Indigenous Community

    Environmental Approval and Cooperation Agreement with The Cebollar-Ascotan Indigenous Community ❑Favorable official response from the Environmental Evaluation Service of Chile “Servicio de Evaluación Ambiental (SEA)” to the OCA Salar de Ascotan Project “Consulta de Pertinencia de Ingreso al SEIA del

  21. Slide 21: Salar de Ascotan Progress exploration program

    Salar de Ascotan Progress exploration program Property-wide TEM Surface brine Magneto-Telluric (MT) geophysical surveys 47 Drill target definition – geochemical sampling geophysics - completed line-km – completed completed Q2/23 program – completed Q1/23 Q4/22 Q3/23 Sediment geochemical Sedimentary

  22. Slide 22: Lidstone Gold Project Northwestern Ontario

    Lidstone Gold Project Northwestern Ontario New Gold Discovery in Established Geological Province 22

  23. Slide 23: Lidstone Gold Project

    Lidstone Gold project Located ~240km northwest of Geraldton, ON Within the Uchi Domain of the Superior geological province Network of logging roads allows the property access from the west via a truck and from the east via a truck and on foot (approx. 1.5km) 9,600 ha of mining claims, 100% owned, no

  24. Slide 24: Prospect Geology

    Prospect Geology Lidstone is located within the greenstone and plutonic complexes of the Uchi Domain on the boarder with metasedimetary English River subprovince Lithologies consist of metasedimentary units, migmatized supracrustal rocks, mafic to intermediate greenstone belt of basaltic/andesitic f

  25. Slide 25: Geophysics

    Ontario High Resolution Aeromagnetic Residual Magnetic Intensity Geophysics The prospect area consist of coincident magnetic abrupt highs and lows and zones of high electromagnetic (EM) conductance Multiple areas of interest suggests historical work overlooked a significant exploration opportunity i

  26. Slide 26: Gold Discovery

    Gold Discovery In the 2024 field exploration on the project showed potential for gold mineralization with a sample from a quartz vein returning 0.272 g/t Au The surrounding geology was further investigated for potential economic gold mineralization in the fall of 2025 The 2025 sampling campaign was

  27. Slide 27: Lidstone Exploration Program

    Lidstone Exploration Program Exploration 2026/27 ❑ Geologic mapping ❑ Geochemical survey ❑ Geophysical survey ❑ Magnetic survey ❑Drill target definition Sample F570631 which returned 2.34 g/t Au from outcrop 27

  28. Slide 28: Contact us

    Contact us Rob Saltsman, CEO and President First Lithium Minerals Corp. 40 King Street West, Suite 2400 Toronto, Ontario M5H 3Y2 Canada www.firstlithium.ca Tel: +1 416 402 2428 Email: rob@firstlithium.ca 28