Emerald Resources Nl · ASX:EMR
Emerald Resources Nl — Shareholder Meeting (November 2018)
15 slides from Emerald Resources Nl's shareholder meeting presentation, Nov 26, 2018
Slide 1: Okvau Gold Project, Cambodia
Okvau Gold Project, Cambodia ASX:EMR Emerald to Become +100,000ozpa Gold Producer Annual General Meeting | 26 November 2018
Slide 2: Presentation Disclaimer
Presentation Disclaimer Forward Looking Statement This announcement contains certain forward-looking statements. These forward-looking statements are not historical facts but rather are based on the Company’s current expectations, estimates and projections about the industry in which Emerald Resourc
Slide 3: 2018 A Year In Review | Milestones Achieved
2018 A Year In Review | Milestones Achieved 13th July 2017 o Emerald announced significant expansion of its ground holdings in Cambodia comprising of a combination of 100% owned granted licences, applications and earn-in & joint venture agreements covering a combined area of 1,442km2 13th Novemb
Slide 4: Capital Structure | Board & Management
Capital Structure Board & Management Simon Lee AO, Non-Executive Chairman Previously Chairman: Equigold NL, Samantha Gold NL, and Great ASX Code EMR Victoria Gold NL Previously Board Member of the Australian Trade Commission and Share Price 3.0 cents1 Patron of the Western Australian Chinese Cha
Slide 5: Cambodia Overview & Project Location
Cambodia Overview & Project Location First mover advantage in frontier terrain Attractive fiscal regime: o 100% ownership; o No Government equity participation; o 30% corporate tax rate for mining; o 3.0% Government Gold royalty (net)3; o Import duty exemptions. 1,442 km² of underexplored terrain
Slide 6: Okvau Project Summary | Robust and Compelling Economics
Okvau Project Summary | Robust and Compelling Economics Economically robust project Project DFS Economics (100% Ownership) JORC Ore Reserve of 14.3Mt @ 2.0g/t Au for 907,000oz; Development Capital Costs1 US$91M 2.0Mtpa plant to produce 106,000oz pa; Mining Contractor Capital & Pre-Production Min
Slide 7: Low All-in Sustaining Costs | High Margin
Low All-in Sustaining Costs | High Margin Operating Cost Summary Life of Mine On-Site Mining US$333/oz On-Site Processing US$265/oz On-Site G&A US$48/oz Transport and Refining US$5/oz C1 costs US$650/oz Royalties1 US$50/oz Sustaining Capital & Closure Costs US$31/oz AISC US$731/oz 1 Includes Governm
Slide 8: Okvau JORC Reserve
Okvau JORC Reserve 2.0g/t Au for 907,000 ounces gold April 2017 JORC Resource (0.7g/t gold cut-off) 1 Tonnage Grade Au Gold Resource Classification (Mt) (g/t) (Koz) 650 metres of strike by 600 metres width of the Indicated 15.11 2.08 1,008 mineralised vein system Inferred 2.57 1.61 133 Drill spa
Slide 9: Okvau Grade Control Simulation
Okvau Grade Control Simulation Infill Grade Control simulation drilling program completed consisting of 368 holes for 10,100m; Holes drilled (infill to resource drilling) on a 10m x 10m infill pattern to an average vertical depth of 25m; Results received to date confirm continuity, grade and t
Slide 10: Okvau Resource Growth
Okvau Resource Growth Depth extensions Some of the highest grade intersections sit beneath open pit floor including: o 17m @ 4.5g/t from 320m (DD11OKV091); o 10m @ 9.6g/t from 411m (DD12OKV108); o 11m @ 8.4g/t from 399m (DD11OKV091); o 6m @ 9.7g/t from 520m (DD16OKV373). Refer to the Company’s ASX
Slide 11: Regional Potential | New Joint Ventures
Regional Potential | New Joint Ventures Dominant land position of 1,442km2 covering a north-west trending zone of granitoid intrusions; Multiple Gold occurrences with direct associations with intrusions with pathfinder multi-elements (bismuth, arsenic, tellurium); Small percentage of total lic
Slide 12: Angkor JV Koan Nheak Project
Angkor JV Koan Nheak Project • Two gold in soil anomalies discoveries; Peacock North • Northern anomaly 0.7km x 0.3km (at >10ppb Au); • Southern anomaly 1.4km x 0.4km (at >10ppb Au); • Peak value EMR rock chip 9.94 g/t Au; • Geological setting similar to Okvau on the southern extremity of a Diorite
Slide 13: Mekong Minerals Snoul Project
Mekong Minerals Snoul Project Drillhole From Interval Au g/t SNRC002 4 4 11.94 SNRC006 12 4 1.25 • EMR Auger soil results redefines existing SNRC009 4 16 2.93 MM shallow soil results; SNRC010 12 12 1.01 DD09ANC011 49 1 9.09 • 3km, x 1.5km gold in soil anomaly (at DD09ANC013 66 1 11.36 >10ppb Au); DD
Slide 14: Mekong Minerals Phnom Khtong Project
Mekong Minerals Phnom Khtong Project • EMR Auger soil results redefines existing MM shallow soil results • Western anomaly 1.3km x 0.4km (at >30ppb Au) and Central anomaly 1km x 0.4km (at >10ppb Au) • Peak value EMR auger sampling 7.27 ppm Au, Peak value EMR rock chip 38.3 g/t Au • Geological settin
Slide 15: 2019 A Year In Preview | Milestones to be Achieved
2019 A Year In Preview| Milestones to be Achieved 1. Commencement of Project Development o Currently commencing early works including access road, procurement of long lead items and resettlement & relocation 2. Completion of Financing of the Okvau Project o Advanced 3. Completion of Mineral Investme
Emerald Resources NL — Shareholder Meeting (November 2018) on 6ix