Petrofac Limited · OTC:POFCY
Petrofac — FY2016 Earnings Presentation
37 slides from Petrofac's earnings presentation, Feb 22, 2017

Slide 1: Final Results 2016
FINAL RESULTS 2016 22 February 2017 1

Slide 2: Important notice
Important notice • This document has been prepared by Petrofac • Certain statements in this presentation are Limited (the Company) solely for use at forward looking statements. Words such as presentations held in connection with its Final "expect", "believe", "plan", "will", "could", Results 2017 on

Slide 3: Focusing on our core strengths and delivery
Focusing on our core strengths and delivery • Good operational & financial performance – Underlying net profit of US$421m – Reduced net debt by 10% • Delivering our strategy – Focusing on core strengths – Reducing capital intensity – Strengthening balance sheet • Maintained final dividend • Well pos

Slide 4: 2016 Final Results
2016 FINAL RESULTS Alastair Cochran Chief Financial Officer ee ee et = te SES, aa ae ra pe ~. (p' 3 — ls ee a = tS ve ee tS ee ao <a gt i So ae z sg 4 s ee, ge r Wai Set) 3 ee ea Suet s As rs —_ ee pas oe ; Lee a - Fs a Z Petrofac rp)

Slide 5: 2016 Financial Summary
2016 Financial Summary Order Backlog Net Profit1 Cash Conversion Net Debt Total Dividend US$14.3bn US$421m 114% US$617m 65.8 cents (31%) (4%) (151)ppts (10%) unchanged • Delivered positive results in challenging markets – Record revenues – Significant cost reduction • Strong cash generation, with ne

Slide 6: Underlying Business Performance
Underlying Business Performance EBITDA1 (US$m) Net Profit1 (US$m) 706 463 433 626 166 99 7 (42) 2015 2016 2015 2016 2015 2016 2015 2016 E&C EPS IES E&C EPS IES Corporate 1 Underlying Business Performance before exceptional items, certain re-measurements and Laggan-Tormore project losses 6

Slide 7: Business Performance Results
Business Performance Results1 US$m 2016 2015 Change Revenue 7,873 6,844 +15% EBITDA 704 312 Net finance costs (98) (92) +7% Tax (85) (6) Net profit 320 9 Earnings per share2 93.29c 2.65c Dividend per share 65.8c 65.8c unchanged Pre Laggan-Tormore losses: EBITDA 805 792 +2% Net profit 421 440 (4%) Ne

Slide 8: Impairments and Exceptional Items
Impairments and Exceptional Items • Reported net profit impacted by Impairments and Exceptional Items impairments & exceptional items US$m Pre-tax impairment Tax Post-tax impairment Seven Energy 1971 - 197 • Impairments of US$245m Berantai RSC 33 (3) 30 – Fully impaired Seven Energy Other IES 18 - 1

Slide 9: Movements In Working Capital
Movements In Working Capital US$m 2016 2015 Cash Flow WIP & inventories 2,193 1,807 (386) Trade & other receivables 2,162 2,124 (112) Advances (703) (1,102) (399) Trade & other payables (1,271) (1,408) (42) Accrued contract expenses (2,060) (1,233) +800 Billings > cost & estimated earnings (44) (201

Slide 10: Reducing Capital Intensity
Reducing Capital Intensity • Capex down 18% to US$303m Cash Capex (US$m)2 • Reducing capital intensity 801 – Exited Berantai and Ticleni – Transitioning back to a capital light business • ROCE1 up 14 ppts to 17% 370 303 2014 2015 2016 1 EBITA divided by average capital employed (total equity and non

Slide 11: Cash Flow and Net Debt
Cash Flow and Net Debt US$m 2016 Cash Conversion2 265% Opening net debt (686) EBITDA1 704 Movement in working capital 85 114% 84% Tax & interest (134) Capex (303) Other 34 2014 2015 2016 Free cash flow 386 Dividend (224) Financing / other (93) Gross debt (1,784) Cash inflow 69 Gross cash 1,167 Closi

Slide 12: Strengthening the Balance Sheet
Strengthening the Balance Sheet • Committed to maintaining a strong Key ratios 2016 2015 balance sheet Net Debt / EBITDA1 1.1x 3.4x – Conservative financial policy Gross Debt / EBITDA 2.5x 5.7x – Substantial covenant headroom • US$1.4bn of liquidity • Prudent debt maturity profile • Deleveraging – R

Slide 13: Operational Update
OPERATIONAL UPDATE Marwan Chedid Group Chief Operating Officer on 10,91) a’. SM —_ @) |e eee) \ Petrofac ’P)

Slide 14: Operational Headlines
Operational Headlines Good • Good operational performance across all businesses operational performance • Successful start-up of production on GSA Focused on • High levels of activity in E&C core strengths • Continued growth in EPS Delivering • Relentless focus on costs: delivered targeted savings o

Slide 15: Engineering & Construction
Engineering & Construction • Revenue up 23% • Underlying net profit down 4%1 • Underlying net margin of 7.0%1 – Project phasing / mix, commercial settlements & cost efficiencies Revenue (US$m) EBITDA (US$m)1 Net Profit (US$m)1 5641 5401 438 4301 5,928 476 4121 4,821 12.2% 13.3% 3,587 11.2% 8.9% 9.5%

Slide 16: Engineering & Production Services
Engineering & Production Services • Revenue down 1% • Net profit up 91% • Net margin of 6.4% – Business mix, EPCm project phasing, cost deflation & reductions in overheads Revenue (US$m) EBITDA (US$m)1 Net Profit (US$m)1 111 2,180 140 1,739 1,725 115 8.1% 88 6.4% 55 58 5.3% 5.1% 3.3% 2.5% 2014 2015

Slide 17: Integrated Energy Services
Integrated Energy Services • Revenue down 28% – Lower production, lower investment in Mexico and lower realised prices • Net loss of US$42m – Change in depreciation policy mitigated by reductions in opex and taxation Revenue (US$m) EBITDA (US$m)1 Net Profit (US$m)1 328 591 55.5% 138 43.8% 23.4% 379

Slide 18: Delivered our cost savings target
Delivered our cost savings target • Delivered c.US$120m of savings, ahead of target • Right-sized business through 29% headcount reduction 2016 Cost Savings1 (US$m) E&C Project Support Cost2 25% 28 20% 15% 65 27 10% 5% 0% E&C EPS IES 2013 2014 2015 2016 1 Estimated annualised savings 18 2 Project su

Slide 19: Relentless focus on operational excellence
Relentless focus on operational excellence • Initiatives focused on 3 areas: ONGOING OPERATIONAL EXCELLENCE INITIATIVES Optimisation of resources Project Leveraging technology Support Outsourcing low-end, non-differentiating work Reduction in bulk quantities and procurement cost Materials / Logistic

Slide 20: 2016 order intake lower than expected
2016 order intake lower than expected • Order intake of US$1.9bn – US$1.3bn in Engineering & Production Services – US$0.6bn in Engineering & Construction 2016 E&C bidding pipeline (US$bn) Actual 2016 E&C Awards (US$bn) 12 0.6 1.4 6 4.2 11 Awarded L1 (not awarded) Lost Cancelled (to be rebid) Delayed

Slide 21: Outlook
OUTLOOK Ayman Asfari Chief Executive Officer _ >.

Slide 22: Delivering our strategy
Delivering our strategy Progress in 2016 Near-term priorities Focusing on our core strengths and delivery • Streamlined organisational structure • Develop incremental organic growth initiatives in E&C and EPS • Delivered significant cost reductions • Finalise deep-water strategy • Protected and exte

Slide 23: Good bidding pipeline
Good bidding pipeline • Bidding activity has increased • Good pipeline of bidding opportunities E&C Bidding Pipeline (US$bn) 30 25 20 15 10 5 0 2017 2018 Tendered Tendering Prospects 23

Slide 24: Focused on our core markets
Focused on our core markets • Active bids (i.e. tendered or tendering) in core markets • Active bids focused on downstream projects and upstream gas Active Bids By Type Upstream gas Upstream oil Downstream Other 24

Slide 25: Excellent revenue visibility for 2017
Excellent revenue visibility for 2017 Backlog Ageing (US$bn) Backlog by Geography 1.7 11% 20% 1.4 14% 13% 1.0 5.9 4.8 18% 2.9 1.1 24% 0.5 2016A 2017 2018 2019+ Oman UAE Kuwait Saudi Arabia E&C EPS UK Other 25

Slide 26: Summary
Summary • Delivered positive results in challenging markets • Delivering our strategy • Strengthening our balance sheet • Well positioned for recovery 26

Slide 27: Appendices
APPENDICES

Slide 28: Appendix 1: Key E&C/EPS projects
NOC/NOC led company/consortium Appendix 1: Key E&C/EPS projects Joint NOC/IOC company/consortium IOC/IOC led company/consortium Original contract value to Petrofac Laggan-Tormore gas plant, UKCS >US$800m Badra field, Iraq US$330m Bab compression, Abu Dhabi US$500m In Salah southern fields developmen

Slide 29: Appendix 2: Key IES projects
Appendix 2: Key IES projects Production Enhancement Contracts (PEC) END DATE Magallanes and Santuario, Mexico 2037 Pánuco, Mexico* 2043 Arenque, Mexico 2043 Risk Service Contracts (RSC) Berantai development, Malaysia** 2020 Equity Upstream Investments Block PM304, Malaysia 2026 Chergui gas concessio

Slide 30: Appendix 3: IES net book value
Appendix 3: IES net book value Intangible oil and gas assets (Block PM304, Oil and gas assets and other pre- (Block PM304, Chergui development Greater Stella Area and PECs; note 10) costs; note 14) development (note 17) Total US$m US$m US$m US$m Cost At 1 January 2016 1,426 86 160 1,672 Additions 15

Slide 31: Appendix 4: Effective tax rate
Appendix 4: Effective tax rate Effective tax rate (ETR) by segment1 2016 2015 Engineering & Construction 23% 67% Engineering & Production Services 17% 15% Integrated Energy Services 42% 800% Group 20% 30% 1 Before exceptional items and certain re-measurements • The effective tax rates are principall

Slide 32: Appendix 5: Employee numbers
Appendix 5: Employee numbers Aberdeen Woking London Mumbai Chennai Kuala Lumpur Sharjah Abu Dhabi Key operating centres Other operating locations Corporate services • Approximately 13,600 people in 800 7 key operating centres and 24 100 offices E&C EPS 5,200 • 37% of our employees are 7,500 IES shar

Slide 33: Appendix 6: Segmental performance
Appendix 6: Segmental performance 2016 revenue by reporting segment 2016 revenue by geography 3% 8% Oman 19% UAE 10% 22% E&C Algeria 4% United Kingdom EPS Kuwait 17% Malaysia IES Saudi Arabia 75% 28% Other 6% 8% • Engineering & Construction earned 75% of Group revenues in 2016 • Middle East and Nort

Slide 34: Appendix 7: Group reorganisation
Appendix 7: Group reorganisation segments reporting 2016 Engineering & Engineering & Production Services Integrated Energy Construction (E&C) (EPS) Services (IES) service lines Onshore Offshore Offshore Engineering & 2015 Engineering & Capital Projects & Consulting Training Production Developments C

Slide 35: Appendix 8: Working capital summary
Appendix 8: Working capital summary Balance Sheet W/cap change analysis US$m 2016 2015 Change FX Disposals Transfers Other Per Cash Flow Inventories 11 13 2 2 WIP 2,182 1,794 (388) (388) Contract receivables 1,377 1,224 (153) 32 (3) (78) (202) Retentions 305 349 44 44 Advances to suppliers 293 262 (

Slide 36: Appendix 9: Working capital summary
Appendix 9: Working capital summary 1 Inventories, work in progress and trade and other receivables, less trade and other payables, accrued contract expenses and billings in excess of costs and estimated earnings. 36

Slide 37: For further details, please contact
For further details, please contact Jonathan Low Head of Investor Relations jonathan.low@petrofac.com +44 20 7811 4930 Jonathan Edwards Investor Relations Manager jonathan.edwards@petrofac.com +44 20 7811 4936 37
Source: company website
More decks from Petrofac Limited
Investor Presentation (2025)22 slides · Aug 15, 2025
H1 2024 Earnings Presentation25 slides · Sep 30, 2024
FY2023 Earnings Presentation29 slides · May 31, 2024
H1 2023 Earnings Presentation27 slides · Aug 10, 2023
FY2022 Earnings Presentation33 slides · Apr 27, 2023
Investor Presentation (2023)20 slides · 2023