  1. Slide 1: What's Involved in Drilling a Gas Well?

    What’s Involved in Drilling a Gas Well?

  2. Slide 2: About the Bureau

    About the Bureau Mochthe ~———F wren peowna cst # ~ ac wi

  3. Slide 3: About the Bureau

    About the Bureau Northwest Region Southwest Region 230 Chestnut St. 400 Waterfront Dr. Meadville, PA 16335 Pittsburgh, PA 15222 814 – 332 – 6860 412 – 442 – 4024 Central Office Bureau of Oil and Gas Management PO Box 8765 Harrisburg, PA 17105 717 – 772 - 2199

  4. Slide 4: Program Authority

    Program Authority • Oil and Gas Act • 25 Pa Code Chapter 78 – Oil and Gas Wells • Oil and Gas Conservation Law • 25 Pa Code Chapter 79 – Oil and Gas Conservation • Coal and Gas Coordination Act

  5. Slide 5: Program Authority

    Program Authority Dam Safety and Encroachment Act • 25 Pa Code 105 – Dams and Waterways Management • 25 Pa Code 106 – Flood Management Solid Waste Management Act

  6. Slide 6: Program Authority

    Program Authority Clean Streams Law • 25 Pa Code 102 – Erosion and Sediment Control • 25 Pa Code 91 – General Provisions • 25 Pa Code 92 – NPDES Permitting, Monitoring and Compliance • 25 Pa Code 93 – Water Quality Standards • 25 Pa Code 95 – Waste Water Treatment Requirements • 25 Pa Code 96 – Wate

  7. Slide 7: Pennsylvania Oil & Gas Patch?

    Pennsylvania Oil & Gas Patch? Titusville Pennsylvania currently produces 3.76 million barrels of oil and 163 BCF of natural gas (2004)

  8. Slide 8: In 2007, 7,241 permits were issued.

    In 2007, 7,241 permits were issued. .

  9. Slide 9: Oil & Gas Well Permits Issued, 1990 - 2007

    Oil & Gas Well Permits Issued, 1990 - 2007 8000 7500 7000 6500 6000 5500 5000 4500 4000 3500 3000 2500 2000 1500 1000 500 0 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 DOW DOWDD DOWR

  10. Slide 10: Wells Permitted 2007/2006

    Wells Permitted 2007/2006 7,241 /7,302 60/36 14/1 457/637 1151/945 2/7 11/8 356/348 109/120 332/379 17/3 202/129 200/105 0/16 151/271 40/14 335/377 283/322 0/3 301/369 100/36 587/662 60/66 3/0 514/596 64/99 57/54 2/0 447/219 628/639 0/2 1/2 0/1 418/298 349/528 Map Courtesy of Digital-Topo-Maps.com

  11. Slide 11: Wells Permitted 2008 January - May

    Wells Permitted 2008 January - May 21 212 501 34 15 74 12 171 2 72 47 119 118 43 26 168 207 16 91 33 235 254 22 51 211 285 4 127 207 Map Courtesy of Digital-Topo-Maps.com

  12. Slide 12: Permits, Etc.

    Permits, Etc. To drill a gas well in Pennsylvania the operator needs… • a drilling permit • an E & S plan

  13. Slide 13: Additional permits and/or approvals may be needed

    Additional permits and/or approvals may be needed • PennDOT highway occupancy permit • SRBC or DRBC Permit • Chapter 105 encroachment permit • Stormwater Management permit for projects affecting more than 5 acres

  14. Slide 14: Drilling Permit Applications include

    Drilling Permit Applications include • Application Fee • Bond • Any waiver or variance requests • PNDI check • Well plat • Political subdivision and county • Location of the well • Name of the surface owner and lessor • Name of all surface owners or water purveyors whose water supplies are within 10

  15. Slide 15: Plat notification requirements

    The operator shall forward by certified mail a copy of the plat to: • the surface owner • all surface owners with water supplies and water purveyors within 1000 ft • all coal owners and lessee of any underlying workable coal seams • all coal operators identified on the well plat. • Gas Storage opera

  16. Slide 16: Locating A Well Site

    Locating A Well Site • Geology – drill where the gas is

  17. Slide 17: Survey the Site

    oO 3= Dn oO s > >) > ian =) Dn

  18. Slide 18: Distance Restrictions

    Distance Restrictions: • 100 ft. - stream, spring or body of water identified on the most current 7 ½ minute USGS topographic map. • 100 ft. must be maintained to any wetland greater than one acre in size. • 200 ft from an existing building or water well without written consent of the owner. • The d

  19. Slide 19: History

    History Let’s Make a Plan, Stan. Sept 29, 1972 – 25 PA Code Chapter 102 adopted. Oil & Gas Operators were required to prepare Erosion and Sediment Control plans. 1981 – Department’s First Erosion and Sediment Control Manual for oil & gas well operations (Now incorporated in the Oil and Gas Operators

  20. Slide 20: Erosion and Sediment Control Plan

    Erosion and Sediment Control Plan

  21. Slide 21: Erosion & Sediment Controls (BMPs)

    Erosion & Sediment Controls (BMPs)_

  22. Slide 22: Slide 22

  23. Slide 23: Stream Crossings

    Stream Crossings

  24. Slide 24: Minimize the Disturbance

    Minimize the Disturbance

  25. Slide 25: Build the Site, Stabilize as you go, Drill the well

    Build the Site Stabilize as you go Drill the well

  26. Slide 26: Drilling the Well

    Drilling the Well

  27. Slide 27: Conductor

    Conductor Fresh Ground Water Gas/Oil Formations

  28. Slide 28: Conductor Well Bore

    Conductor Well Fresh Bore Ground Water Gas/Oil Formations

  29. Slide 29: Fresh Water Casing

    Fresh Ground Water Fresh Water Casing Gas/Oil Formations

  30. Slide 30: Cement

    Cement Fresh Ground Water Gas/Oil Formations

  31. Slide 31: Cement Returns from the annular space

    Cement Returns from the annular space

  32. Slide 32: Borehole to Formations

    Fresh Ground Water Borehole to Formations Gas/Oil Formations

  33. Slide 33: Baffle

    Fresh Ground Water Gas/Oil Formations Baffle

  34. Slide 34: Fresh Ground Water

    Fresh Ground Water Gas/Oil Formations

  35. Slide 35: Fracing the Well

    Fracing the Well

  36. Slide 36: What is Fracing?

    What is Fracing? Hydraulic fracturing is the process in which fluid is pumped down a well and into a formation under pressure high enough to cause the formation to crack, or fracture, forming passages through which gas can flow into the well bore. Upon completion of the frac this fluid is pumped fro

  37. Slide 37: Fresh Ground Water

    Fresh Ground Water Gas/Oil Formations

  38. Slide 38: Fresh Ground Water

    Fresh Ground Water Gas/Oil Formations

  39. Slide 39: Fresh Ground Water

    Fresh Ground Water Gas/Oil Formations

  40. Slide 40: Pipeline Stream Crossings

    8’ below the streambed Pipeline Stream Crossings 220’ bore length

  41. Slide 41: The End Result

    ee Cate voc) Sina a) ope A ~~" _) pyar re gc} Ce LU" cb) Ce

  42. Slide 42: Stormwater Management

    Stormwater Management Bioretention / Infiltration Area

  43. Slide 43: You might see this...

    You might see this...

  44. Slide 44: Common Questions

    Common Questions

  45. Slide 45: Protection of Water Supplies

    Protection of Water Supplies

  46. Slide 46: Presumption of responsibility

    “presumption of responsibility” An operator is responsible for any degradation of a water supply within 1000 ft of the gas well that occurs within six months of the completion of drilling, unless the operator can prove otherwise. Whenever a gas/oil well related water loss or degradation occurs it sh

  47. Slide 47: What happens to the fluids used during drilling and production?

    What happens to the fluids used during drilling and production? All fluids encountered during the drilling and fracing of a gas well are collected in lined sumps.

  48. Slide 48: Top Hole Water.

    Top Hole Water.

  49. Slide 49: Fluid hauled to a permitted treatment facility

    All other drilling, fracing and production fluid is hauled to a permitted treatment facility

  50. Slide 50: NPDES permit and discharge limits

    • NPDES permit • Specific discharge limits. • Satisfies state as well as USEPA requirements.

  51. Slide 51: Be Smart Out There

    Be Smart Out There

  52. Slide 52: If you see something unusual... Let Someone Know!

    If you see something unusual… Let Someone Know!

  53. Slide 53: Well mam, first, I ask'n politely to put in the BMPs

    “Well mam, first, I ask’n politely to put in the BMPs, and if that don’t work…well, that’s what this here shootin’ iron’s fer.” Great,Great Great Grand Pappy Umholtz

  54. Slide 54: Joe Umholtz, Chief, Division of Surface Activities

    Joe Umholtz Chief Division of Surface Activities Bureau of Oil & Gas Management 717-772-2199