  1. Slide 1: European copper producer with operations in Spain

    European copper producer with operations in Spain 2022 Annual Results 22 March 2023

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this document (“Presentation”) has been prepared by Atalaya Mining Plc (the “Company”). While the information contained herein has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers

  3. Slide 3: Disclaimer – Technical Disclosure

    Disclaimer – Technical Disclosure Technical Disclosure – Proyecto Riotinto Unless otherwise noted, all scientific and technical information relating to Proyecto Riotinto is based on and derived from a technical report entitled “Technical Report On the Riotinto Copper Project” dated September 2022, p

  4. Slide 4: 2022 Annual Results

    ATALAYA MINING > 2022 Annual Results

  5. Slide 5: Review of 2022

    Review of 2022 Good operational performance but external challenges impacted financials ‒ Copper production of 52,269 tonnes, partially impacted by the logistics strike in Q1 2022 ‒ AISC of $3.37/lb, due to extremely high electricity prices, input cost inflation and soft Q1 production Operating ‒ AI

  6. Slide 6: Q4 2022 Production Results

    Q4 2022 Production Results Strong final quarter of production provides momentum into 2023 Copper production Ore Throughput (Mt) 13,969 tonnes Cu 13,872 tonnes Cu | Q4 2021 Throughput & recoveries 4.0 Mt ore processed 0.41% Cu ore grade 3.8 Mt | Q4 2021 0.41% | Q4 2021 Copper Recovery 86.24% Cu recov

  7. Slide 7: Q4 2022 Financial Results

    Q4 2022 Financial Results Improved quarterly performance provides the basis for a stronger 2023 Income statement highlights Revenues (€m) Revenue: €99.9m Op. costs: €(81.7)m €101.5m | Q4 2021 €(50.5)m | Q4 2021 EBITDA: €18.2m Profits: €8.0m €50.9m | Q4 2021 €28.0m | Q4 2021 Cash flow statement highl

  8. Slide 8: FY2022 Financial Results

    FY2022 Financial Results Balance sheet strength maintained despite high opex and capex investments Income statement highlights Revenue: €361.8m Op. costs: €(306.5)m €405.7m | FY2021 €(206.6)m | FY2021 EBITDA: €55.3m Profits: €30.9m €199.1m | FY2021 €132.2m | FY2021 Cash flow statement highlights Ope

  9. Slide 9: Input Cost Inflation

    Input Cost Inflation Prices of key consumables remain high compared to historical levels Indexed Prices (Dec-2020 = 100) Explosives Diesel Tyres Electricity Steel Balls Lime = direct link to gas prices 9

  10. Slide 10: Cash Costs & AISC Breakdown

    Cash Costs & AISC Breakdown Significant impact of high electricity prices, but some moderation in Q4 2022 $/lb Copper Payable Q4 2022 Q4 2021 FY2022 FY2021 ▪ FY2022 costs were heavily impacted Mining 0.70 0.67 0.79 0.64 by inputs linked to Processing 1.11 0.56 1.31 0.61 energy: Other site operating

  11. Slide 11: Electricity Market Update

    ATALAYA MINING > Electricity Market Update

  12. Slide 12: Electricity Prices in Spain

    Electricity Prices in Spain 2022 electricity prices were unprecedented, although 2023 has improved so far Monthly Arithmetic Average Electricity Price (€/MWh) (1)(2)(3) ▪ In 2022, spot market electricity prices in High Spain were well above historical prices Average and long-term futures contracts (

  13. Slide 13: Natural Gas Prices in Europe

    Natural Gas Prices in Europe Gas prices have fallen significantly from peaks in late August / early September Natural Gas Prices – 1 Month Ahead (€/MWh)(1) ▪ European gas prices have been elevated vs. historical levels since late 2021, which was the lead-up to the invasion of the Ukraine ‒ Prices sp

  14. Slide 14: Electricity Price Impact on Unit Costs

    Electricity Price Impact on Unit Costs Impact of PPA, solar plant and market price normalisation to reduce AISC AISC Breakdown ($/lb Copper Payable) ▪ Electricity prices are responsible for the vast majority of the AISC increase in 2022 compared to prior years ‒ Other costs have been impacted by inf

  15. Slide 15: 2023 Guidance

    ATALAYA MINING > 2023 Guidance

  16. Slide 16: 2023 Guidance

    2023 Guidance Steady operational performance and improved cost outlook expected for 2023 Operational Guidance ▪ Production Ore mined Mt 17.1 ‒ Performance consistent with recent quarters is expected for 2023 Waste mined Mt 24.1 ▪ Costs Ore processed Mt 15.3 – 15.8 ‒ Moderation in market electricity

  17. Slide 17: 50 MW Solar Plant

    50 MW Solar Plant Expected to provide stable, low cost and carbon-free energy beginning in 2023 50 MW of combined capacity 17

  18. Slide 18: E-LIX Phase I Plant

    E-LIX Phase I Plant Construction progressing; expected to unlock significant value 18

  19. Slide 19: Exploration Programme

    Exploration Programme €10 million budget will focus on Masa Valverde, Riotinto East and Ossa Morena 19

  20. Slide 20: Growth Strategy

    ATALAYA MINING > Growth Strategy

  21. Slide 21: Strategic Asset Portfolio

    Strategic Asset Portfolio Total land package covers >1,200 km2 in three prolific mining districts in Spain Alconchel Proyecto Ossa Morena Proyecto Touro Riotinto Riotinto East Riotinto Atalaya permits District Proyecto Masa Valverde Processing facilities Active mine Main deposits Mineral occurrence

  22. Slide 22: Regional Infrastructure

    Regional Infrastructure Access to the critical inputs required for modern and sustainable operations Villages Fresh water reservoirs Current TSF Transmission line Planned future TSF NOT REQUIRED: Fresh water • Labour camps reservoir • Fly-in fly-out • Desalination Villages • Pipelines • Own smelter

  23. Slide 23: Potential Future Processing Hub

    Potential Future Processing Hub ATYM’s 15 Mtpa mill could become a processing hub – similar to MATSA model Key Operations in the Iberian Pyrite Belt Aguas Teñidas Magdalena Cerro Colorado MATSA San Dionisio San Antonio (Sandfire) Riotinto East Sotiel Riotinto Masa Valverde / District Majadales Atala

  24. Slide 24: New Riotinto PEA

    New Riotinto PEA Highlights of independent study

  25. Slide 25: New Riotinto PEA

    New Riotinto PEA Contemplates an integrated mine plan that leverages Riotinto’s 15 Mtpa plant San Antonio Underground: 11.8 Mt Riotinto Processing Plant (Inferred) 1.32% Cu, 1.79% Zn Capacity: 15 Mtpa Cerro Colorado Open pit: 200.7 Mt (M&I) 0.37% Cu San Dionisio Open pit: 56.1 Mt (M&I) 0.91% Cu, 1.1

  26. Slide 26: New Riotinto PEA: Mining & Processing

    New Riotinto PEA: Mining & Processing Mine plan prioritises higher grade material from San Dionisio and San Antonio Mining Schedule by Mineralised Material Source (Mt) Processing Schedule by Mineralised Material Type and Grade 26

  27. Slide 27: New Riotinto PEA: Production & NPV

    New Riotinto PEA: Production & NPV Demonstrates the potential for strong economics and production growth Production Profile(1)(2) NPV After-Tax ($m) Sensitivity to Copper Price ($/lb) and Discount Rate (3) Copper Price ($/lb) 2.80 2.98 3.15 3.33 3.50 3.68 3.85 4.03 4.20 0% 928 1,240 1,545 1,848 2,15

  28. Slide 28: Capital Cost Summary

    Capital Cost Summary Much of phased capex linked to polymetallic material and underground mines Unit 2023-2026 2027-2036 LOM By Mineralised Material Type Related to CuSW Material $m 44 - 44 Related to PolyMS Material $m 98 154 252 Related to Overall Operations $m 20 142 196 Subtotal $m 162 297 492 C

  29. Slide 29: Operating Cost Summary

    Operating Cost Summary Potential reduction in cash costs due to higher grades and by-product credits Unit 2023-2026 2027-2036 LOM Site Operating Costs Mining $m 435 1,371 1,875 Processing $m 492 1,275 1,962 G&A $m 71 177 275 Subtotal $m 998 2,822 4,112 Contingency of 5% $m 50 141 206 Total $m 1,048

  30. Slide 30: Economic Summary: Base Case

    Economic Summary: Base Case $3.50/lb Cu, $1.20/lb Zn, $0.95/lb Pb Unit 2023-2026 2027-2036 LOM Gross Revenues $m 1,735 6,549 8,855 Offsite Costs $m (223) (1,064) (1,361) Net Smelter Return $m 1,512 5,486 7,494 Site Operating Costs $m (1,048) (2,963) (4,318) EBITDA $m 464 2,522 3,176 Change in Workin

  31. Slide 31: Economic Summary: Sensitivity Case

    Economic Summary: Sensitivity Case $4.03/lb Cu, $1.20/lb Zn, $0.95/lb Pb Unit 2023-2026 2027-2036 LOM Gross Revenues $m 1,995 7,316 9,967 Offsite Costs $m (223) (1,064) (1,361) Net Smelter Return $m 1,772 6,252 8,606 Site Operating Costs $m (1,048) (2,963) (4,318) EBITDA $m 724 3,289 4,288 Change in

  32. Slide 32: Proyecto Touro

    ATALAYA MINING > Proyecto Touro

  33. Slide 33: Proyecto Touro

    Proyecto Touro Past producing mine and currently operating as an aggregate quarry 33

  34. Slide 34: Proyecto Touro

    Proyecto Touro Water treatment plant is operational and will address legacy water runoff issues 34

  35. Slide 35: Proyecto Touro

    Proyecto Touro Addressing legacy water runoff issues 35

  36. Slide 36: Proyecto Touro

    Proyecto Touro Community engagement initiatives continue 36

  37. Slide 37: Conclusion

    ATALAYA MINING > Conclusion

  38. Slide 38: Illustrative Production Potential

    Illustrative Production Potential Growth driven by higher grades at Riotinto and potential Touro development Copper Equivalent Production (kt)(1)(2) 1. Recovered metal in concentrate. 2. Copper Equivalent production is calculated from results presented in the PEA and based on $3.50/lb Cu, $1.20/lb Z

  39. Slide 39: Key Activities for 2023

    Key Activities for 2023 50MW solar plant: Construction progressing; start-up in late 2023 E-LIX: Construction of Phase I plant progressing; commissioning in H2 2023 San Dionisio / San Antonio: New Riotinto PEA technical report pending; permitting Touro: Permitting process continues Proyecto Masa Val

  40. Slide 40: Appendix

    ATALAYA MINING > Appendix

  41. Slide 41: Key Information

    Key Information Capitalisation Share Price Performance (GBp) Ticker - LSE: AIM ATYM Share price (17-Mar-23) GBp 325 Basic shares m 139.9 Fully-diluted shares m 143.4 Market capitalisation (basic) £m 455 Market capitalisation (basic) US$m $551 Cash (at 31-Dec) €m 126 Debt (at 31-Dec) €m 73 Enterprise

  42. Slide 42: AISC Benchmarking

    AISC Benchmarking Despite extreme electricity prices in Europe, Atalaya is well-positioned vs. peers Reported AISC (US$/lb) Source: Company filings Note: Peers that do not disclose AISC include Central Asia Metals, Ero Copper, Sandfire and Taseko 42

  43. Slide 43: Reserves and Resources

    Reserves and Resources Attributable Grade Contained Metal Contained Metal Asset Ownership Tonnage Cu Zn Pb Au Ag Cu Zn Pb Au Ag CuEq Cu CuEq Notes Mt g/t g/t Mt Mt Mt Moz Moz Mt Mt Mt Cerro Colorado 100% Reserves 185.7 0.38% - - - - 0.7 - - - - 0.7 0.7 0.7 M&I 200.7 0.37% 0.15% 0.03% - - 0.7 0.3 0.1

  44. Slide 44: Senior Management

    Senior Management Decades of operations, project development and financial expertise Alberto Lavandeira César Sánchez Enrique Delgado Chief Executive Officer, Director Chief Financial Officer Operations – General Manager, Proyecto Riotinto Over 40 years’ experience Former CFO of companies in Former

  45. Slide 45: Board of Directors

    Board of Directors Mining, capital markets, sustainability and finance expertise Non-Executive Over 40 years’ experience in the mining industry. Former Senior Mining Engineer at NM Rothschild & Sons; Roger Chair of the former Director, VP and GM, AngloGold (Argentina). Currently a director of Centra

  46. Slide 46: Atalaya Mining plc Investor Relations

    Contacts: Atalaya Mining plc Alberto Lavandeira, CEO +34 959 59 28 50 info@atalayamining.com Investor Relations Carina Corbett, 4C Communications Ltd +44 20 3170 7973 corbett@4ccommunications.com