  1. Slide 1: ETAC Meeting June 4, 2015

    ETAC Meeting June 4, 2015 Vice President 2015

  2. Slide 2: Solar Resource Definition

    Solar Resource Definition NorthWestern retaining consultants for evaluation of commercial scale installations – Generic “best practices” solar design for Montana (DNV GL) – Solar irradiance data for up to six sites across six Montana divisions (Clean Power Research) – Simulation of solar production

  3. Slide 3: Solar Resources - Summer

    Solar Resources - Summer NorthWestern Energy Effect of Hypothetical 150 MW of Solar On Summer Peak (Week of 8/30/2009) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour Ave. Load with Solar lm Solar Production Ave. Load w/out Solar NorthWesterrt Energy 3 Delivering @ Bright Future

  4. Slide 4: Solar Resources - Winter

    Solar Resources - Winter NorthWestern Energy Effect of Hypothetical 150 MW of Solar On Winter Peak (Week of 12/06/2009) 1200 1000 So — or 800 7 — o = 600 400 200 0 T T T T T T T T a lls T T T T T T T T 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour (mm Solar Production Ave. Lo

  5. Slide 5: Small-Scale Renewables

    Small-Scale Renewables NorthWestern Customer Renewable Production - Montana Annual Solar Production (kWh) 5

  6. Slide 6: NWPCC

    NWPCC Graph C26 Historic and Range of Annual Forecast of Generation from Rooftop Solar MWa Growth rate lower after 2016 Graph C26 shows the historic and range of forecast of generation from the rooftop solar. By 2035 level of generation from rooftop solar units is estimated to be between 150 to 225

  7. Slide 7: Rooftop Solar

    Rooftop Solar Applying NWPCC growth to NorthWestern: 7

  8. Slide 8: 2013 Plan Comments

    2013 Plan Comments • “account for net metering as well as other forms of distributed generation” • Consider modeling net metering capacity of 25 to 45 MW by the end of the planning horizon based on input from ETAC • 5MW of solar PV installed from 1999 through 2014 • 954kW added in 2014 • Additional

  9. Slide 9: DEQ Work

    DEQ Work This page intentionally left for Jeff Blend. 9

  10. Slide 10: Carbon – 2015 RPP

    Carbon – 2015 RPP • Carbon emissions treatment for 2015 Plan is work in progress…we have many questions and not as many answers • MPSC staff comments on 2013 Plan point to ETAC for input & guidance • Limited references to carbon prices from published sources since 1-1-14 • EIA 2015 AEO is silent on

  11. Slide 11: Current Portfolio

    Current Portfolio NorthWestern coal ownership 8-9% of total MT fleet: remainder owned by out-of-state interests Portfolio with hydroelectric assets is 41% under 2030 Clean Power Plan target NorthWestern responsible for 80% of statewide energy efficiency Additional energy efficiency needs to fit a ut

  12. Slide 12: Carbon Cost Reference Points

    Carbon Cost Reference Points 12

  13. Slide 13: Generic Carbon Values

    Generic Carbon Values What do you need to know? • Beginning value • Start date • Rate of change 13

  14. Slide 14: Portfolio Modeling

    Portfolio Modeling • Risk premium determination requires stochastic variables – Natural gas and electricity variability will be defined using historic values and derived implied volatility – Don’t recognize carbon cost in historic record (NW mkt) – Possible alternatives for carbon price risk o Marke

  15. Slide 15: Stochastic / Monte Carlo Methods

    Stochastic / Monte Carlo Methods • Both the stochastic and Monte Carlo methods require a data point distribution from which to select values • 2013 Plan used a triangular distribution $21.11 2021 $0 $42.22 What other distribution types or value sampling should be considered? 15

  16. Slide 16: Hydroelectric Resource Descriptions

    Hydroelectric Resource Descriptions 16

  17. Slide 17: Hydroelectric Generation and Capacity Factor

    Hydroelectric Generation and Capacity Factor Long-term Planning Assumptions o Ten years worth of historical production is loaded in PowerSimm by facility. o NorthWestern will use low production from the 10-year history to simulate minimum hydro conditions in the 2015 Plan. o Simulated weather condit

  18. Slide 18: ETAC Opportunities

    ETAC Opportunities • PowerSimm workshop (August?) • Viewing the model – Inputs – Results – Results validation & demonstration • Exporting results to Excel could eliminate the need for direct access 18