Chalice Gold Mines Limited

Chalice Gold Mines — Merger or Acquisition (April 2009)

14 slides from Chalice Gold Mines's merger presentation, April 2009

  1. Slide 1: Chalice Gold Mines and Sub-Sahara Resources Merger Presentation April 2009

    Chalice Gold Mines Limited Sub--Sahara Resources NL Sub Merger Presentation April 2009 www.subsahara.com.au www.chalicegold.com

  2. Slide 2: Disclaimer

    Disclaimer The material used in this presentation is intended to be a summary of the proposed merger between Chalice Gold Mines Limited and Sub Sahara Resources NL and includes activities that are current and proposed based on the information available to Chalice Gold Mines Limited as at 20th April

  3. Slide 3: Merger Snapshot

    y Chalice Gold Mines and Sub-Sahara Resources have agreed, subject to consents and approvals, to merge by way of a Scheme of Arrangement y Scheme S h consideration id ti will ill comprise i 1 Chalice Ch li Share Sh for f every 10.73 Sub-Sahara Shares y The proposed merger will combine Chalice Chalic

  4. Slide 4: Post Merger Snapshot

    y Approximately 121M shares on Post Merger Board issue on completion of the Tim Goyder (Executive Chairman) merger Doug Jones (Managing Director) y Post merger market capitalisation of $17M (based on Mike Griffiths (Executive Director) Chalice share price of $0.14) Anthony Kiernan (Non (Non-executiv

  5. Slide 5: Indicative Merger Timetable (subject to change)

    Execution of MIA 29 April 2009 Lodging Scheme Booklet with ASX and ASIC 15 May 2009 First Court Hearing 26 May 2009 Despatch of Notice of Meeting & Scheme Booklet to SBS Shareholders 1 June 2009 Scheme Meeting 1 July 2009 Second Court Hearing 9 July 2009 Lodging of Court Order with ASIC 13 July 2009

  6. Slide 6: Gold in the Arabian-Nubian Shield

    y Zara Gold Project lies within the Precambrian Arabian-Nubian Shield y Hostt to H t numerous +1Moz +1M d deposits it andd mines i with a history dating back to ancient times y Gold endowment >20Mozs – but largely unexplored l d iin modern d ti times y Various deposit types including mesothermal & e

  7. Slide 7: Eritrea

    : Eritrea ERITREAN PROJECTS NORTH-EAST AFRICA Ethiopia

  8. Slide 8: The Zara Gold Project

    y Koka Deposit - JORC compliant Indicated and Inferred resource of 5.04 Mt grading 5.8 g/t gold for 944,000 oz contained y Current resource based on results from 109 diamond drill holes (~18,000 metres drilled) y 570 metres strike length y 20 30 metres wide 20-30 y Drilled to a depth of 300 metres y

  9. Slide 9: Koka Deposit - Mineralisation

    y Quartz stockwork system cutting micro-granite sill Galena y Limited oxide – bulk of resource Visible Gold is primary sulphide y Coarse sulphide blebs associated Pyrite y with quartz veins y Visible gold & high gold values associated i t d with ith pyrite, it galena, l sphalerite & minor chalcopyri

  10. Slide 10: Koka Deposit - 3D Model

    10 3D Model Koka Deposit - XN

  11. Slide 11: Koka Deposit – Section 9840N

    33m @ 4.17 g/t 28m @ 8.16 g/t 18m @ 9.46 g/t 7m @ 23.29 g/t Koka Deposit – Section 9840N 11

  12. Slide 12: Koka Deposit – Section 9520N

    W E 10m @ 76.8 g/t 11m @ 14.7 g/t 6m @ 42.3 g/t Koka Deposit – Section 9520N 12

  13. Slide 13: Exploration Upside – virtually untouched

    Koka Prospect Konate Prospect Fah Prospect Debra Keyih Debra Tsaeda Prospect Prospect Exploration Upside – virtually untouched 13

  14. Slide 14: Competent Persons Statement

    Competent Persons Statement The information in this report that relates to Exploration Results is based on information compiled by Dr Doug Jones, Jones a full-time full time employee and Director of Liontown Resources Limited, who is a Member of the Australasian Institute of Mining and Metallurgy an

Chalice Gold Mines — Merger or Acquisition (April 2009) on 6ix