  1. Slide 1: A Focus On Balance

    A Focus On Balance A Novel Approach Taking the Phillips Optimized Cascade LNG Process Into the Future Prepared for AIChE Spring National Meeting April 2003, New Orleans LNG I – Operation and Reliability AIChE 2003 Spring National Meeting

  2. Slide 2: Presentation Agenda

    Presentation Agenda „ Introduction „ Setting the Perspective „ Current Phillips Optimized Cascade LNG Process „ An Alternate Approach „ Furthering The Approach „ Conclusions AIChE 2003 Spring National Meeting

  3. Slide 3: Introduction - Variables To Balance

    Introduction - Variables To Balance - „ Variables – CAPEX – OPEX • Availability, Reliability, Maintainability, Production Efficiency, Onstream Factor, Capacity Factor • Thermal Efficiency – Schedule „ Analysis – Life Cycle Cost • RAM Analysis – NPV „ More Difficult Concepts – Process Stability, Proc

  4. Slide 4: Introduction - Defining the Variables

    Introduction - Defining the Variables - „ CAPEX – Include Entire Integrated Facility • Battery Limit Through Storage & Loading, Including Utilities – Total Installed Cost Basis - Exclude Owner’s Cost „ Thermal Efficiency – (HHV Products)/(HHV Feed)*100 – All Products – Entire Facility Including Offs

  5. Slide 5: Introduction - Defining the Variables Continued

    Introduction - Defining the Variables Continued - „ Availability (Up Time/Total Time) – Calculation: MTTF/(MTTF + MTTR + Mean Logistics Delay)*100 – Useful for Comparing Total Downtime of Various Options, Critical Sparing Philosophy, and Other Downtime Related Variables „ Production Efficiency – Cal

  6. Slide 6: Introduction - Balancing the Variables

    Introduction - Balancing the Variables - „ Iterative Economic Solution – Multiple Options – Simultaneous Marketing Analysis – Environmental Impact Development – Mechanical Design Specifications – Equipment Vendor Alliances & Preferences – Management, Operations, Rotating Machinery Preferences – Sche

  7. Slide 7: Setting The Perspective

    Setting The Perspective Historical & Current Overview of Technology In Consideration AIChE 2003 Spring National Meeting

  8. Slide 8: Early Phillips Optimized Cascade Process

    Setting the Perspective - Early Phillips Optimized Cascade Process - Feed Gas Plant Fuel Gas Fuel Compressor Gas Propane Ethylene Methane Conditioning Refrigerant Refrigerant Refrigerant Marine LIQUEFACTION LNG Storage Facilities LNG Shipping AIChE 2003 Spring National Meeting

  9. Slide 9: Kenai Alaska Facility

    Setting The Perspective - Kenai Alaska Facility - AIChE 2003 Spring National Meeting

  10. Slide 10: Improvements Over Early Design

    Setting The Perspective - Improvements Over Early Design - „ Elimination of Fuel Gas Compression „ Heavies Removal Integration „ Improved Heat Integration „ Optimized Cold Box Configuration „ Improved Plant Layout and Constructability „ Open Loop Methane Cycle – Reduction in Vessels & Exchangers – B

  11. Slide 11: Current Simplified Block Flow Schematic

    Setting The Perspective - Current Simplified Block Flow Schematic - Feed Fuel Gas Plant Distribution Fuel Gas Propane Ethylene Methane Vapor Conditioning Refrigerant Refrigerant Refrigerant Recovery Ship Vapors LNG Storage Marine LIQUEFACTION & LPG RECOVERY and Facilities Loading LPG LPG Product(s)

  12. Slide 12: Phillips Optimized Cascade LNG Process

    Setting The Perspective - Phillips Optimized Cascade LNG Process - AIChE 2003 Spring National Meeting

  13. Slide 13: Simplified Driver Configuration

    Setting The Perspective - Simplified Driver Configuration - T/C T/C T/C T/C T/C T/C 50% 50% 50% 50% 50% 50% Gas Propane Ethylene Methane Storage & Conditioning Cycle Cycle Cycle Loading 100% 100% 100% 100% 100% „ Overall Plant Availability >95% – Kenai – Over 33 Years Operation – Atlantic – Over 4 Y

  14. Slide 14: Typical Balancing Act Results

    Setting The Perspective - Typical Balancing Act Results - „ CAPEX – Grass Roots ~ $200-250/MTPA – Multiple Trains < $200/MTPA – < 3% Contract Variations – Under Budget „ Schedule – All Projects Ahead of EPC Schedule „ Thermal Efficiency – Up to and Over 93% „ Availability – ~ 98% and Over „ Producti

  15. Slide 15: Atlantic LNG Facilities

    Setting The Perspective - Atlantic LNG Facilities - AIChE 2003 Spring National Meeting

  16. Slide 16: Egyptian LNG Project

    Setting The Perspective - Egyptian LNG Project - AIChE 2003 Spring National Meeting

  17. Slide 17: Darwin LNG Project

    Setting The Perspective - Darwin LNG Project - AIChE 2003 Spring National Meeting

  18. Slide 18: An Alternate Approach

    An Alternate Approach Minimize Gas Turbines and Integrate Waste Heat Recovery AIChE 2003 Spring National Meeting

  19. Slide 19: Single Turbines & Waste Heat Recovery

    An Alternate Approach - Single Turbines & Waste Heat Recovery - HR SG GE-7EA C3 C3 M HR SG GE-7EA C2= C2= M Stm Turb C1 C1 C1 AIChE 2003 Spring National Meeting

  20. Slide 20: Basis For Study

    An Alternate Approach - Basis For Study - „ Study Performed Using PDC – LNG Product Development Center „ Base Case – Atlantic Train 2 Conditions – Feed and Ambient Conditions Fairly Typical „ Multiple Driver/Compressor Configurations – Compared Against Base Case AIChE 2003 Spring National Meeting

  21. Slide 21: Balancing Act Result Positives

    An Alternate Approach - Balancing Act Result Positives - „ CAPEX – ~ $200/MTPA (For Case Studied) „ Schedule – Assume Accurate EPC Schedule „ Thermal Efficiency – 93+% „ Production Efficiency – ~ 93% „ Capacity Factor – Assume > 1 (Predicted Production > Design Production) AIChE 2003 Spring National

  22. Slide 22: Balancing Act Result Negatives

    An Alternate Approach - Balancing Act Result Negatives - „ Decreased Process Flexibility – No Two-Train-In-One Reliability – Complicated Steam System – Single Shaft Turbines • Loss of Speed Control • Longer Startup Sequence • Low Compressor Case Pressure Required for Startup „ Note 1: Supplemental p

  23. Slide 23: Furthering The Approach

    Furthering The Approach Rebalancing the Variables Minimize Gas Turbines, Integrate Waste Heat Recovery & Maintain Historical “Two-Train-In-One” Reliability AIChE 2003 Spring National Meeting

  24. Slide 24: Add "Two Train In One" Reliability

    Furthering The Approach - Add “Two Train In One” Reliability - HR SG GE-7EA C3 C2= M HR SG GE-7EA C3 C2= M Stm Turb C1 C1 C1 Stm Turb C1 C1 C1 AIChE 2003 Spring National Meeting

  25. Slide 25: Balancing Act Result Positives

    Furthering The Approach - Balancing Act Result Positives - „ CAPEX – Marginal Increase over Alternate Approach Above – ~ $200/MTPA (For Case Studied) – ~ 16% Decrease on TDC Basis From Base Case „ Schedule – Assume Accurate EPC Schedule „ Thermal Efficiency – 93+% „ Production Efficiency – ~ 95% Í A

  26. Slide 26: Balancing Act Result Negatives

    Furthering The Approach - Balancing Act Result Negatives - „ Decreased Flexibility Over Multiple Dual Shaft Turbine Designs – Complicated Steam System But With Higher Reliability – Single Shaft Turbines • Loss of Speed Control • Longer Startup Sequence • Low Compressor Case Pressure Required for Sta

  27. Slide 27: Conclusions

    Conclusions „ Cost Competitive, Flexible Solution With Waste Heat Integration „ Configuration Using GE Frame 7EA’s – For Feed Conditions Considered, Applicable From 3.5 to 5.5 MTPA • No Power Augmentation Other Than Starting Torque Requirements Considered & No Vapor Or Liquid Expanders Considered. „

  28. Slide 28: Conclusions - Continued

    Conclusions - Continued „ Environmentally Friendly Option – Less Point Sources for Emissions – Recovery of Thermal Energy „ Advantages Over Cogeneration Options – Large Electrical Motors Are Not Required – No Complicated Electrical Distribution – Power Directly Coupled to Refrigeration Shaft „ Easil

  29. Slide 29: THANK YOU

    THANK YOU AIChE 2003 Spring National Meeting