Robyg S.A. · GPW:ROB

Robyg — FY2025 Earnings Presentation

63 slides from Robyg's earnings presentation, March 2026

  1. Slide 1: Financial Results 2025

    Slide 1: Financial Results 2025

    Financial Results 2025 Warsaw, March 2026

  2. Slide 2: Agenda

    Slide 2: Agenda

    AGENDA PART 01 Summary PART 02 Sales results and revenue perspective PART 03 Financial results PART 04 Plans of ROBYG Group PART 05 ESG PART 06 Appendices 2

  3. Slide 3: Part 01 Summary 2025

    Slide 3: Part 01 Summary 2025

    ROBYG PART O01 Summary 2025

  4. Slide 4: Summary 2025: revenues and cash position

    Slide 4: Summary 2025: revenues and cash position

    01. Summary 2025 Financial Results 2025 Revenues Strong cash position* Operating cash flow 1 546 mln PLN 307 mln PLN 445 mln PLN (excl. purchases of new plots) 4 * Including amounts kept on individual escrow accounts.

  5. Slide 5: Units presold, under construction and land bank

    Slide 5: Units presold, under construction and land bank

    01. Summary 2025 Number of units under Developer and preliminary construction Units presold: agreements signed: for ROBYG Group app. 2 570 * app. 2 500 app. 4 820** (net after cancellations) (net after cancellations) Units on offer Number of units recognised Total land bank units in revenues app. 2

  6. Slide 6: Activities for other entities within TAG Rent Poland

    Slide 6: Activities for other entities within TAG Rent Poland

    01. Summary 2025 ROBYG Group’s activities for other entities within TAG Rent Poland* Residential sales coordination General contractor services Revenue from services provided to Number of units contracted Number of units under construction TAG Rent Poland in 2025: as of 31.12.2025: in 2025: 250 app.

  7. Slide 7: Material acquisitions and financial activities

    Slide 7: Material acquisitions and financial activities

    01. Summary 2025 Gdynia Gdansk Warsaw ROBYG Group – material acquisitions and financial activities Warsaw New financing: NEW PLOTS 1 145 mln PLN approx. 765 mln PLN FINANCIAL ACTIVITY Area of plots [ha] Type of contracts Locations CREDIT FACILITIES 3,8 Preliminary Babice (near Warsaw) 4,9 Preliminar

  8. Slide 8: Part 02 Sales results & revenue perspective

    Slide 8: Part 02 Sales results & revenue perspective

    P A R T 02 Sales results & revenue perspective 8

  9. Slide 9: Developer and preliminary agreements signed in 2025

    Slide 9: Developer and preliminary agreements signed in 2025

    02. Sales results & revenue perspective D e v e l o p e r a n d p r e l i m i n a r y a g r e e m e n t s s i g n e d i n 2 0 2 5 : 2 507* 4308 17% 100% -5 0 % 3471 -27% 27% 2957 2% 31% 2 8 0 9 -3 3 % 10% 2 5 6 9 -16% 2520 33% 2 507 22% 2333 2118 2156 2144 56% 1731 1891 9% 1019 1113 2011 2012 2013 2

  10. Slide 10: Pre-sold units in 2025 by city

    Slide 10: Pre-sold units in 2025 by city

    02. Sales results & revenue perspective 943 UNITS 37% GDANSK & GDYNIA Pre-sold units in 2025: 2 573* 346 1068 UNITS UNITS 13% POZNAN 13% 13 42% UNITS 8% WROCLAW POZNAN WARSAW 1% 203 37% GDANSK &GDYNIA UNITS LODZ 8% 42% WARSAW WROCLAW 1% LODZ 10 * I n c l . 363 agreements in jointly controlled projec

  11. Slide 11: Units on offer

    Slide 11: Units on offer

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e ROBYG Group – units on offer FINISHED GOODS ON Number of units on offer O F F E R : 5% 2314* 2060 1949 1948 1777 79 112 1695 23 1579 75 49 58 39 58 58 58 1981 2 202 1926 1873 1719 1646 1540 1719** 1719** 1719** 2Q 2024 3Q 2024 4Q 2024

  12. Slide 12: Revenue recognition

    Slide 12: Revenue recognition

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e R O B Y G G r o u p – r e v e n u e r e c o g n i t i o n ( a s a t December 31st, 2025) Recognition potential of units in revenues: Number of units recognized in revenues (quarterly) Units not presold and not r e c o g n i z e d *: 2

  13. Slide 13: Units to be completed in 2026-2027

    Slide 13: Units to be completed in 2026-2027

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2026-2027 and also (contracted) until December 31st 2025 2025 2027 Total & contracted 2026 2026+ 2 0 2 7 Total Total Total Total Contracted Contracted Contracted Contracted units units units units R

  14. Slide 14: Number of units to be completed in 2026

    Slide 14: Number of units to be completed in 2026

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2026 G d a n s k & Gdynia Warsaw Wroclaw & Poznan Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2026 completed in 2026 completed in 2

  15. Slide 15: Number of units to be completed in 2027

    Slide 15: Number of units to be completed in 2027

    02. S a l e s r e s u l t & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2027 G d a n s k & Gdynia Warsaw Wroclaw & Poznan Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2027 completed in 2027 completed in 202

  16. Slide 16: Part 03 Financial results

    Slide 16: Part 03 Financial results

    ROBYG PART Financial results 16

  17. Slide 17: Financial results

    Slide 17: Financial results

    03. F i n a n c i a l r e s u l t s (PLNk) 2025 2024 Change Revenues 1 546 114 1 301 353 18,81% Sales of residential and commercial units 1 100 345 1 116 457 (1,44%) Revenues from sales to related parties 405 104 166 513 143,29% Other revenues 40 665 18 383 121,21% Cost of sales (1 167 643) (975 391

  18. Slide 18: Financial condition

    Slide 18: Financial condition

    03. F i n a n c i a l r e s u l t s Financial condition (PLNk) 2025 2024 Change Total assets, including: 4 317 708 3 561 949 21,22% Non-current assets, including: 1 208 784 999 407 20,95% Investment properties and investment properties under 902 635 680 224 32,70% construction Loans granted to relat

  19. Slide 19: Statement of cash flow

    Slide 19: Statement of cash flow

    03. F i n a n c i a l r e s u l t s Statement of cash flow (PLNk) 2025 2024 Net cash flows from operating activities, including: (146 354) 41 391 Expenditures for the purchase of new plots (408 847) (432 949) Net cash flows from investing activities, including: (139 671) (244 278) Purchase of invest

  20. Slide 20: Debt financing

    Slide 20: Debt financing

    03. F i n a n c i a l r e s u l t s Debt financing Nominal value and maturity of bank credit facilities and bonds as at December 31st 2025 (PLNm). DEBT - Aging <1 year 1-2 years 2-3 years 3-4 years 4-5 years Over 5 years Total BANK CREDIT FACILITIES 50,00 125,42 0,00 0,00 0,00 0,00 175,42 BANK CREDI

  21. Slide 21: Leverage and collections

    Slide 21: Leverage and collections

    03. F i n a n c i a l r e s u l t s Leverage and collections as at December 31st 2025 * Net debt ratio = net debt ** / equity ** N e t d e b t = in t e re st b e a rin g lia b ilit ies + d eriva t ives + g u a ra n t ees N e t d e b t r a t i o * = 0,22 g ra n t e d – in t e rc o mp a ny lo a n s –

  22. Slide 22: Part 04 Plans of ROBYG Group

    Slide 22: Part 04 Plans of ROBYG Group

    PART 04 Plans of ROBYG Group 22

  23. Slide 23: Strategic goals

    Slide 23: Strategic goals

    04. Plans of ROBYG Group Strategic goals Increasing sales in 2026 and the years ahead Maintaining of margins Expansion of operations in major Polish cities, including Krakow. Maintaining of the land bank level Realisation of the ESG strategy 23 * Incl. units in jointly controlled projects.

  24. Slide 24: New co-operation scheme with TAG

    Slide 24: New co-operation scheme with TAG

    04. Plans of ROBYG Group New co-operation scheme Strategy for the operational and business activities of the ROBYG Group agreed with TAG Immobilien AG (hereinafter: "TAG") for all TAG activities on the Polish residential market, i.e. for the activities of the ROBYG Group and Vantage Development S.A.

  25. Slide 25: Total land bank

    Slide 25: Total land bank

    04. Plans of ROBYG Group Total land bank 19 078** units + 2 314 units on offer = 21 392 units Gdansk&Gdynia Warsaw Wroclaw Poznan District Number of units % District Number of units % District Number of units % District Number of units % Zaspa 431 9% Wilanow 586 6% Krzyki 249 14% Piatkowo 442 20% Sr

  26. Slide 26: Planned changes regarding land bank

    Slide 26: Planned changes regarding land bank

    04. Plans of ROBYG Group Planned changes regarding Landbank Landbank Landbank Units to be Total units units to be purchased number of ROBYG sold to from units to be VANTAGE VANTAGE completed by ROBYG TOTAL 2 905 1 539 17 712 19 078 26

  27. Slide 27: Commercial potential

    Slide 27: Commercial potential

    04. Plans of ROBYG Group Commercial potential = 71 500 sqm of usable area WROCLAW WARSAW GDANSK 24 000 17 500 30 000 TOTAL: 71 500 sqm 27

  28. Slide 28: Part 05 ESG

    Slide 28: Part 05 ESG

    PART 05 ESG Creating people and planet friendly spaces 28

  29. Slide 29: Mission, values and directions

    Slide 29: Mission, values and directions

    05. ESG FOR SOCIETY AND ENVIRONMENT MISSION OUR VALUES DIRECTIONS “Our goal at ROBYG is to build homes and suitable surroundings for our clients. We develop homes CARE and housing developments for entire communities The protection of natural resources and that are integrated with the surrounding car

  30. Slide 30: The biggest ESG successes in 2025

    Slide 30: The biggest ESG successes in 2025

    05. ESG FOR SOCIETY AND ENVIRONMENT The biggest ESG successes in 2025 Development of a consolidated 96% of the usable floor area sustainability report in Launch of 2 pilot projects (UFA) of multi-family Life cycle assessment (LCA) cooperation with TAG, in aimed at meeting the residential buildings c

  31. Slide 31: Environmental dimension: ROBYG for Planet

    Slide 31: Environmental dimension: ROBYG for Planet

    05. ESG – Environmental dimension ROBYG FOR PLANET ROBYG for the Planet means that we lead a sustainable development process, and we fully respect the natural environment on all our projects. Strategic Goals 1. 100% of electricity used in the construction process at ROBYG to come from renewable ener

  32. Slide 32: The Green Standard

    Slide 32: The Green Standard

    05. ESG – Environmental dimension ROBYG FOR PLANET THE GREEN STANDARD The audit conducted in 2025 confirmed 100% compliance of ROBYG projects with the Green Standard guidelines. It is an internal regulation that defines how construction works should be designed and carried out to ensure greater envi

  33. Slide 33: Social dimension: ROBYG for People

    Slide 33: Social dimension: ROBYG for People

    05. ESG – Social dimension ROBYG FOR PEOPLE For us, construction is part of the process of Strategic Goals creating new communities, which includes erecting buildings, developing infrastructure, shaping green areas, and creating spaces for 1. ROBYG Zero Accidents: zero serious and fatal accidents on

  34. Slide 34: Governance dimension: ROBYG for Sustainable Business

    Slide 34: Governance dimension: ROBYG for Sustainable Business

    05. ESG – Governance dimension ROBYG FOR SUSTAINABLE BUSSINES We act responsibly by choosing to partner with local businesses, caring for the natural environment and managing the company responsibly while delivering strong financial results. Sustainable governance also means that we communicate abou

  35. Slide 35: ESG commitment

    Slide 35: ESG commitment

    05. ESG All of us at ROBYG acknowledge how important sustainable development is for the envirnomnent and society. So far we have done a lot, but we treat this is a journey that will involve over time. Thus, we are committed to continuing our work to constantly improve our performance and disclose it

  36. Slide 36: Part 06 Appendices

    Slide 36: Part 06 Appendices

    ROBYG PART Appendices 36

  37. Slide 37: Senior Management Team

    Slide 37: Senior Management Team

    06. Appendices Senior Management Team Oscar Kazanelson Artur Ceglarz Dariusz Pawlukowicz Eyal Keltsh Marta Hejak Chairman of the Supervisory Vice President, Vice President, President of the Board, CEO Vice President, CFO Board Head of Business Dev. Head of HR and ESG Years at ROBYG: 20+ Years at ROB

  38. Slide 38: Ownership structure

    Slide 38: Ownership structure

    06. Appendices Ownership structure TAG Immobilien AG holds indirectly 100% of ROBYG S.A. shares. TAG Immobilien AG is a MDAX-listed (Frankfurt Stock Exchange) real estate company. 38

  39. Slide 39: TAG Immobilien AG consolidated financials

    Slide 39: TAG Immobilien AG consolidated financials

    06. A p p e n d i c e s TAG Immobilien AG consolidated financials (EURm) Financial data (EURm) Q3 2025 2024 2023 2022 Assets 8 877,90 7 750,25 7 299,80 8 214,60 Equity 3 516,10 3 099,85 2 964,50 3 307,70 EBITDA (adjusted) rental business 188,4 238,5 236,4 233,5 EBITDA (adjusted) from sales business

  40. Slide 40: Investments under construction (1)

    Slide 40: Investments under construction (1)

    06. Appendices Description of investments – under construction (1) Lawendowe Wzgorza / Osiedle Kameralne City Sfera Stacja Nowy Gdansk City: Gdansk City: Warsaw City: Warsaw District: Jasien District: Bemowo District: Wlochy No. of stages: 37 No. of stages: 7 No. of stages: 14 Stages completed: 36 S

  41. Slide 41: Investments under construction (2)

    Slide 41: Investments under construction (2)

    06. Appendices Description of investments – under construction (2) Young City 2/ Osiedle Życzliwa Praga Modern City Metro Life Apartamenty City: Warsaw City: Warsaw City: Warsaw District: Bemowo District: Tarchomin District: Bemowo No. of stages: 4 No. of stages: 8 No. of stages: 9 Stages completed:

  42. Slide 42: Investments under construction (3)

    Slide 42: Investments under construction (3)

    06. Appendices Description of investments – under construction (3) Porto Nadmotlawie Estate Szumilas City: Gdansk City: Gdansk City: Gdansk (Kowale) District: Nowy Port District: Srodmiescie No. of stages: 6 No. of stages: 9 No. of stages: 9 Stages completed: 5 Stages completed: 4 Stages completed:

  43. Slide 43: Investments under construction (4)

    Slide 43: Investments under construction (4)

    06. Appendices Description of investments – under construction (4) Apartamenty Krakowska Rosa Residence Poczatek Piatkowo City: Wroclaw City: Gdansk City: Poznan District: Krzyki District: Ujescisko District: Piatkowo No. of stages: 3 No. of stages: 2 No. of stages: 8 Stages under construction: 2 St

  44. Slide 44: Investments under construction (5)

    Slide 44: Investments under construction (5)

    06. Appendices Description of investments – under construction (5) Sady Ursynow Rytm Mokotowa Apartamenty Lira House City: Warsaw City: Warsaw City: Lodz District: Ursynow District: Mokotow District: Srodmiescie No. of stages: 3 No. of stages: 4 No. of stages: 2 Stages completed: 2 Stages completed:

  45. Slide 45: Investments under construction (6)

    Slide 45: Investments under construction (6)

    06. Appendices Description of investments – under construction (6) Wendy Kobieli Leszczynskich 2 City: Gdynia City: Gdansk City: Gdansk District: Srodmiescie District: Ujescisko District: Brzezno No. of stages: 5 No. of stages: 1 No. of stages: 1 Stages under construction: 3 Stages under constructio

  46. Slide 46: Investments under construction (7)

    Slide 46: Investments under construction (7)

    06. Appendices Description of investments – under construction (7) Foresteria Nowa Walowa Elektrovnia Garbary City: Gdynia City: Gdansk City: Poznan District: Wielki Kack District: Srodmiescie District: Ostrow Tumski No. of stages: 7 No. of stages: 4 No. of stages: 12 Stages under construction: 3 St

  47. Slide 47: Investments completed (1)

    Slide 47: Investments completed (1)

    06. Appendices Description of investments – completed (1) Szczesliwy Dom Osiedle Zdrowa Nowa Rezydencja Krolowej Marysienki City: Warsaw City: Warsaw City: Warsaw District: Ochota District: Wilanow District: Wilanow No. of stages: 3 No. of stages: 5 No. of stages: 10 No. of units: 304 units No. of u

  48. Slide 48: Investments completed (2)

    Slide 48: Investments completed (2)

    06. Appendices Description of investments – completed (2) City Apartments Osiedle Krolewskie Albatross Towers City: Warsaw City: Warsaw City: Gdansk District: Żoliborz District: Wilanow District: Przymorze No. of stages: 6 No. of stages: 6 No. of stages: 5 No. of units: 1 190 units No. of units: 640

  49. Slide 49: Investments completed (3)

    Slide 49: Investments completed (3)

    06. Appendices Description of investments – completed (3) Krolewski Park Park Wola Residence Modern Żoliborz City: Warsaw City: Warsaw City: Warsaw District: Wilanow District: Wola District: Żoliborz No. of stages: 6 No. of stages: 1 No. of stages: 1 No. of units: 528 units No. of units: 317 units N

  50. Slide 50: Investments completed (4)

    Slide 50: Investments completed (4)

    06. Appendices Description of investments – completed (4) Young City Mlody Wilanow Mila Baltica City: Warsaw City: Warsaw City: Gdansk District: Bemowo District: Wilanow District: Zaspa No. of stages: 9 No. of stages: 3 No. of stages: 2 No. of units: 1 302 units No. of units: 257 units No. of units:

  51. Slide 51: Investments completed (5)

    Slide 51: Investments completed (5)

    06. Appendices Description of investments – completed (5) Apartamenty Villa Nobile Sloneczna Morena MoreNova City: Warsaw City: Gdansk City: Gdansk District: Wilanow District: Piecki-Migowo District: Piecki-Migowo No. of stages: 3 No. of stages: 22 No. of stages: 3 No. of units: 637 units No. of uni

  52. Slide 52: Investments completed (6)

    Slide 52: Investments completed (6)

    06. Appendices Description of investments – completed (6) Ogrody Wilanow Green Mokotow Stacja Nowy Ursus City: Warsaw City: Warsaw City: Warsaw District: Wilanow District: Mokotow District: Ursus No. of stages: 3 No. of stages: 9 No. of stages: 5 No. of units: 221 units No. of units: 673 units No. o

  53. Slide 53: Investments completed (7)

    Slide 53: Investments completed (7)

    06. Appendices Description of investments – completed (7) Forum Wola Praga Arte Lesna Przystan City: Warsaw City: Warsaw City: Wroclaw District: Wola District: Praga Poludnie District: Osobowice No. of stages: 4 No. of stages: 1 No. of stages: 1 No. of units: 880 units No. of units: 250 units No. of

  54. Slide 54: Investments completed (8)

    Slide 54: Investments completed (8)

    06. Appendices Description of investments – completed (8) Willa Nad Potokiem Uroczysko Zajezdnia Wrzeszcz City: Wroclaw City: Wroclaw City: Gdansk District: Fabryczna District: Psie Pole District: Wrzeszcz No. of stages: 1 No. of stages: 3 No. of stages: 14 No. of units: 13 units No. of units: 309 u

  55. Slide 55: Investments completed (9)

    Slide 55: Investments completed (9)

    06. Appendices Description of investments – completed (9) Wiecej Park Poludnie Apartamenty Krolewskie City: Gdansk City: Gdansk City: Warsaw District: Lostowice District: Lostowice District: Wilanow No. of stages: 2 No. of stages: 8 No. of stages: 2 No. of units: 378 units No. of units: 565 units No

  56. Slide 56: Investments completed (10)

    Slide 56: Investments completed (10)

    06. Appendices Description of investments – completed (10) Praga Deco Wojszyckie Alejki Mlode Stogi City: Warsaw City: Wroclaw City: Gdansk District: Praga Poludnie District: Krzyki District: Stogi No. of stages: 1 No. of stages: 2 No. of stages: 1 No. of units: 192 units No. of units: 210 units No.

  57. Slide 57: Investments completed (11)

    Slide 57: Investments completed (11)

    06. Appendices Description of investments – completed (11) Kameralna Olszowka VISTA (Mysliwska) Wisniowa Aleja City: Wroclaw City: Gdansk City: Gdansk District: Krzyki District: Piecki-Migowo District: Ujescisko No. of stages: 1 No. of stages: 1 No. of stages: 2 No. of units: 55 units No. of units:

  58. Slide 58: Investments completed (12)

    Slide 58: Investments completed (12)

    06. Appendices Description of investments – completed (12) Sea Salt Dożynkowa 43 Osiedle nad Widawa City: Gdansk City: Wroclaw City: Wroclaw District: Zaspa District: Krzyki District: Psie Pole No. of stages: 1 No. of stages: 1 No. of stages: 1 No. of units: 118 units No. of units: 11 units No. of u

  59. Slide 59: Investments completed (13)

    Slide 59: Investments completed (13)

    06. Appendices Description of investments – completed (13) Moment Lagom Nowa Letnica City: Gdansk City: Gdansk City: Gdansk District: Ujescisko District: Ujescisko District: Letnica No. of stages: 2 No. of stages: 1 No. of stages: 9 No. of units: 207 units No. of units: 41 units No. of units: 2 197

  60. Slide 60: Investments completed (14)

    Slide 60: Investments completed (14)

    06. Appendices Description of investments – completed (14) Moj Ursus Jutrzenki 92 Praga Piano City: Warsaw City: Warsaw City: Warsaw District: Ursus District: Wlochy District: Praga Poludnie No. of stages: 8 No. of stages: 1 No. of stages: 1 No. of units: 2 293 units No. of units: 142 units No. of u

  61. Slide 61: Investments completed (15)

    Slide 61: Investments completed (15)

    06. Appendices Description of investments – completed (15) Royal Residence Jagodno Przystanek Tarnogaj City: Warsaw City: Wroclaw City: Wroclaw District: Wilanow District: Krzyki District: Krzyki No. of stages: 7 No. of stages: 11 No. of stages : 1 No. of units: 1 112 units No. of units: 854 units N

  62. Slide 62: Disclaimer

    Slide 62: Disclaimer

    Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A. accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely

  63. Slide 63: Summary 2025 and contact

    Slide 63: Summary 2025 and contact

    Summary 2025 Please contact us: Units pre-sold: app. 2 570 (net after cancellations) Investor Relations ROBYG S.A. ri@robyg.com.pl Units on offer: app. 2 310 (out of which 5% are finished goods) (22) 419 11 00 Revenues: PLN 1 546 million Strong cash position*: PLN 307 million Operating cash flow: PL

Source: company website

More decks from Robyg S.A.

All 64 Robyg decks