Lindian Resources Limited · ASX:LIN

Lindian Resources — Investor Presentation (July 2024)

97 slides from Lindian Resources's investor presentation, Jul 10, 2024

  1. Slide 1: Retraction and Replacement of Presentations

    ASX ANNOUNCEMENT 10 JULY 2024 RETRACTION AND REPLACEMENT OF PRESENTATIONS Lindian Resources Limited (ASX:LIN) (“Lindian” or “the Company”) released an ASX announcement titled “Corporate Presentation” on 9 July 2024, and an ASX announcement titled “Kangankunde Project Feasibility Study Presentation”

  2. Slide 2: Kangankunde Rare Earths Project Stage 1 Feasibility Study Results

    Kangankunde Rare Earths Project For personal use only Stage 1 Feasibility Study Results 3 July 2024 ASX:LIN OTCQB:LINIF

  3. Slide 3: Important Information: Disclaimer

    IMPORTANT INFORMATION Disclaimer Competent Persons’ Statement The material in this presentation has been prepared by Lindian Resources Limited (“Company”). The information in this presentation that relates to Exploration Results, Metallurgy Results, and Mineral Resources of the Kangankunde Rare Eart

  4. Slide 4: Feasibility Study Results: Overview

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Overview 3

  5. Slide 5: Kangankunde Location and Background

    KANGANKUNDE LOCATION AND BACKGROUND • Malawi is a stable jurisdiction with English Law and a democratically elected government. For personal use only • Kangankunde is in proximity to Blantyre and Balaka. • Timeline summary: o Q3 2021 - Environmental Licence received. o Q2 2022 - Rift Valley Resource

  6. Slide 6: Feasibility Study Results - Summary

    FEASIBILITY STUDY RESULTS - SUMMARY Stage 1 is a technically and economically robust project with significant expansion upside For personal use only NdPr demand growth 15,323 tpa 45 years ~15 months Strong market outlook Concentrate production Stage 1 (current Ore Reserves) FID to first product US$7

  7. Slide 7: Kangankunde Production Summary

    KANGANKUNDE PRODUCTION SUMMARY A world-class resource to produce a high-grade concentrate containing low radionuclides (thorium & uranium) and low acid consuming minerals For personal use only Category Total Ore Reserves (1% TREO cut-off) 23 Mt @ 2.9% TREO TSF ROM Mineral Resource (0.5% TREO cut-off

  8. Slide 8: Feasibility Study Results: Resources and Reserve

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Resources and Reserve 7

  9. Slide 9: Mineral Resources and Ore Reserves

    MINERAL RESOURCES AND ORE RESERVES Mineral Resource Inclusive of Reserves @ 0.5% TREO Cut-off Grade Resource Tonnes TREO NdPr% of Tonnes Classification TREO** Contained (millions) (%) NdPr* (%) For personal use only (millions) Indicated 61 2.43 20.1 0.3 Inferred 200 2.05 20.4 0.8 Total Resource 261

  10. Slide 10: Feasibility Study Results: Mining and Processing

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Mining and Processing 9

  11. Slide 11: Mine Design and Operations

    MINE DESIGN AND OPERATIONS Key points: For personal use only • 6 open pit mining zones. • Annual total material mined 613 kt vs annual ore mined 529 kt. • 19.5 Mt of high-grade feed at 3.1% TREO during early years. • Very low strip ratio (<0.2:1). • Conventional mining equipment. • Low ore loss. • 2

  12. Slide 12: Processing Flowsheet

    PROCESSING FLOWSHEET 3 1 Simple processing operation: For personal use only 2 • Unique mineralogy favourable to REE 4 recovery using mainly physical process of gravity and magnetic separation. 6 • Sulphide flotation on the concentrate 7 stream only, resulting in extremely low reagent consumption. 5

  13. Slide 13: Project Layout

    PROJECT LAYOUT ROM stockpile For personal use only TSF Explosives Concentrate magazine storage Process plant Plant office, lab & maintenance workshops Coreshed Mobile maintenance RWD Contractor workshop laydown area Fuel farm Admin office Weigh bridge 12

  14. Slide 14: Processing Plant

    PROCESSING PLANT Concentrate storage For personal use only 7 Plant office, lab & maintenance workshops MCC Classification 3 4 Gravity separation ROM stockpile 1 2 Grinding 13

  15. Slide 15: Processing Plant

    For personal use only PROCESSING PLANT ROM stockpile Grinding Magnetic separation 2 5 Thickener 8 4 3 Gravity separation Classification 14

  16. Slide 16: Processing Plant

    For personal use only PROCESSING PLANT Site office TSF Process plant 9 Lab Laydown area Maintenance workshops 15

  17. Slide 17: Infrastructure and Workforce

    For personal use only INFRASTRUCTURE AND WORKFORCE Power Water Tailings Other Workforce 3MW power Sourced from Tailings storage Fuel storage and ~200 people during requirement - grid borefields, piping facility and return dispensing. construction; ~110 FTE power connection system to supply water dam

  18. Slide 18: Production Profile

    PRODUCTION PROFILE Stage 1 planned to produce an average annual concentrate of ~15,300tpa with 55% REO grade, delivering ~8,200tpa of REO and 1,610tpa of NdPr For personal use only Years 1 -5 LOM Annual Description Unit Annual Average Average Annual tonnes milled kt 444 451 Production profile – 5 ye

  19. Slide 19: Logistics

    LOGISTICS Excellent transport infrastructure including sealed roads and rail For personal use only • Concentrate product dried to 2% moisture and packed in 1t bulka bags at Kangankunde site. • Bulka bags transported ~110kms by sealed road to Limbe in Blantyre area. • At Limbe, bags loaded into 40 fe

  20. Slide 20: Feasibility Study Results: Capital and Operating Costs

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Capital and Operating Costs 19

  21. Slide 21: Pre-Production Capital Costs

    PRE-PRODUCTION CAPITAL COSTS Robust cost estimation process by subject experts – AACE Class 2 Estimate Cost Category US$M % of total For personal use only DIRECT CAPITAL COST Civil works 4.7 11.9 Tailings storage facility 3.8 9.7 Process plant 18.3 45.7 Power infrastructure 1.1 2.6 Site support and

  22. Slide 22: Pre-Production Capital Costs

    PRE-PRODUCTION CAPITAL COSTS Robust cost estimation process by subject experts – AACE Class 2 Estimate Highlights For personal use only Growth and Civil works contingency • Estimation methods were tailored to each $4.5M (11.3%) $4.7M (11.9%) discipline and aimed at cost and risk reduction. Detailed

  23. Slide 23: Operating Costs

    OPERATING COSTS Ultra low US$2.92/kg REO (FOB) due to favourable project factors For personal use only Plant TREO in Annual Throughput Concentrate Area Cost (US$ % Total Unit Cost Unit Cost 000/y) (US$/t) (US$/kg) Mining 6,530 21 14 0.79 Processing 8,970 29 20 1.09 Maintenance 2,160 7 5 0.26 General

  24. Slide 24: Operating Costs

    OPERATING COSTS Ultra low US$2.92/kg REO (FOB) due to favourable project factors Kangankunde OPEX Favourable factors include: For personal use only US$2.92/kg TREO (FOB) • Conventional mining with a very low strip Royalties Mining ratio of <0.2. • Low distance and downhill ore haulage. Product trans

  25. Slide 25: Global Industry Cost Curve

    GLOBAL INDUSTRY COST CURVE Positioned in lowest cost quartile for rare earths projects globally Source: Project Blue – based on their estimate of MREC equivalent cost 30,000 For personal use only Lindian Resources – Kangankunde (Stage 1) 25,000 20,000 US$/t REO Equiv. 15,000 10,000 5,000 0 0 50,000

  26. Slide 26: Feasibility Study Results: Market and Offtake

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Market and Offtake 25

  27. Slide 27: What Is Driving Rare Earth Demand?

    WHAT IS DRIVING RARE EARTH DEMAND? Global trends will continue to drive NdPr oxide is a critical input for NdFeB magnets demand for rare earths used in wind turbines and electric vehicles For personal use only Source: Project Blue Report 2024 26

  28. Slide 28: NdPr Demand Forecast

    NdPr DEMAND FORECAST It is expected the NdPr market will triple in the period to 2050, requiring an 3x increase of 2023 supply levels For personal use only ~CAGR 13.6% 2023 Global NdPr production ~55 ktpa CAGR 9% Tonne NdPr +2X GROWTH FY2010-FY2020 PROJECT BLUE – PROJECTED MARKET TREND needs an addi

  29. Slide 29: Rare Earths' Market

    RARE EARTHS’ MARKET Price assumptions based on Y1 at US$70/kg NdPr, Y1-5 at US$82/kg NdPr, and LOM at US$109/kg NdPr For personal use only NdPr Pricing US$/kg Right Source: LIN: Project Blue 2024 I CG: Feasibility Cannacord Genuity; report dated 13 March 2024 | MS: Morgan Stanley: report dated 13 Ma

  30. Slide 30: Marketing Strategy

    MARKETING STRATEGY Product Strategy Pricing Strategy For personal use only • Premium Concentrate product • Price premium due to quality • Top quartile REO grade • Lower processing cost due to favourable • Low impurity levels mineralogy • Ultra low radioactivity • Higher payability than average peer

  31. Slide 31: Feasibility Study Results: Financial Evaluation

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Financial Evaluation 30

  32. Slide 32: Financial Evaluation

    FINANCIAL EVALUATION Outstanding financial metrics Profitable at current low prices For personal use only Years LOM LOM Years 1-5 LOM Financial metric Unit 1 to 5 Unit Spot Price US$ A$ (average) (average) US$ Average annual revenue $M 81.1 113.7 170.3 Average US$/kg 50 82 109 Price NdPr Average ope

  33. Slide 33: Financial Evaluation - Sensitivities

    FINANCIAL EVALUATION - SENSITIVITIES Robust project economics continue to deliver positive NPV results in various risk scenarios For personal use only Pre-Tax NPV (Base Case Pre-Tax LOM NPV @ 8% ~US$794M) Sensitivity to Key Variables ASX: LIN 32

  34. Slide 34: Financing Status – Next 18 Months

    FINANCING STATUS – NEXT 18-MONTHS Potential uses of funds next 18-months Funding solutions being of US$60M-$70M progressed For personal use only Vendor payment (at first commercial production - late 2025) • Several positive discussions underway in recent months. • Parties engaged include constructio

  35. Slide 35: Feasibility Study Results: Development Schedule

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Development Schedule 34

  36. Slide 36: Indicative Development Timeline

    INDICATIVE DEVELOPMENT TIMELINE Estimated 15-months from funding confirmation to first product on ship For personal use only Calendar Year 2024 2025 2026 Quarter Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Feasibility Study complete Engineering design Funding confirmation Civil works contract award Enabling works/bu

  37. Slide 37: Feasibility Study Results: Environment and Community

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Environment and Community 36

  38. Slide 38: Operating Sustainably

    OPERATING SUSTAINABLY Keeping everyone Safe For personal use only Supporting Community Respecting Culture Being Responsible and ethical Strong Governance Looking after Environment 37

  39. Slide 39: Working with Community

    WORKING WITH COMMUNITY Community engagement For personal use only • Long-standing relationship with local communities. • Community members’ resettlement process. • Community Engagement Plan developed with and strongly endorsed by community. • Establishment of community committee with Lindian and gov

  40. Slide 40: Environment and Licences

    ENVIRONMENT AND LICENCES Low environmental impact and radiation, fully permitted to commence construction and operations For personal use only Environmental and Social Radiation management Impact Assessment (ESIA) • Ore contains low Th (50ppm) • ESIA completed and approved and U (5ppm). Product by M

  41. Slide 41: Feasibility Study Results: Risks and Opportunities

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Risks and Opportunities 40

  42. Slide 42: Kangankunde - Risks and Opportunities

    KANGANKUNDE - RISKS AND OPPORTUNITIES RISKS OPPORTUNITIES For personal use only Area Risk Description Area Opportunity Approvals Delays in approvals to commence Ore Reserves The current Mineral Resource includes 61Mt of construction. Indicated Resource, with only 23.7Mt converted to Ore Reserves. Ta

  43. Slide 43: Feasibility Study Results: Conclusion

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Conclusion 42

  44. Slide 44: Outstanding Feasibility Results

    OUTSTANDING FEASIBILITY RESULTS 1 2 3 CRUCIAL TO SUPERIOR LOW For personal use only Global Tier 1 Asset Capex & Supply Opex • Massive Resource • Growing market • CAPEX US$40M • High REO content • Low-cost NdPr supply • OPEX – US$2.92/kg TREO • Low radionuclides and low • Profitable operation even at

  45. Slide 45: Feasibility Study Results: End

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS End 44

  46. Slide 46: Contact

    CONTACT Alwyn Vorster For personal use only CHIEF EXECUTIVE OFFICER E - info@lindianresources.com.au Linda Gimondo MANAGER CORPORATE AFFAIRS E - Linda.gimondo@lindianresources.com.au Lindianresources.com.au | + 61 8 6557 8838 | Level 24, 108 St Georges Terrace, Perth FOLLOW US 45 45

  47. Slide 47: Feasibility Study Results: Appendices

    For personal use only KANGANKUNDE PROJECT FEASIBILITY STUDY RESULTS Appendices 46

  48. Slide 48: Corporate Information

    CORPORATE INFORMATION Company ASX Code LIN Substantial Shareholders3 Share Price ~A$0.16 Kabunga Holdings Pty Ltd 10.9% For personal use only Ordinary Shares on Issue 1.153B Bonacare Pty Ltd / Topwei Pty Ltd / Wei 9.97% Performance Rights 23.3M & Zhang Options on Issue: (Conversion value A$20.5M) ~8

  49. Slide 49: Experienced Leadership Team

    EXPERIENCED LEADERSHIP TEAM Board Executive Leadership Team For personal use only ASX: LIN 48

  50. Slide 50: Feasibility Study - Key Contributors

    For personal use only FEASIBILITY STUDY - KEY CONTRIBUTORS ASX: LIN 49

  51. Slide 51: Bios of FS Contributors and Lindian Corporate Structure

    BIOS OF FS LINDIAN CORPORATE CONTRIBUTORS STRUCTURE Lindian Resources Limited For personal use only AUSTRALIA 100% Lindian Rare Earths Limited UNITED KINGDOM 66% 100% Rift Valley Resource Lindian Mining Developments Limited Services Limited MALAWI MALAWI Mining and exploration licences; environmenta

  52. Slide 52: Kangankunde Mineral Resource Estimate

    KANGANKUNDE MINERAL RESOURCE ESTIMATE Table 1: Kangankunde Rare Earths Mineral Resource (at 0.5% TREO cut-off) Tonnes La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 Class (Mt) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm

  53. Slide 53: Concentrate – Typical Product Specs

    CONCENTRATE – TYPICAL PRODUCT SPECS Typical expected average REO 55%; Typical expected average NdPr 19.5%; Low U, Th and sulphides For personal use only REO La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 % 28.8 50.30 4.85 14.5 0.90 0.15 0.25 0.02 0.05 0.01 0

  54. Slide 54: July 2024

    Corporate Presentation For personal use only 9 July 2024 ASX:LIN OTCQB:LINIF

  55. Slide 55: Important Information: Disclaimer

    IMPORTANT INFORMATION Disclaimer The material in this presentation has been prepared by Lindian Resources Limited (“Company”). For personal use only This presentation may not be reproduced, redistributed or passed on, directly or indirectly, to any other person, or published, in whole or in part, fo

  56. Slide 56: Overview

    For personal use only Overview 3

  57. Slide 57: Corporate Information

    CORPORATE INFORMATION Company ASX Code LIN Substantial Shareholders3 Share Price ~A$0.16 Kabunga Holdings Pty Ltd 10.9% For personal use only Ordinary Shares on Issue 1.153B Bonacare Pty Ltd / Topwei Pty Ltd / Wei 9.97% Performance Rights 23.3M & Zhang Options on Issue: (Conversion value A$20.5M) ~8

  58. Slide 58: Lindian Project Locations

    For personal use only LINDIAN PROJECT LOCATIONS • Rare Earths: World class Kangankunde Project in Malawi. • Bauxite: Three projects in Guinea. • Bauxite: Early stage project in Tanzania. • Head Office: Perth, Western Australia. ASX: LIN 5

  59. Slide 59: Kangankunde Rare Earths Project

    For personal use only Kangankunde Rare Earths Project 6

  60. Slide 60: Kangankunde Location and Background

    KANGANKUNDE LOCATION AND BACKGROUND • Malawi is a stable jurisdiction with English Law and a democratically elected government. For personal use only • Kangankunde is in proximity to Blantyre and Balaka. • Timeline summary: o Q3 2021 - Environmental Licence received. o Q2 2022 - Rift Valley Resource

  61. Slide 61: Feasibility Study Results - Summary

    FEASIBILITY STUDY RESULTS - SUMMARY Stage 1 is a technically and economically robust project with significant expansion upside For personal use only NdPr demand growth 15,323 tpa 45 years ~15 months Strong market outlook Concentrate production Stage 1 (current Ore Reserves) FID to first product US$7

  62. Slide 62: Kangankunde Production Summary

    KANGANKUNDE PRODUCTION SUMMARY A world-class resource to produce a high-grade concentrate containing low radionuclides (thorium & uranium) and low acid consuming minerals For personal use only Category Total Ore Reserves (1% TREO cut-off) 23 Mt @ 2.9% TREO TSF ROM Mineral Resource (0.5% TREO cut-off

  63. Slide 63: Mine Design and Operations

    MINE DESIGN AND OPERATIONS Key points: For personal use only • 6 open pit mining zones. • Annual total material mined 613 kt vs annual ore mined 529 kt. • 19.5 Mt of high-grade feed at 3.1% TREO during early years. • Very low strip ratio (<0.2:1). • Conventional mining equipment. • Low ore loss. • 2

  64. Slide 64: Processing Plant

    PROCESSING PLANT Simple processing operation: For personal use only • Unique mineralogy favourable to REE recovery using mainly physical process of gravity and Grinding ROM stockpile magnetic separation. Magnetic separation • Sulphide flotation on the Thickener concentrate stream only, resulting in

  65. Slide 65: Infrastructure and Workforce

    For personal use only INFRASTRUCTURE AND WORKFORCE Power Water Tailings Other Workforce 3MW power Sourced from Tailings storage Fuel storage and ~200 people during requirement - grid borefields, piping facility and return dispensing. construction; ~110 FTE power connection system to supply water dam

  66. Slide 66: Logistics

    LOGISTICS Excellent transport infrastructure including sealed roads and rail For personal use only • Concentrate product dried to 2% moisture and packed in 1t bulka bags at Kangankunde site. • Bulka bags transported ~110kms by sealed road to Limbe in Blantyre area. • At Limbe, bags loaded into 40 fe

  67. Slide 67: Pre-Production Capital Costs

    PRE-PRODUCTION CAPITAL COSTS Robust cost estimation process by subject experts – AACE Class 2 Estimate Cost Category US$M % of total For personal use only Key Points DIRECT CAPITAL COST • Tenderers selected based on local availability Civil works 4.7 11.9 and design and construction expertise. Taili

  68. Slide 68: Operating Costs

    OPERATING COSTS Ultra low US$2.92/kg REO (FOB) and US$3.71/kg AISC CIF due to favourable project factors For personal use only Favourable factors include: TREO in Concentrate • Conventional mining with a very low strip ratio Annual Cost Area % Total Unit Cost of <0.2. (US$ 000/y) (US$/kg) AISC CIF •

  69. Slide 69: Global Industry Cost Curve

    GLOBAL INDUSTRY COST CURVE Positioned in lowest cost quartile for rare earths projects globally Source: Project Blue – based on their estimate of MREC equivalent cost 30,000 For personal use only Lindian Resources – Kangankunde (Stage 1) 25,000 20,000 US$/t REO Equiv. 15,000 10,000 5,000 0 0 50,000

  70. Slide 70: What Is Driving Rare Earth Demand?

    WHAT IS DRIVING RARE EARTH DEMAND? Global trends will continue to NdPr oxide is a critical input for NdFeB drive demand for rare earths magnets used in wind turbines and electric vehicles For personal use only Source: Project Blue Report 2024 17

  71. Slide 71: NdPr Demand Forecast

    NdPr DEMAND FORECAST It is expected the NdPr market will triple in the period to 2050, requiring an 3x increase of 2023 supply levels For personal use only ~CAGR 13.6% 2023 Global NdPr production ~55 ktpa CAGR 9% Tonne NdPr +2X GROWTH FY2010-FY2020 PROJECT BLUE – PROJECTED MARKET TREND needs an addi

  72. Slide 72: Rare Earths' Market

    RARE EARTHS’ MARKET Price assumptions based on Y1 at US$70/kg NdPr, Y1-5 at US$82/kg NdPr, and LOM at US$109/kg NdPr For personal use only NdPr Pricing US$/kg Right Source: LIN: Project Blue 2024 I CG: Feasibility Cannacord Genuity; report dated 13 March 2024 | MS: Morgan Stanley: report dated 13 Ma

  73. Slide 73: Marketing Strategy

    MARKETING STRATEGY Product Strategy Pricing Strategy For personal use only • Premium concentrate product • Price premium due to quality • Top quartile REO grade • Lower processing cost due to favourable • Low impurity levels mineralogy • Ultra low radioactivity • Higher payability than average peer

  74. Slide 74: Financial Evaluation

    FINANCIAL EVALUATION Outstanding financial metrics Profitable at current low prices For personal use only Years LOM LOM Years 1-5 LOM Financial metric Unit 1 to 5 Unit Spot Price US$ A$ (average) (average) US$ Average annual revenue $M 81.1 113.7 170.3 Average US$/kg 50 82 109 Price NdPr Average ope

  75. Slide 75: Financial Evaluation - Sensitivities

    FINANCIAL EVALUATION - SENSITIVITIES Robust project economics continue to deliver positive NPV results in various risk scenarios For personal use only Pre-Tax NPV (Base Case Pre-Tax LOM NPV @ 8% ~US$794M) Sensitivity to Key Variables ASX: LIN 22

  76. Slide 76: Financing Status – Next 18 Months

    FINANCING STATUS – NEXT 18-MONTHS Potential uses of funds next 18-months Funding solutions being of US$60M-$70M progressed For personal use only Vendor payment (at first commercial production - late 2025) • Several positive discussions underway in recent months. • Parties engaged include constructio

  77. Slide 77: Indicative Development Timeline

    INDICATIVE DEVELOPMENT TIMELINE Estimated 15-months from funding confirmation to first product on ship For personal use only Calendar Year 2024 2025 2026 Quarter Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Feasibility Study complete Engineering design Funding confirmation Civil works contract award Enabling works/bu

  78. Slide 78: Operating Sustainably

    OPERATING SUSTAINABLY Keeping everyone Safe For personal use only Supporting Community Respecting Culture Being Responsible and ethical Strong Governance Looking after Environment 25

  79. Slide 79: Working with Community

    WORKING WITH COMMUNITY Community engagement For personal use only • Long-standing relationship with local communities. • Community members’ resettlement process. • Community Engagement Plan developed with and strongly endorsed by community. • Establishment of community committee with Lindian and gov

  80. Slide 80: Environment and Licences

    ENVIRONMENT AND LICENCES Low environmental impact and radiation, fully permitted to commence construction and operations For personal use only Environmental and Social Radiation management Impact Assessment (ESIA) • Ore contains low Th (50ppm) • ESIA completed and approved and U (6ppm). by Malawi Go

  81. Slide 81: Outstanding Feasibility Results

    OUTSTANDING FEASIBILITY RESULTS 1 2 3 CRUCIAL TO SUPERIOR LOW For personal use only Global Tier 1 Asset Capex & Supply Opex • Massive Resource • Growing market • CAPEX US$40M • High REO content • Low-cost NdPr supply • OPEX – US$2.92/kg TREO • Low radionuclides and low • Profitable operation even at

  82. Slide 82: Bauxite Projects

    For personal use only Bauxite Projects 29

  83. Slide 83: Bauxite – Three Stages to Aluminium Production

    BAUXITE – THREE STAGES TO ALUMINIUM PRODUCTION STAGE 1 BAUXITE MINING STAGE 2 ALUMINA PRODUCTION STAGE 3 ALUMINIUM PRODUCTION For personal use only Primary source is bauxite Bauxite is processed into Then through the process alumina of electrolysis, alumina is turned into aluminium 4-5 tonnes 2 tonn

  84. Slide 84: Bauxite Market for EVs

    BAUXITE MARKET FOR EVS World Bauxite demand for EVs For personal use only Global EV car sales vs aluminium demand Wood Mackenzie : 2024 Outlook aluminium demand for EVs to reach over 4.5 million tonnes (~20Mt Bauxite) EV’s have >50% Aluminium: a critical raw material (CRM) essential to EV energy eff

  85. Slide 85: Bauxite Projects - Overview

    BAUXITE PROJECTS - OVERVIEW • Lindian’s bauxite projects have a combined 1Bt For personal use only JORC resource1. • Guinea export capacity has increased by 500% from approx. 20Mt per year in 2015 to >100Mt per year in 2022. • Guinea bauxite production is increasing year- on-year currently at ~40Mt

  86. Slide 86: Gaoual Project

    For personal use only GAOUAL PROJECT • Very high-grade, low silica Resources Cut-off Grade Grade (screening studies), close to Category (Mt) (AI2O3 %) (AI2O3 %) (SiO2 %) infrastructure located approximately 60km to CBG High Grade 83.8 45 51.2 11.0% Indicated Resources railhead. Total 101.5 40 49.8 1

  87. Slide 87: Lelouma Project

    LELOUMA PROJECT High grade, low silica large resource Cut-off Mineral Resource Tonnes For personal use only AI2O3 (%) SiO2 (%) Criteria Category (Mt) >40% AI2O3 Measured 155 47.9 1.8 <10% SiO2 Indicated 743 44.4 2.1 >1m Thick Measured + Indicated 898 45.0 2.1 <1 Strip ratio Inferred 2 42.9 2.8 (wast

  88. Slide 88: Woula Project

    WOULA PROJECT Supplementary feed asset close to infrastructure For personal use only Mineral Cut-off Criteria Tonnes AI2O3 SiO2 Resource >40% AI2O3 Inferred 19 41.7 3.2 10% SiO2/>1m Thick / <1 strip ratio (waste:ore Total 19 41.7 3.2 thickness) 1. For all resource statements refer Competent Persons

  89. Slide 89: Conclusions

    For personal use only CONCLUSIONS 36

  90. Slide 90: Why Invest in Lindian?

    WHY INVEST IN LINDIAN? Rare Earths: Kangankunde - Malawi For personal use only • Global tier one rare earths asset. • Mining-friendly jurisdiction. • Low cost Stage 1 project. • Significant Stage 2 expansion potential. • Robust Stage 1 project economics. • Short term path to production. Bauxite: Gui

  91. Slide 91: End

    For personal use only End 38

  92. Slide 92: Contact

    CONTACT Alwyn Vorster For personal use only CHIEF EXECUTIVE OFFICER E - info@lindianresources.com.au Linda Gimondo MANAGER CORPORATE AFFAIRS E - Linda.gimondo@lindianresources.com.au Lindianresources.com.au | + 61 8 6557 8838 | Level 24, 108 St Georges Terrace, Perth FOLLOW US 39 39

  93. Slide 93: Appendices

    For personal use only Appendices 40

  94. Slide 94: Experienced Leadership Team

    EXPERIENCED LEADERSHIP TEAM Board Executive Leadership Team For personal use only ASX: LIN 41

  95. Slide 95: Competent Persons' Statements

    COMPETENT PERSONS' STATEMENTS The information in this presentation that relates to Exploration Results, The information in this presentation that relates to the Ore Reserve for the Metallurgy Results, and Mineral Resources of the Kangankunde Rare Earths Kangankunde project is based on and fairly rep

  96. Slide 96: Kangankunde - Resources & Reserves

    KANGANKUNDE - RESOURCES & RESERVES Mineral Resource Inclusive of Reserves @ 0.5% TREO Cut-off Grade Resource Tonnes TREO NdPr% of Tonnes Classification TREO** Contained (millions) (%) NdPr* (%) For personal use only (millions) Indicated 61 2.43 20.1 0.3 Inferred 200 2.05 20.4 0.8 Total Resource 261

  97. Slide 97: Kangankunde - Risks and Opportunities

    KANGANKUNDE - RISKS AND OPPORTUNITIES RISKS OPPORTUNITIES For personal use only Area Risk Description Area Opportunity Approvals Delays in approvals to commence Ore Reserves The current Mineral Resource includes 61Mt of construction. Indicated Resource, with only 23.7Mt converted to Ore Reserves. Ta