Energy Resources of Australia Ltd. Class A · ASX:ERA
Energy Resources of Australia Ltd. Class A — Corporate Update (August 2015)
22 slides from Energy Resources of Australia Ltd. Class A's corporate update, Aug 27, 2015
Slide 1: Rehabilitation Management
Rehabilitation Management Andrea Sutton | Chief Executive | 27 August 2015 www.energyres.com.au
Slide 2: Forward-looking statements
Forward-looking statements This presentation has been prepared by Energy Resources of Australia Ltd (“ERA”) and consists of the slides for a presentation concerning ERA. By reviewing/attending this presentation you agree to be bound by the following conditions. Forward-looking statements This presen
Slide 3: Acknowledgement of Traditional Owners
Acknowledgement of Traditional Owners The operations of Energy Resources of Australia Ltd (ERA) are located on Aboriginal land and are surrounded by, but separate from, Kakadu National Park ERA respectfully acknowledges the Mirarr, Traditional Owners of the land on which the Ranger mine is situated
Slide 4: Agenda
Agenda • Ranger history • Progressive rehabilitation overview – Jabiluka – Pit 1 – Pit 3 – Tailings Storage Facility – Water Management • Stakeholder engagement • Rehabilitation milestones 4 www.energyres.com.au
Slide 5: Ranger Project Area
Ranger Project Area 5 www.energyres.com.au
Slide 6: Commitment to progressive rehabilitation
Commitment to progressive rehabilitation • Ranger is one of the most regulated mines in Australia • The Ranger mine operates under the Atomic Energy Act 1953 (Cth) • Stringent environmental requirements are prescribed • Two open cut mines – Pit 1 and Pit 3 currently undergoing rehabilitation • Appro
Slide 7: Rehabilitation of Jabiluka
Rehabilitation of Jabiluka 7 www.energyres.com.au
Slide 8: Jabiluka before and after rehabilitation
Jabiluka before and after rehabilitation Jabiluka pre rehabilitation 2000 Jabiluka revegetation 2015 • Rehabilitation work at Jabiluka began in 2003 • Infrastructure was removed and the box-cut and decline were backfilled • Revegetation of disturbed areas began in 2005 with the planting of 7,560 loc
Slide 9: Jabiluka revegetation
Jabiluka revegetation • 8,600 saplings planted in 3 further stages between 2013 and 2015 • Traditional Owners consulted on native species, density and landforms • 5 ERA Indigenous trainees and 8 Indigenous workers from Kakadu Native Plants were involved in the planting of saplings • Seeds from nativ
Slide 10: Jabiluka revegetation progress
Jabiluka revegetation progress 2011 2013 2015 10 www.energyres.com.au
Slide 11: Rehabilitation of Pit 1
Rehabilitation of Pit 1 11 www.energyres.com.au
Slide 12: Rehabilitation of Pit 1
Rehabilitation of Pit 1 • Mining ceased in Pit 1 in 1994 • Tailings deposition commenced in 1996 and ceased in 2008 • 7,700 prefabricated vertical drains (wicks) installed in Pit 1 to improve water drainage and accelerate consolidation of tailings • Geotextile layers placed over exposed tailings to
Slide 13: Preparing for Pit 1 revegetation
Preparing for Pit 1 revegetation • 30 years of dedicated research and revegetation trials on closure • Revegetation trials have been ongoing using field testing and theoretical modelling to create optimal closure strategy • Revegetation trials on 8 hectares of waste rock began in 2008 and fauna is c
Slide 14: Rehabilitation of Pit 3
Rehabilitation of Pit 3 14 www.energyres.com.au
Slide 15: Innovation in Rehabilitation of Pit 3
Innovation in Rehabilitation of Pit 3 • Mining ceased in November 2012 • 31 million tonnes of waste rock placed into void followed by mill tailings • Innovative approach to backfilling Pit 3, engineered layers and drainage system created to maximise tailings consolidation and also enable brine stora
Slide 16: Proposed Pit 3 Backfill Plan
Proposed Pit 3 Backfill Plan The current rehabilitation plan for Pit 3 includes: • 31 million tonnes low grade ore placed (completed December 2012 to August 2014) • Approximately 41 million tonnes tailings: Mill (14Mt), Tailings Storage Facility (27Mt) • Approximately 62 million tonnes waste rock pl
Slide 17: Tailings Storage Facility
Tailings Storage Facility 17 www.energyres.com.au
Slide 18: Tailings Storage Facility Management
Tailings Storage Facility Management • 27 metre stainless steel purpose built dredge and maintenance craft were launched in August 2015 • Dredging of approximately 27 million tonnes of tailings for reclamation and final deposition into Pit 3 • Dredging of Tailings Storage Facility is expected to tak
Slide 19: Water Management
Water Management 19 www.energyres.com.au
Slide 20: Water Management
Water Management • Brine concentrator treats process water to produce a distillate (clean water) and a brine (concentrated waste stream) • Distilled water is discharged to the environment during the wet season • Brine will be injected for permanent containment in the bottom of Pit 3 Brine concentrat
Slide 21: Stakeholder engagement
Stakeholder engagement • The Supervising Scientist provides independent oversight of the Ranger operations. • The Supervising Scientist continues to report in its Annual Report that its monitoring and research projects confirm “that the environment has remained protected” • The Environmental Researc
Slide 22: Milestones Achieved in Rehabilitation
Milestones Achieved in Rehabilitation • Jabiluka – Rehabilitation at Jabiluka and comprehensive revegetation programme • Pit 1 – Completed pre-load capping – Final landform to be constructed • Pit 3 and Tailings Storage Facility – Completed underfill Pit 1, 2000 – Completed under drain – Completed b