  1. Slide 1: Analyst trip to Chile - CEO Presentation

    Analyst trip to Chile - CEO Presentation 13 16 December 2010

  2. Slide 2: Index

    Index I. Strategic Plan 2009 - 2015 II. Market 1. Refined Copper 2. Copper Concentrate 3. Gold 4. Molybdenum III. Production & Financial Performance IV. Challenges 2011 1. Michilla 2. Antucoya 3. Sierra Gorda District 4. Nokomis 5. Reko Diq V. Exploration VI. Conclusion 2

  3. Slide 3: I. Strategic Plan 2009 - 2015

    ANTOFAGASTA @ PLC I. Strategic Plan 2009 - 2015

  4. Slide 4: Delivering on strategy for profitability and growth

    Delivering on strategy for profitability and growth Strategic Plan 2009 - 2015 Major copper producer with existing low-cost operating base in Chile 3. Growth beyond the Core Business Copper production to increase nearly 60% from 2009 to 2. Organic & sustainable growth of 2011e, providing low cost an

  5. Slide 5: II. Market

    ANTOFAGASTA @ PLC ll. Market

  6. Slide 6: Refined copper market

    Refined copper market Continued strength in copper demand to date in 2010 Copper price and exchange inventories Clear trend since March in the reduction in visible inventories by 158k to date 35 2010 400 R unning 30 A verag e 350 Chinese total copper imports at similar E xch an g e in v en to ries (

  7. Slide 7: Copper concentrates market

    Copper concentrates market Fundamentals remain unchanged, with the concentrates market in continued deficit Market balance and terms Further increase in smelter capacity announced in China and India 40 Market balance ('000 tonnes contained Cu) 30 Mid-year benchmark at record low 700 20 (Combined dis

  8. Slide 8: Molybdenum market

    Molybdenum market Molybdenum price and market balance Market fundamentals remain strong driven by recovery in the stainless steel market 60 40 Market balance (m lbs) 35 China remains a net importer, though not 50 Nominal price (US$/lb) at the exceptional levels of 2009 30 Market balance (m lbs) 40 2

  9. Slide 9: Gold market

    Gold market Growing demand from investors as US dollar weakens Central banks in emerging countries growing gold Gold price and 10Y TIP positions to diversify from weakening US dollar. In developed countries, net sales from central banks are over 1500 0,0 Gold (left) 10Y TIP (right, inverted) Retail

  10. Slide 10: III. Production & Financial Performance

    III. Production & Financial Performance

  11. Slide 11: Production profile of the Core Business

    Production profile of the Core Business (1) 707 Total: 442,500 tonnes 530 Los Pelambres 478 311.6K 465 442 428 El Tesoro 90.2K Michilla 40.6K 2006 2007 2008 2009 2010E 2011E-2015E annual average (1) Represents production from Los Pelambres, El Tesoro and Michilla up to 2010 and includes Esperanza fr

  12. Slide 12: Cash cost profile

    Cash cost profile 2009 copper cost curve (Ranked by C1) Realised copper price and cash cost 350 300 330 327 302 250 267 271 Cost (c/lb Paid Cu) 200 185 150 129 120 127 Antofagasta 111 100 96 85 92 50 87 96 40 32 Source: Brook Hunt, a Wood MacKenzie company 14 0 - 2,000 4,000 6,000 8,000 10,000 12,00

  13. Slide 13: Financial performance

    Financial performance Turnover (US$m), EBITDA (US$m) and EBITDA margin (%) 7.000 76% 74% 6.000 68% 62% 5.000 56% 57% 3,870 3,827 4.000 3,373 3,169 2,957 2,824 2,963 3.000 2,445 1,900 1,957 2.000 1,674 1,681 1.000 0 2005 2006 2007 2008 2009 YTD Sep-10 Turnover (US$m) EBITDA (US$m) EBITDA/Turnover (%)

  14. Slide 14: IV. Challenges 2011

    ANTOFAGASTA @ PLC IV. Challenges 2011

  15. Slide 15: Michilla

    Michilla 2010e production of 40,000 tonnes, similar to 2009, and 2010e cash costs of approximately 180 cents Recategorization of reserves and engineering plan expected to extend the base case until 2015 Exploration plan to extend the mine life to 2018 15

  16. Slide 16: Antucoya

    Antucoya !. Resources of 1.5 billion tonnes @ 0.27% copper .! Oficina Maria Elena !. Michilla .! Oficina !. Pedro !. de Valdivia Feasibility study for stand-alone project expected to be !. ! .! !. Antucoya completed by mid-2011 !. !. !. Potential SX-EW operation: Mejillones !. !. .! !. Estimated pro

  17. Slide 17: Sierra Gorda District

    Sierra Gorda District Mineral resource estimates completed at Télegrafo and Caracoles following successful exploration Combined estimate of 3.7 billion tonnes at 0.40% Sierra Gorda Tesoro Mirador copper, with gold and molybdenum credits Esperanza Telégrafo Represents a 25% increase on 2009 Group ton

  18. Slide 18: Nokomis copper-nickel-platinum deposit

    Nokomis copper-nickel-platinum deposit Definitive agreement in July 2010 with Duluth Metals to acquire an interest in Nokomis, a base Nokomis and precious metals project located in NE Minnesota, creating the JV company Twin Metals Minnesota 7% interest in Duluth Metals shares acquired Initial 40% in

  19. Slide 19: Reko Diq copper gold project

    Reko Diq copper gold project 37.5% effective interest in joint venture with Barrick Gold Corporation and Government of Baluchistan 2009 resource estimate of 5.9 billion tonnes (at interest is 2.2 billion tonnes) Work on feasibility, environmental and social studies completed. Feasibility study submi

  20. Slide 20: V. Exploration

    ANTOFAGASTA @ PLC V. Exploration

  21. Slide 21: Geographical locations

    Geographical locations USA Exploration Pyramid Agreement with Fullmetals Minerals Ltd. United Kingdom: Registered office, London Eritrea Exploration USA Exploration Asmara: Agreement with Spain Exploration Sunridge Gold Corp Nokomis: Agreement with Duluth Metals Ltd. La Zarza: Agreement with Ormonde

  22. Slide 22: Exploration and future potential

    Exploration and future potential Active exploration and evaluation programme in Chile and abroad, with US$39 million* spent in 2010 H1 Grassroots exploration in Chile, in addition to Core Business areas, both directly and through earn-ins Expanding portfolio of early-stage international interests Eu

  23. Slide 23: VI. Conclusion

    ANTOFAGASTA @ PLC Vi. Conclusion

  24. Slide 24: Conclusion

    Conclusion Significant producer of copper and molybdenum, with increased gold exposure from 2011 Esperanza start up and Completion Testing should be completed in 2011 Feasibility study for Antucoya stand-alone project expected to be completed by mid-2011 Pre-stripping at Mirador is expected to be co

  25. Slide 25: Analyst trip to Chile - Esperanza Copper, Gold Project

    Analyst trip to Chile - Esperanza Copper, Gold Project 13 December 2010

  26. Slide 26: Contents

    Contents Company overview the Esperanza copper-gold project Project status major achievements Future development significant growth potential

  27. Slide 27: Company overview

    Company overview Esperanza Copper Gold Project December 2010

  28. Slide 28: Minera Esperanza

    Minera Esperanza Esperanza is a greenfield copper-gold project located 30 km (19 mi) region. During its first 10 years of operation, Esperanza is expected to produce over 191.000 tonnes of copper in concentrate annually, and over construction was initiated in mid-2008, and start-up of commercial ope

  29. Slide 29: Sustainability and innovation

    Sustainability and innovation Sustainability a key concept since the earliest stages of the project One of the most relevant elements of the project is the exclusive use of sea water in all of its process. Water will be pumped through a 145 km (90 mi) pipeline running from the Pacific coast to the p

  30. Slide 30: History highlights

    History highlights Antofagasta Minerals acquires the mining 1993 property from Anglo American Discovery and exploration of an important Cu/Au 1999 porphyry deposit 2004 Pre-feasibility and feasibility study 2005 2006 Antofagasta Minerals approves the development of the project 2007 EIA approved Cons

  31. Slide 31: Project status

    Project status Esperanza Copper Gold Project December 2010

  32. Slide 32: Project highlights

    Project highlights Pre-stripping completed Commissioning activities underway Outstanding safety record Excellent labor relations Full compliance with environmental and social commitments First concentrate production expected in December 2010

  33. Slide 33: Esperanza site overview

    Esperanza site overview Mine area ◄ Primary crusher ◄ Overland conveyor belt Truck shop ► Camp & office facilities Plant area Thickened tailings deposit

  34. Slide 34: Pre-stripping completed

    Pre-stripping completed in a shorter term, with significant savings, and without LTA* Completed 154.4 Mton * LTA = Lost Time Accidents July 21, 2010

  35. Slide 35: Dry area

    Dry area Crusher Conveyor Belt Stockpile Stockpile Nov 30, 2010 236 kton (100%) 0.61% CuT 0.37 g/t Au

  36. Slide 36: Grinding

    Grinding SAG & Ball Mills eo

  37. Slide 37: Flotation

    Flotation

  38. Slide 38: Tailing thickeners

    Tailing thickeners ANTOFAGASTA PLC

  39. Slide 39: Water & concentrate transport

    Water & concentrate transport Sea water flow Pumping station #3

  40. Slide 40: Port (onshore facilities)

    Port (onshore facilities) Concentrate thickener Concentrate storage bldg. Filter plant Emergency pond

  41. Slide 41: Port (offshore facilities)

    Port (offshore facilities) Sa | wv, @ Ao

  42. Slide 42: Power lines

    Power lines S/E Encuentro Substations (S/E) Pumping Stations (EB) Cities EB 2 1x23 kV line EB 1 EB 3 18 km ESPERANZA PORT S/E El Tesoro 1x110 kV line 105 km EB 4 S/E Esperanza 1x220 kV line 12 km S/E Chacaya 2x220 kV line 82 km S/E Laberinto S/E El Cobre

  43. Slide 43: Outstanding safety record

    Outstanding safety record Over 37 million continuous man-hours of work to date. 6,0 Frequency Rate (FR) Number of LTA / million man-hours worked Peak manpower of 13.000 people including 5,0 4,9 = Industry Average (2008-2009) company personnel and contractors. 4,0 Low Frequency Rate and Severity Inde

  44. Slide 44: Labor relations creating opportunities

    Labor relations creating opportunities Excellent labor relations both with employees and contractor workers. High rate of local employees (60%). High rate of female employees (14%). Extensive apprenticeship program responds to community requests identified during EIA.

  45. Slide 45: Building a strong and dedicated workforce

    Apprenticeship program for mine & plant operators and maintenance personnel Mine Plant Apprentices trained 159 Apprentices trained 65 Currently training 48 Currently training n/a % local apprentices 88% % local apprentices 100% % female apprentices 19% % female apprentices 9% “Building a strong and

  46. Slide 46: Esperanza funding structure

    Esperanza funding structure Shareholders Sponsors 70% 30% Shareholder Funding Banks Lenders US$ 2.5 bn Senior Loan ECAs US$ 1.05 bn

  47. Slide 47: Awards

    Awards Avonni 2009, awarded by Foro Special Honor, Benjamín Teplizky Award Best Peer Health and Safety Committee Innovación, TVN, El Mercurio, Ministry August 2009 August 2009 of Economy, and the CPC. Project Finance International “Mining Deal of the Year” (Jan 2010) Best Work Practices Program Proj

  48. Slide 48: Future development

    Future development Esperanza Copper Gold Project December 2010

  49. Slide 49: Substantial growth opportunities

    Substantial growth opportunities Extensive geological resource base. Positive metallurgical Mo testwork results. Good Mo recovery (70%) Good Mo concentrate grades (50%) Commercially acceptable product Esperanza Telégrafo 0.20 – 0.35 CuEq (%) 0.35 – 0.50 CuEq (%) > 0.50 CuEq (%)

  50. Slide 50: Analyst trip to Chile - Minera Los Pelambres

    Analyst trip to Chile - Minera Los Pelambres 13 December 2010

  51. Slide 51: Table of Contents

    Table of Contents The Company New Strategy Performance

  52. Slide 52: Location

    Location Minera Minera El Tesoro Michilla Minera Esperanza Minera Los Pelambres

  53. Slide 53: Operational Process

    Operational Process Crushing Two primary Conveyor Mine crushers Tunnel Plant 12.6 km 175 ktpd Tailings Pipeline Concentrate 50 km Pipeline 120 km Mauro Quillayes Tailings Dam Tailings Dam Port 1,700 million ton 380 million ton Reclaim Water Pipeline 60 km (900 L/s)

  54. Slide 54: Ownership

    Ownership United Kingdom Chile Japan 60% 5% Mitsubishi Corp. 10% Mitsubishi Materials 15% Nippon Mining 8.75% Marubeni Antofagasta plc 1.25% Mitsui

  55. Slide 55: Table of Contents

    Table of Contents The Company New Strategy Performance

  56. Slide 56: To face its new challenges, the company proposes a new target

    To face its new challenges, the company proposes to adopt a new target Target function Value Add sustainable value Add economic value EVA Production and cash cost (C1) 1990 2000 Today 2020 The environmental and social dimensions are now part of the target function

  57. Slide 57: MLP as a system recognizing stakeholder contributions

    …which considers MLP as a system that must recognize the contribution of its stakeholders to generate value Shareholders Communications Contractor Companies Media / Suppliers Government NGOs Employees Collaborators Academic World Communities Trade Clients Organizations Recognizing the contributions

  58. Slide 58: Mission of MLP

    Mission of MLP ADDING SUSTAINABLE VALUE MAKING RESOURCES FEASIBLE EXCELLENCE IN WHAT WE DO EFFECTIVE ORGANIZATION RELATIONS FOR MUTUAL IN INNOVATIVE WAYS BENEFIT MISSION VALUES VISION - PURPOSE Maximizing the generation of sustainable value for the system made up of all of the company’s stakeholders

  59. Slide 59: Table of Contents

    Table of Contents The Company New Strategy Performance

  60. Slide 60: Social

    Social Best Sustainability Report in Chile Launching of the Gabriela Mistral Anthology on 2007- 2009 International Book Day Magister in Mining Management for employees. Road and Traffic Safety Campaign Minera Los Pelambres Scholarships

  61. Slide 61: Environmental Management

    Environmental Management Reforestation Closing of Quillayes Tailings Dam Archeological Management Plan Dust Control Waste Management

  62. Slide 62: Production

    Production 0.81 0.80 (as of Sept’10) 0.77 % 0.76 0.74 0.71 333 336 301 351 324 400 Ktons 2005 2006 2007 2008 2009 2010 E CuF (ktmf) Copper Grade 9,847 10,156 9,200 tons 8,710 7,759 297 7,229 277 225 (as of Sept’10) 191 193 189 ppm 2005 2006 2007 2008 2009 2010 E Mof Mo Grade

  63. Slide 63: Financial Performance

    Financial Performance 340 333 ¢/lb 328 278 247 188 3.012 2.845 2.298 2.157 2.379 US$ mill 1.961 2005 2006 2007 2008 2009 Sept. 2010 Operating Income Cu Accounting Price 2,322 Sales distribution 2,207 1,628 US$ mill 1,457 9.3% 1,370 1,352 88.8% 2005 2006 2007 2008 2009 Sept. 2010 Copper Molybdenum Si

  64. Slide 64: Cash Cost Competitiveness

    Cash Cost Competitiveness 2010 Copper Mine Cost League: Flexed Data C1 Cash Cost (c/lb Cu) Minera Los Pelambres 2010 15% Source: Brook Hunt – A Wood Mackenzie Company 2010

  65. Slide 65: Final Phase of IDP Start-up Process

    Final Phase of IDP Start-up Process Ktpd Ore Throughput 200 180 175 160 137 140 126 120 110 100 85 80 2000 2002 2004 2006 2008 2010 2012 2014 Ktmf 550 500 Existing mine plan includes ore reserves of 1.5 billion 450 tonnes 400 350 Total mineral resources of 6.2 billion tonnes @ 300 0.52% copper plus

  66. Slide 66: Areas involved in Final Phase of IDP

    Areas involved in Final Phase of IDP Mine Conveyor Belt - Stockpile Grinding Molybdenum Plant Flotation Cu – Tailings Thickeners Tailings System (28’’) Concentrate Pipeline Port

  67. Slide 67: Analyst trip to Chile - Minera El Tesoro

    Analyst trip to Chile - Minera El Tesoro 13 December 2010

  68. Slide 68: El Tesoro Location - Chile

    Location - Chile Sierra Gorda Minera El Tesoro is 21 km located at about 21 km east of Sierra 190 km EL TESORO Gorda, about 190 km Antofagasta to the Northeast of Antofagasta and 1,570 km North from Santiago.

  69. Slide 69: El Tesoro Shareholders & Processes

    Shareholders & Processes Sources of Copper: - Tesoro Central open pit - Tesoro Noreste open pit - ROM - Mirador Crushing Plant Antofagasta Marubeni (Primary/Secondary/Tertiary) Minerals 70% 30% Leaching (Height of heap leach: 2,5 mts) Tailings Stacking EL TESORO Solvent Extraction & Electro winning

  70. Slide 70: 2010 Performance

    2010 Performance December 2010

  71. Slide 71: 2010 Performance: safety

    2010 Performance Historical safety performance: FI: 0.5 / TFI: 3.5 / LTA: 2 TNE preventative suspension due to geomechanical review Solved restriction for wells extraction 9 Safety indicators 25,0 8 19,5 20,0 7 6 15,4 15,0 5 4 9,1 10,0 3 6,6 6,0 2 5,0 1 3,5 8 7 4 8 7 2 0 0,0 2005 2006 2007 2008 2009

  72. Slide 72: 2010 Performance: copper production

    2010 Performance Copper production in line with revised budget (90 kton) Successful re-opening of TNE operations. Water supply for ROM project is assured. Annual production 102.905 82.933 67.532 68.556 93.040 90.772 90.196 86.862 2007 2008 2009 2010 YTD Copper production (tCuf) Pit extraction (kTMS)

  73. Slide 73: Mirador ROM TNE

    Mirador ROM TNE Tesoro Central Mirador - Acquisition and Financing completed Pre-stripping started late November 2010 Production expected to commence in 4Q 2011

  74. Slide 74: Development Strategy

    Development Strategy December 2010

  75. Slide 75: Tesoro Base Case

    Tesoro Base Case 100 90 120 80 70 60 Ton Cuf 231 50 40 533 30 20 10 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Cobre Fino MET Cobre Fino Mirador Cobre Fino ROM

  76. Slide 76: Guidelines for the future

    Guidelines for the future 1 Explorations & Feasibility Studies • Improve access to resources information and district planning; coordination with projects team to generate business cases additional to the sulphur projects 2 Operational Flexibility • Solve bottle necks and review operational & manage

  77. Slide 77: Future Challenges

    Future Challenges EW at MC Available capacity at EW plant 100 100 90 90 120 Llano/Paleocanal 80 80 Sierra Gorda District Opportunities: 70 70 • Telegrafo • Caracoles 60 60 Ton Cuf • Others. 50 50 40 40 231 30 30 533 20 20 10 10 00 2010 2010 2011 2011 2012 2013 2012 2013 2014 2014 2015 2015 2016 2016

  78. Slide 78: Social & Environmental Performance

    Social & Environmental Performance Ranked 18th in Social Responsibility Presidential Recognition Earthquake reconstruction activities Best Work Practices and Gender Equality

  79. Slide 79: Analyst trip to Chile Antucoya Project

    Analyst trip to Chile Antucoya Project 13 16 December 2010

  80. Slide 80: Overview

    ANTOFAGASTA @ PLC Overview

  81. Slide 81: Antucoya Project is part of the Group growth strategy

    Antucoya Project is part of the strategy for growing the Antofagasta Group Strategic Pillars 2009 - 2015 Scope • Search for high potential early stagee mining base: – Chile (outside Sierra Gorda and Los Pelambres 3. Growth beyond the Core districts) Business – International • Reko Diq • Nokomis • Ge

  82. Slide 82: Antucoya Project Location

    Antucoya Project Location Key Aspects  Excellent location. Access by 3 alternative routes.  Power Transmission Lines at 23 km from site.  Access to 3 regional Port infrastructure:  Antofagasta (200km)  Mejillones (140km)  Michilla Terminal (55km)  Synergy with existent Antofagasta Group Infra

  83. Slide 83: General Site View

    General Site View West View East View from “Cerro Mirador”

  84. Slide 84: Antucoya Project Overview

    Antucoya Project Overview  80,000 tons of fine copper from conventional open pit operation.  Conventional primary, secondary and tertiary crushing line. 30,000,000 tons per year to crushing and 125,000 tons per day as mine movement.  Dynamic heap leach area and dump leach & Conventional SX-EW pla

  85. Slide 85: Feasibility Study Strategy

    Feasibility Study Strategy Test Pit Development (Trepsa-Cerro Alto) EID & Permiting Leaching Industrial For Industrial Test Work Test Work (GAC, B&B) Industrial Geotechnical and (Minera Michilla) Blasting Test Work (Arcadis, Enaex, Cerro Alto) Geological Model Update (SRK) Trade Offs & Value Enginee

  86. Slide 86: Road Map

    Road Map 2010 2011 2012 2013 2014 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Value Engineering Industrial Test Work EIA EIA Process Feasibility Study Expert Capex review Project Execution Plan Project Operation Plan Independent Review Inter-Stage-FEL 3 Financing analysis Project Fin

  87. Slide 87: Geology

    ANTOFAGASTA @ PLC Geology

  88. Slide 88: Main Deposit Characteristics

    Main Deposit Characteristics Relevant Aspects  Cu Porphide from cretaceous age with copper grade < 0.50% CuT.  The “Buey Muerto” Porphide is 1.9 km. long by 1.6 km. wide.  Mineralization presents oxidation to 350 meters depth.  Over 100.000 metres of drillings.  Over 1 Billion tonnes @0.3 Total

  89. Slide 89: Typical Deposit Section

    Typical Deposit Section ANDESITAS Teeho de sulfuros oxIDOs BRECHAS DE IGNEA GRAVAS ANDESITA PREMINERSL PORFIDO PRINCIPAL gf SN ANTOFAGASTA a Pic GRAVAS CON MINERALIZ, EROTICA DE COBRE OxIDGS DIQUES TARDIOS

  90. Slide 90: Phase 1, 2 and 3 (First 5 years)

    Phase 1,2 and 3 (First 5 years) 1490 1490 1415

  91. Slide 91: Phase 9 (Final Pit)

    Phase 9 (Final Pit) 1295 1355 1325 1355 1295

  92. Slide 92: Heap - Rom 80.000 TMF Annual Plan

    Heap - Rom 80.000 TMF Annual Plan

  93. Slide 93: Engineering

    ANTOFAGASTA @ PLC Engineering

  94. Slide 94: Project Layout

    x CSTE ee : ine 7 : Iu vt Bakes | UA S| i : Bea PUIL Mites Ady ai ates I AN e SOY Ne mc seeh ies 7 tia ~ : : m4 ii — “ ~~ aye =a 58 wile Y ee em OA i ; baa hea Pr * 1G F = & ‘ | pi LAT ANE WD Mn Ihr geet i Pe tele _ r pS aw Ul anes 5 \ Ss Bt Som a! DA Ge a = pethee Zz S + LS a Cc vinahaaekl —|4- hes

  95. Slide 95: Main Supplies

    Main Supplies Sulfuric Acid (700.000 tpy) 100% Truck: Mejillones Terminal – Mititus – Antucoya Water (270 l/seg) Power (45Mw) 7 km Aqueduct from Pump 28 km of 220 Kv. line, from existing Station EB3 of Minera Esperanza line of Transelec or Edelnor

  96. Slide 96: Industrial Test Work

    ANTOFAGASTA @ PLC Industrial Test Work

  97. Slide 97: Schematic Representation of Test Work

    Schematic Representation of Test Work SITE ANTUCOYA Geotechnical, Geological, Ore Stock Drilling & Blasting, Pit 1,5 M t parameters Ore movement to Michilla 2 ktpd Camp, offices and workshops MINERA MICHILLA ROM Ore Stock Michilla ROM + Primary Crush SX Heap 1 Heap 2 EW Cu Recovery, Metallurgy, Heap

  98. Slide 98: Industrial Test Work

    Industrial Test Work Test Pit AMSA Executives at Test pit Antucoya Heap Leach Test Area at Michilla

  99. Slide 99: Ore Stock for testing at Minera Michilla

    Ore Stock for testing at Minera Michilla

  100. Slide 100: Crushed Ore Stacking for Testing

    Crushed Ore Stacking for Testing

  101. Slide 101: Testing Heap Leach Area at Michilla

    Testing Heap Leach Area at Michilla

  102. Slide 102: Irrigation System for Heap Leach at Michilla

    Irrigation System for Heap Leach at Michilla

  103. Slide 103: Solutions Flow in Heap Leach Area at Michilla

    Solutions Flow in Heap Leach Area at Michilla

  104. Slide 104: Preliminary Results of Test Work

    Preliminary Results of Test Work Good Cu Recovery Less Sulfuric Acid Consumption 13 Heap Leach is testing 11 HL will be test next month • Projected 100% of • Acid consumption < 18 kg/t, Soluble Cu Recovery Slightly less than used for Pre feasibility. Good Crushing Better Kinetics • Best results usin

  105. Slide 105: Environmental & Social Sustainability

    Environmental & Social Sustainability

  106. Slide 106: Environmental Issues

    Environmental Issues  Absence of reptiles and micro mammals  Presence of Birds: Catarthes aura (Jote de cabeza roja) and Larus modestus (Gaviota garuma). Larus modestus, 2 nesting adults were viewed, Species labeled as Vulnerable.  4 low relevance archeological point was finding in 2010 campaign.

  107. Slide 107: Community Engagement

    Community Engagement In accordance with Antofagasta policies and standards about dialogue and transparency, the Antucoya project included, at an early stage, a voluntary anticipated plan of social dialogue and interaction with authorities, to foster and facilitate project development. This anticipat

  108. Slide 108: Antucoya, a good business for Antofagasta

    Antucoya, a good business for Antofagasta 1,6 Mton of Cuf 80.000 tpa Cuf LOM 19 years Low Social & Environmental Impact • Nearest community at 45 km • No underground water Synergy with • No relevant archeology Existing Assets • Good Logistic infrastructure • EB3 ESP at 7 km. • 100% Sea water Signifi