Copper One Resources Corp. · CSE:CEXY
Copper One Resources — Majuba Hill Copper — Investor Presentation (September 2023)
34 slides from Copper One Resources's investor presentation, Sep 12, 2023
Slide 1: Investor Presentation September 2023
Investor Presentation September 2023
Slide 2: Majuba Hill is positioned to take advantage of the copper market
MAJUBA HILL IS POSITIONED TO TAKE ADVANTAGE OF THE COPPER MARKET www.majubahillcopper.com 2
Slide 3: Company Introduction
COMPANY INTRODUCTION • Majuba Hill Copper Corp. is engaged in the business of exploring and developing the prospective Majuba Hill Copper Property directly in response to the growth of the electric vehicle (EV) industry in mining- friendly Nevada. • Managed by a growing team of resource sector profe
Slide 4: Comparison with Peer Group
COMPARISON WITH PEER GROUP Total Company Region Ticker Commodity * Market Cap Projects Majuba Hill Copper Corp. USA CSE:JUBA Cu-Au-Ag 1 $8,654,661 Filo Corp. Chile, Argentina TSXV:FIL Cu 1 $2,596,786,476 Oroco Resource Corp. Mexico TSXV: OCO Cu 2 $149,130,287 Copper Fox Metals Inc. USA, Canada TSXV:
Slide 5: Management and Directors
MANAGEMENT AND DIRECTORS David Greenway – CEO & Director Natasha Sever, BCom, CPA – CFO David Greenway is a respected CEO with Natasha Sever is a highly skilled and over 20 years of expertise in managing, accomplished CFO with dual CPA financing, and developing growth strategies designations in Cana
Slide 6: Directors Cont'd
Directors Cont’d Bradley J. Dixon, B.Sc., JD – Larry Segerstrom, MSc., Yari Nieken, MBA, CIM – Director MBA – Director Director Mr. Dixon, partner at Givens Mr. Segerstrom, a bilingual Mr. Nieken, a finance Pursley LLP and Litigation P.Eng and Geologist, possesses professional, has 14+ years of Grou
Slide 7: Technical Advisors
TECHNICAL ADVISORS Buster Hunsaker, B.S., M.S. - Senior Geologist and Qualified Person Buster Hunsaker is an accomplished exploration geologist, providing comprehensive turn-key exploration services to senior and junior mining companies in North America, South America, and Mongolia. With a wealth of
Slide 8: Advisory Board
ADVISORY BOARD John Ryan, B.S., J.D. – Advisory Board Mr. Ryan has been an active entrepreneur and mining engineer in the resources sector for over twenty years. He has extensive experience in the natural resource sector having served as an officer and/or director of companies such as Bunker Hill Mi
Slide 9: Copper
Copper • Copper is a crucial metal to consider for exposure in the next decade, benefiting from cyclical tailwinds. • The significant role of copper in the clean energy transition will drive robust long-term demand. • The absence of a definite solution to the impending supply shortage for copper cre
Slide 10: Global Copper Demand
GLOBAL COPPER DEMAND CHINA (49% OF GLOBAL CONSUMPTION) • Existing infrastructure will also become more copper- intensive due to the requirement of "Smart grids" that will play an important role in the energy transition. • According to IEA "Investment in copper- intensive smart grids will need to mor
Slide 11: Copper Price – 5 Yr
COPPER PRICE – 5 YR www.majubahillcopper.com 11
Slide 12: Copper and the Race to Net-Zero
COPPER AND THE RACE TO NET-ZERO Two primary pillars of the clean energy transition to achieve the global commitment of net-zero CO2 emissions by 2050 are: 1. The electrification of the global vehicle fleet 2. The switch to renewable energy for power generation. Electric vehicles (EVs) are expected t
Slide 13: Majuba Hill Property
Majuba Hill Property Advancing to a Mine • Location & Infrastructure • Copper Production • Advancing to a Resource www.majubahillcopper.com 13
Slide 14: 2023 NI43-101 Technical Report
2023 NI43-101 TECHNICAL REPORT • Primary Conclusions: “…a copper Exploration Target has been estimated with a range of between 50 million tonnes and 100 million tonnes. Estimated grades of the Exploration Target range from 0.15% Cu to 0.30% Cu. There is potential for developing a higher-grade zone o
Slide 15: Location and Infrastructure
LOCATION AND INFRASTRUCTURE • Majuba Hill is in northern Nevada 251 km (156 miles) northeast of Reno, in Pershing County. • U.S. Highway 80 Interstate/Freeway from Reno • Gravel Road Access maintained by Pershing County • Primary electric powerline with substation 35 km (22 miles) from Project • Maj
Slide 16: Claims and copper exploration target
• 403 federal lode mining claims • Four private property parcels • 3,916 hectares (9,676 acres) “…a copper Exploration Target has been estimated with a range of between 50 million tonnes and 100 million tonnes. Estimated grades of the Exploration Target range from 0.15% Cu to 0.30% Cu. ” www.majubah
Slide 17: Historic Copper Production
HISTORIC COPPER PRODUCTION • Majuba Hill is a porphyry copper project. Historic underground mines produced Copper, tin, and silver from the early 1900s into the 1950s. • Modern drilling, geologic mapping, rock/soil geochemistry, and geophysical data outline an area containing up to 660 million pound
Slide 18: Overall project potential and historic high-grade production
The overall potential for the project is 500-1,500 million tons in oxide/sulfide, open- pittable mineralization at grades of 0.30 to 0.40% Cu, 6 to 12 g/t Ag, & 0.50 to 0.75 g/t Au. Historic high-grade Production • Historic underground mines produced high-grade copper from outcropping porphyry coppe
Slide 19: Geology and Mineralization
GEOLOGY AND MINERALIZATION www.majubahillcopper.com 19
Slide 20: Advancing to a Resource
ADVANCING TO A RESOURCE NI 43-101 Mineralization Total Drilling-104 holes • 25,005 meters in 49 RC/55 Core Drill Holes Mineral Estimation-78 holes • 22,543 meters in 33 RC/45 Core Whittle Pit Input Parameters • 10 m blocks/ 3 m composites • Grade Domains: 0.02 to 0.05%Cu; 0.05 to 0.5% Cu; >0.5% Cu •
Slide 21: Block Model
BLOCK MODEL Block Model Section 1110 With Whittle Pit Outlines Exploration Target-Conceptual Pits • 50 million to 100 million tonnes • 0.15% Cu to 0.30% Cu Potential Higher-grade Zones • 10 to 20 million tonnes • 0.40 % Cu to 0.80% Cu Tonnage Range Grade Range Copper Range Model (1) Tonnes Copper (%
Slide 22: Planned Drilling - 15 to 20 Holes
PLANNED DRILLING-15 to 20 Holes Block Model Section 1110 With Whittle Pit Outlines Section 1110 With Existing Holes and Planned Drilling www.majubahillcopper.com 22
Slide 23: Share Structure
SHARE STRUCTURE OTC: NPEZF CSE: JUBA FWB: 4NP Issued and Outstanding 54,091,631 Warrants 16,022,228 Options 1,000,000 Fully Diluted 71,113,859 Share Price Share Price (09/12/2023) $0.16 52-week High-Low $.040 -$0.12 Market Capitalization $8,654,661 www.majubahillcopper.com 23
Slide 24: www.majubahillcopper.com
www.majubahillcopper.com 24
Slide 25: Contact Us
CONTACT US We value our investors - Please contact us via your preferred method if you have any questions. Royal Centre, Suite 1500 CSE: JUBA 1055 West Georgia Street, PO Box 11117 Vancouver, British Columbia OTC: JUBAF Canada V6E 4N7 FWB: 4NP Contact: Joel Warawa, VP of Corporate Communications Pho
Slide 26: Disclaimer and Forward-Looking Statements
DISCLAIMER AND FORWARD-LOOKING STATEMENTS This presentation (the “Presentation”) has been prepared solely for information purposes in connection with the contemplated issue of shares in Majuba Hill Copper Corp. (“Majuba Hill Copper” or the “Company”) and is being furnished by Majuba Hill Copper to a
Slide 27: Thank You
THANK YOU www.majubahillcopper.com 27
Slide 28: Majuba Hill Property Appendix Slides
Majuba Hill Property Appendix Slides “Join us as we uncover the potential for value creation and market cap growth in the world of copper exploration with Majuba Hill Copper” Buster Hunsaker - Senior Geologist www.majubahillcopper.com 28
Slide 29: Work Program 2020
WORK PROGRAM 2020 In 2020, Majuba Hill Copper carried out various activities at the Majuba Hill project. Here are the key highlights: Drilling: • Five core holes and four Reverse Circulation (RC) holes were drilled, totaling 8,706 feet (2,653.6 m). • Two core holes specifically targeted the historic
Slide 30: Work Program 2021
WORK PROGRAM 2021 In 2021, Majuba Hill Copper conducted extensive drilling and geological work at the Majuba Hill Porphyry Copper Project. Here are the key highlights: Drilling: • 14,893.5 feet (4,539.5 m) were drilled in 15 Reverse Circulation (RC) holes and 2 core holes. • The 2 core holes targete
Slide 31: Work Program 2022
WORK PROGRAM 2022 In 2022, Majuba Hill Copper carried out various activities at the Majuba Hill project. Here are the key highlights: Soil Sampling: • Collected 1050 additional soil samples which significantly increased the size of the DeSoto and the Copper Gold Target zones. • The DeSoto Target was
Slide 32: Significant Drill Results
SIGNIFICANT DRILL RESULTS From To Interval From Length Copper Hole To (ft) (meters) (meters) (meters) (ft) (ft) (%) MHB-2 0.0 44.5 44.5 0 146 146.0 1.41% MHB-3 129.5 176.8 47.2 425 580 155.0 0.68% MHB-6 125.0 144.8 19.8 410 475 65.0 0.15% 228.6 243.8 15.2 750 800 50.0 0.72% inc 237.7 243.8 6.1 780 8
Slide 33: Majuba Hill Geology
Majuba Hill Geology www.majubahillcopper.com 33
Slide 34: www.majubahillcopper.com
www.majubahillcopper.com 34
Majuba Hill Copper — Investor Presentation (September 2023) on 6ix