Prosafe Se · OSL:PRS

Prosafe — Q3 2024 Earnings Presentation

31 slides from Prosafe's earnings presentation, Nov 14, 2024

  1. Slide 1: Q3 2024 Results

    Q3 2024 (Apr 5th, 2024 @ 13:47): PN: New image Results 14 November 2024

  2. Slide 2: Disclaimer

    Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurate.

  3. Slide 3: Key events Q3 2024

    Key events Q3 2024 Operations and HSSE  Good operating and safety performance on all vessels  Utilisation of 57%, four out of seven vessels operating during the quarter  Strong commercial performance ‒ LOIs for Safe Boreas and Safe Caledonia now firm contracts ‒ Safe Concordia options declared wi

  4. Slide 4: Boreas and Caledonia contracted, building 2025-2027 backlog

    Boreas and Caledonia contracted, building 2025-2027 backlog Vessel 2024 2025 2026 2027 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Safe Zephyrus Petrobras (Brazil) Petrobras (Brazil) Safe Eurus Petrobras (Brazil) Safe Notos Petrobras (Brazil) Petrobras (Brazil) Safe Concordia US Gulf of Mexico S

  5. Slide 5: Market

    Market 5

  6. Slide 6: Brazil employing ~50% of global fleet

    Brazil employing ~50% of global fleet Norway: 3 vessels UK: 2 vessels Safe Caledonia - Ithaca USA: 1 vessel Safe Concordia - Undisclosed Guyana: 1 vessel Australia: 2 vessels Brazil: 11 vessels Safe Boreas – Undisclosed Safe Zephyrus - Petrobras Africa: 2 vessels Safe Notos - Petrobras Safe Eurus -

  7. Slide 7: Market tightening to 2030 and beyond

    Market tightening to 2030 and beyond Offshore accommodation demand and supply development (vessel years)  New, incremental 2-year tender recently released by Petrobras Forecast with 2026 start-up 28,7 Assuming no new units enter the market 27,3 25,8 26,2 25,7  Additional, multi-year tenders 23,5 2

  8. Slide 8: Strong demand development in Brazil

    Strong demand development in Brazil Brazil activity (unit growth) Forecast  Oil and gas production expected to double to ~ 5 - 6 Potential +29 million barrels in 2030 On order 87 92 78 20  19 FPSOs on order and 20 additional units may be Existing 15 70 7 66 2 64 64 ordered 61 61 62 63 63 1 60 2 17

  9. Slide 9: Enterprise value to replacement cost

    Enterprise value to replacement cost Accommodation vessels compared to other assets1 Low Prosafe asset valuation relative to replacement cost2 100% USD million EV / Replacement Cost 1 600 90% USD 1 – 1.5 bn 80% 1 400 70% 1 200 60% 52% 1 000 49% 50% 44% 800 40% 30% 600 High ~550 EV ~30 - 40% 26% of R

  10. Slide 10: Operations

    Operations 10

  11. Slide 11: Stable operations

    Stable operations Caledonia Scandinavia Boreas  All three Brazil vessels with 99% to 100% utilisation with Petrobras Concordia  Safe operations in quarter with no recordable injuries Zephyrus  Safe Concordia with 100% utilisation ‒ Contract extended in US Gulf of Mexico until Eurus Notos early Ma

  12. Slide 12: Backlog improved and extending into 2027

    Backlog improved and Order backlog (USD million)| 400 extending into 2027 287 19 257 220 323 37 105 35 19 100 7 7  Safe Eurus, Safe Notos, Safe Zephyrus and 268 238 260 213 Safe Concordia on contract and working 179  Backlog of USD 2951) million in firm backlog Q3'23 Q4'23 Q1'24 Q2'24 Q3'24 plus o

  13. Slide 13: Financials

    Financials 13

  14. Slide 14: Operating revenues

    Operating revenues Operating revenues and EBITDA (USD million)  Charter income of USD 34.1 million and other income of USD 0.5 million 45 ‒ In line with previous quarter and driven by stable 35 utilisation 2 1 1 1 34 1 33 33 31  EBITDA of USD 5.0 million. Increased costs 25 29 due to higher activi

  15. Slide 15: Income statement

    Income statement (Unaudited figures in USD million) Q3 24 Q3 23 9M 24 9M 23 12M 23 Operating revenues 34.6 32.8 102.8 68.1 97.7  Improved operating revenue with four Operating expenses (29.6) (24.4) (84.0) (75.9) (108.2) operating vessels in full quarter compared Operating results before depreciati

  16. Slide 16: Balance sheet

    Balance sheet (Unaudited figures in USD million) Vessels 9M 24 367.3 9M 23 388.9 12M 23 383.7 Other non-current assets 3.0 1.2 1.8 Total non-current assets 370.3 390.1 385.5 Accounts and other receivables 24.6 26.8 24.9 Other current assets 7.0 7.0 7.7  Total assets of USD 465.4 million Cash and de

  17. Slide 17: Operating cash flow

    Operating cash flow Cash flow in the quarter (USD million)  Operating cash flow of USD 9.1 million 4 (0) (3) 66 64  EBITDA USD 5.0 million 5 (7) (2)  Working capital of USD 4.2 million, impacted positively by up-front contract payment for Safe Caledonia  Capex spend of USD 2.8 million  Interest

  18. Slide 18: Sustainable capital structure to support growth

    Sustainable capital Indicative refinancing need in 2025 (USD million) structure to support growth 450 80  Increased backlog and improved outlook create a 400 28 ~ 401 platform to strengthen liquidity and achieve a sustainable capital structure (50) 350 343  Refinancing process is continuing with a

  19. Slide 19: Summary and outlook

    Summary and outlook 19

  20. Slide 20: Summary

    Summary Market leader with Positioned for long-term significant share of capacity value creation driven by in a tightening market and Brazil demand access to newbuilds at attractive lead time High earnings potential, Focus on achieving favourable replacement sustainable capital value structure prior

  21. Slide 21: Appendix

    Appendix 21

  22. Slide 22: Interim condensed consolidated statement of cash flows

    Interim condensed consolidated statement of cash flows (Unaudited figures in USD million) Q3 24 Q3 23 9M 24 9M 23 12M 23 Loss before taxes (11.5) (5.7) (28.4) (52.0) (73.2) Deferred revenue recognition (IFRS 15 adjustment) 0.0 0.0 0.0 0.0 0.0 Share of loss of equity of an associate 0.0 0.0 0.0 0.0 0

  23. Slide 23: Interim condensed consolidated statement of comprehensive income

    Interim condensed consolidated statement of comprehensive income (Unaudited figures in USD million) Q3 24 Q3 23 9M 24 9M 23 12M 23 Net loss for the period (11.8) (5.7) (30.7) (53.1) (67.8) Foreign currency translation 0.8 (0.7) 0.2 0.7 1.3 Revaluation hedging instruments 0.0 0.0 0.0 0.0 0.0 Pension

  24. Slide 24: Interim condensed consolidated statement of changes in equity

    Interim condensed consolidated statement of changes in equity (Unaudited figures in USD million) Q3 24 Q3 23 9M 24 9M 23 12M 23 Equity at beginning of period 14.8 19.3 33.8 37.3 37.3 Revised equity at beginning of period 14.8 19.3 33.8 37.3 37.3 IFRS 15 adjustment to opening balance 0.0 0.0 0.0 0.0

  25. Slide 25: Vessel update - Brazil

    Vessel update - Brazil Safe Eurus Safe Notos Safe Zephyrus DP3 – Worldwide1 DP3 – Worldwide1 DP3 - Worldwide  Contracted to Petrobras until Q1 2027  Contracted to Petrobras until Q3 2026  Contracted to Petrobras until February 2025, with extension to September 2027 expected  98% utilisation in 2

  26. Slide 26: Vessel update – North Sea and rest of world

    Vessel update – North Sea and rest of world Safe Boreas Safe Caledonia Safe Concordia Safe Scandinavia DP3 - Worldwide TAMS - UK North Sea DP2 – Worldwide2 TSV/accommodation - UK / NCS  Contract signed for operations in  Contract signed for UK. Start-up June  Firm contract extended to early  Ten

  27. Slide 27: Analytical information

    Analytical information Expenditure information Indicative opex/day by region Item 2024 2025 Comment Region 2024 / 2025 Opex Estimated Estimated Estimated (USDm) (USDm) (USDk/day) SG&A1 ~20 ~20-21 SG&A increase driven by increased activity and inflation UK (DP-Boreas/Zephyrus) 35-45k Depreciation ~32

  28. Slide 28: Outstanding debt

    Outstanding debt Three Tranches of Debt 2 Main Tranches COSCO Sellers Credit Debt maturity profile Outstanding debt $343m (two tranches 250m & 93m Notos) $80.0m Pledged vessels Boreas, Zephyrus, Caledonia, Concordia, Eurus Scandinavia, Notos (only 93m tranche) COSCO Interest rate SOFR + Credit Adjus

  29. Slide 29: Two newbuilds available at yard

    Two newbuilds available at yard  Only two DP3 newbuild semis available at yard ‒ 500 POB and suited for Brazil requirements ‒ Ongoing dialogue with the yard on how to facilitate delivery in expected future Petrobras tenders ‒ Long-term contracts required to justify delivery Existing delivery terms

  30. Slide 30: Tax

    Tax  Prosafe SE is a permanent tax resident in Norway and its Norwegian tax resident subsidiaries have a base for deferred tax assets of approximately USD 1.7 billion as at end 2023. The deferred tax assets are currently not recognized in the financial statements. In Q4 2023, the Norwegian tax auth

  31. Slide 31: We are headquartered in Norway and have offices in the UK, Brazil and Singapore

    We are headquartered in Norway and have offices in the UK, Brazil and Singapore prosafe.com