Northern Dynasty Minerals Ltd. · TSX:NDM

Northern Dynasty Minerals — Investor Presentation (September 2016)

72 slides from Northern Dynasty Minerals's investor presentation, September 2016

  1. Slide 1: The Pebble Project: The Future of U.S. Mining and Metals

    v Re Northern Dynasty Minerals Ltd. THE PEBBLE PROJECT The Future of U.S. Mining and Metals September 2016

  2. Slide 2: Cautionary & Forward Looking Information

    Cautionary & Forward Looking Information This presentation includes certain statements that may be deemed "forward-looking statements". All statements in this presentation, other than statements of historical facts, that address exploration drilling, exploitation activities and events or development

  3. Slide 3: Investment Highlights – A World-Class Investment Opportunity

    Investment Highlights – A World-Class Investment Opportunity Resource  World Class – Tier 1 by every measure – Pebble is strategic Strategic First-World  Alaska USA – State land – Exploration & Development designation Advantages Location  Politically stable-history of responsible resource managem

  4. Slide 4: A World-Class Mineral Resource

    A World-Class Mineral Resource Resources Measured & Inferred Indicated  6.44 B tonnes of Measured & Indicated Copper 57 B lb 25 B lb  4.46 B tonnes of Inferred Gold 70 M oz 37 M oz Molybdenum 3.4 B lb 2.2 B lb Silver 344 M oz 170 M oz * Refer to table of Measured, Indicated and Inferred Resources

  5. Slide 5: Global Ranking of Porphyry Deposits – Contained Copper and Gold

    Global Ranking of Porphyry Deposits1 – Contained Copper and Contained Gold Pebble is the World’s Largest Undeveloped Copper And Gold Resource Source: Company filings, Metals Economics Group, street research; BMO Capital Markets Note: Includes inferred resource. 1. Converted to Au Eq. at street conse

  6. Slide 6: Pebble Project Area – Strategically Situated in Alaska, USA

    Pebble Project Area – Strategically Situated in Alaska, USA Six Major Producing Mines - Alaska a Resource Development State Alaska State Constitution (1949) “It is the Policy of the State of Alaska to encourage…the development of its resources by making them available for maximum use consistent with

  7. Slide 7: Pebble – 'Multi-Prong' Strategy in Action

    Pebble – ‘Multi-Prong’ Strategy in Action • Federal Advisory Committee Act (FACA) litigation − Preliminary Injunction granted − EPA Motion to Dismiss denied − Depositions ongoing • Freedom of Information Act litigation – a significant success • Cohen / DLA Piper – Highly critical, independent report

  8. Slide 8: Bristol Bay Salmon – The Real Story

    Bristol Bay Salmon – The Real Story The Fishery is Not Threatened • Bristol Bay Watershed • 41,900 sq. mi • 9 discrete river systems • Kvichak & Nushagak-Mulchatna • 23,000 sq. mi • ~20% of Bristol Bay sockeye production • Pebble Project Area • ~16 sq. mi (1/25th of 1% of 41,900 sq. mi) • 2 of 9 wat

  9. Slide 9: Answering Important Questions with Science: Fish Habitat and Fish

    Pebble: Answering Important Questions with Science What About the Fish Habitat and Fish? • Extensive hydrological studies undertaken over 10 years – PLP estimates that 5 times more surplus water will be available for treatment and release to mitigate potential downstream effects on aquatic habitat t

  10. Slide 10: Answering Important Questions with Science: Fish Habitat and Fish

    Pebble: Answering Important Questions with Science What About the Fish Habitat and Fish? • EPA stream length estimates in the BBA Stream Length % of Affected by are a very small portion of all streams in EPA Mining Project % of Bristol Nushagak/ Scenario Bay Kvichak the watershed according to USGS d

  11. Slide 11: Answering Important Questions with Science: What About the Water?

    Pebble: Answering Important Questions with Science What About the Water? • Robust engineered water management system WATER MANAGEMENT KEY – All contact water collected and stored in SSF PRINCIPLES: for re-use and release 1. Water Management Boundary – Highly-engineered seepage management, Water will

  12. Slide 12: Answering Important Questions with Science: What About Seismicity?

    Pebble: Answering Important Questions with Science What About Seismicity? • Engineered design criteria for Pebble SSF and other facilities are extremely conservative • SSF design earthquake: – Various earthquake scenarios studied at locations throughout region – Lake Clark extension of Castle Mounta

  13. Slide 13: Answering Important Questions with Science: Sand Storage Facility

    Pebble: Answering Important Questions with Science What About the Sand Storage Facility? OVERALL PRINCIPLES: • Three highly engineered embankments to provide safe, permanent storage of 1.8 billion tons of sand – Conservatively designed to withstand maximum forecast flood, storm, seismic events – Str

  14. Slide 14: The Path to a Record of Decision

    Pebble: The Path to a Record of Decision NEPA and 404 Permit Process • For a project like Pebble once an application has been filed: – Scoping – ½ year – Prepare Draft EIS – 1 - 1½ years – Public Comments – ½ - 1 year – Final EIS/ROD – 1 year – Total = 3 – 4 years • History of the 404c Veto – 13 tim

  15. Slide 15: Pebble Project – National Economic Impact Study

    Pebble Project – National Economic Impact Study1 Project like Pebble can be Economically Very Significant • Nationally – 15,000 jobs – $2.7 billion to US GDP annually – Increase US copper production by 20% over decades of production • In Alaska – Some 3,000 high-wage jobs – $109,500 average annual s

  16. Slide 16: Copper Demand Outlook

    Copper Demand Outlook China’s Shift to Consumption Supports Demand Copper intensity expected to increase in China2 • Non-OECD demand growth forecast at +3.6% per annual to 20302 • Includes Chinese demand growth +2.6% p.a. to 2030 and • OECD demand decline of 0.6% p.a. to 2030 Source: United Nations;

  17. Slide 17: Copper – A Significant Structural Deficit is Forecast

    Copper – A Significant Structural Deficit is Forecast Expecting continued Significant deficit expected to ore grade decline1 emerge later this decade1 • Peak production next year • 2% p.a. supply reduction thereafter • Grade ↓ by 19% since 2000 • Further 17% ↓ by 2025 Source: Wood Mackenzie; BHP Bil

  18. Slide 18: Gold – Supply

    Gold – Supply Supply: Peak Gold Production See Goldcorp Corporate Presentation “Together, Creating Sustainable Value” at www.goldcorp.com (1) Source: SNL Metals Economics Group (2) Source: Consensus estimates. Includes CPM Group, GFMS, and Metals Focus 18

  19. Slide 19: Global C1 Copper Cash Costs

    Global C1 Copper Cash Costs1 Pebble’s C1 copper cash costs are anticipated to be in the first decile of global primary copper mines1 C1 Cash Costs Net of By-Product Credits – US$/lb Cu The United States and the world need low cost, long-life, environmentally sound supplies of strategically important

  20. Slide 20: Valuation Potential

    Valuation Potential Current share price provides significant in-situ valuation upside relative to copper and gold peers as the Pebble Project advances Source: BMO Capital Markets, Bloomberg, Public Disclosure Assumptions: Shares of NDM: 260.1 M, estimated cash position: US$14 M. Copper equivalent me

  21. Slide 21: Precedent Transactions – Extraordinary Value in Pebble/Northern Dynasty

    Precedent Transactions – There is Extraordinary Value in Pebble/Northern Dynasty Northern Dynasty In-Situ Values1: US$3.28 per oz Au 23/100ths of 1 cent per lb Cu Exceptional In-Situ Value EV/Resource EV/Resource Date Acquiror Target Stage Date Acquiror Target Stage (US$/oz) (US₵/lb) Gold Developer

  22. Slide 22: Pebble Project Milestones – Completed and Projected

    Pebble Project Milestones – Completed and Projected 2015 • Advance conversations regarding potential partner(s) transaction  • Advance multi-prong strategy to deal with the ‘politics of permitting’  • Advance land access agreements with AK Native village corporations  2016 • Resolve EPA’s ‘Propos

  23. Slide 23: Investment Conclusions – A World-Class Investment Opportunity

    Investment Conclusions – A World-Class Investment Opportunity  World-Class Resource  US$750+ million invested  Great Location  Fisheries and mining can safely co-exist  Strategic Advantages  Very Important Economic Benefits for Alaska and USA  Conclusion  Pebble is a world-class deposit  Re

  24. Slide 24: Appendices

    v (Re. Northern Dynasty Minerals Ltd. dl APPENDICES

  25. Slide 25: Northern Dynasty Shares are Undervalued

    Northern Dynasty Shares are Undervalued Listed NYSE MKT – NAK; TSX – NDM Shares Out (Fully Diluted) 264.6 (341.8)1 Million Average Daily Volume (LTM) 1,167,000 shares/day Management Owns (Fully Diluted) 8.6% Cash $CAD 12.1 Million (June 30, 2016) 1. Includes warrants exercisable as follows: 2,735,43

  26. Slide 26: Pebble is Among the World's Greatest Stores of Mineral Wealth

    Pebble is Among the World’s Greatest Stores of Mineral Wealth 26 26

  27. Slide 27: Historical Mining Activity

    Historical Mining Activity Historical Mine Sites in Alaska 27

  28. Slide 28: Southwest Alaska & Bristol Bay

    Southwest Alaska & Bristol Bay Access corridor as per prior studies 28 28

  29. Slide 29: Pebble Fisheries and Mitigation

    Pebble Fisheries and Mitigation 29

  30. Slide 30: Discussion Topics

    Discussion Topics 1. Pebble – A permittable project, driven by rigorous science 2. Case Studies – Validate fisheries protection and enhancement is achieved 3. Fish Habitat Mitigation – A track record of success 4. EPA Watershed Report – A biased document under investigation by the EPA Inspector Gene

  31. Slide 31: Comprehensive Multi-Disciplinary Science

    Comprehensive Multi-Disciplinary Science Exhaustive data collection since 2004: Environmental Studies • Surface Water • Wildlife • Water Quality • Air Quality • Groundwater • Noise • Geochemistry • Cultural Resources • Snow Surveys • Subsistence • Analytical QA/QC • Land Use • Fish & Aquatic Resourc

  32. Slide 32: Environmental Baseline Document (EBD) – January 2012

    Environmental Baseline Document (EBD) – January 2012 Scientific Integrity – Foundation for Successful Permitting • State/Federal permitting requires scientific rigor • Pebble environmental science – unprecedented scope/rigor – $150 million spent on intensive multi-disciplinary studies over 9 years –

  33. Slide 33: Pebble Limited Partnership Approach – Responsible Mineral Development

    Pebble Limited Partnership Approach – Responsible Mineral Development • Environmentally driven design – Engineers and Scientists collaborate on optimal design • Avoid, minimize, mitigate and compensate • EBD science informs the project impacts which in turn inform mitigation response and design • Mi

  34. Slide 34: Comprehensive Basin-Wide Knowledge of Hydrology

    Comprehensive Basin-Wide Knowledge of Hydrology 34

  35. Slide 35: Model Results – Weighted Usable Width (WUW)

    Model Results – Weighted Usable Width (WUW) 2012 - SFK-B, Coho Spawning 30 30 Average Year Pre-Mine 25 Mine Affected 25 Difference Average WUW (feet) 20 20 15 15 10 10 5 5 0 0 -5 -5 -10 -10 24 25 26 27 28 29 30 31 32 33 34 River Kilometer 35

  36. Slide 36: Salmon Mitigation/Enhancement Opportunities

    Salmon Mitigation/Enhancement Opportunities • Numerous Pebble/Bristol Bay streams not producing fish at full potential due to natural constraints: – beaver dams & other barriers – dewatered & relic channels – low habitat complexity – limiting water quality Early June 2004 – poor seeding due to low e

  37. Slide 37: Alaska Fish Habitat Enhancement Projects – Agency Approved

    Alaska Fish Habitat Enhancement Projects – Agency Approved 37

  38. Slide 38: Hard Rock Mining & Salmon Do Co-Exist – Fraser River Basin, BC

    Hard Rock Mining & Salmon Do Co-Exist Fraser River Basin, BC* • Fraser River basin a Mined Metals Tonnage Versus Salmon Escapement in Fraser Watershed close analogue to Bristol Bay basin • Empirical evidence shows mining activity over last 50 years had: − No negative effect on salmon populations − N

  39. Slide 39: Highland Valley Copper Mine – Mining & Salmon in British Columbia

    Highland Valley Copper Mine – Mining & Salmon in British Columbia 39

  40. Slide 40: Highland Valley Copper Mine – Mining & Salmon in British Columbia

    Highland Valley Copper Mine – Mining & Salmon in British Columbia 40

  41. Slide 41: Gibraltar Mine, British Columbia

    Gibraltar Mine, British Columbia Fraser River 41

  42. Slide 42: Mines & Fisheries Do Co-Exist

    Mines & Fisheries Do Co-Exist Gibraltar Mine, BC Seepage Collection Pond Trophy Rainbow Trout Conclusions: – We have the science to build and operate a safe mine – Fisheries and mines do co-exist 42

  43. Slide 43: Salmon Habitat Mitigation Summary

    Salmon Habitat Mitigation Summary • Physical/biological sciences applied to successful salmon mitigation projects for +50 years • Agency approved measures • Successful examples include: – Flow regulation to optimize downstream fish habitat availability – Removal of natural barriers to improve access

  44. Slide 44: Pebble Geology

    Pebble Geology 44 iY (Re. Northern Dynasty Minerals Ltd. The Future of U.S. Mining and Metals

  45. Slide 45: Pebble – Geology

    Pebble — Geology 2002 NDM di f 1984 25,7, 38,528 2009/11 Cominco — Sharp 308 (2004) Zones 2 OO7 PLP — Discovery of Mtn Au-Ag veins; _ - 65 Zone, other regional recon Pebble Limited Partnership mineralized areas (NDM/Anglo-American plc) | TODAY e More than 1 million feet | | of core drilled 1 987 ¢ E

  46. Slide 46: Pebble Property Captures the World's Most Extensive Mineral System

    Pebble Property Captures the World’s Most Extensive Mineral System – Exploration Potential is High Induced Polarization has been the principal historical discovery method 46

  47. Slide 47: East-West Geology Section Looking North

    East-West Geology Section Looking North 47

  48. Slide 48: Very High Grades Extend into the East Graben

    Very High Grades Extend into the East Graben East Graben 1000 ft Brittle-ductile deformation What Happens East of the ZG1 Fault? • The highest grades at Pebble are truncated by the East Graben • DDH-6348 intersected 289 m grading 1.98% CuEQ below basalts in the graben; no follow up Interval Cu % Au

  49. Slide 49: Pebble May Host Other Major Deposits

    Pebble May Host Other Major Deposits Pebble Oyu Tolgoi Mineral Chuquicamata Andina-Los Bronce-Los Alaska Trend, Mongolia Chile Sulfatos, Chile • The extent of mineralization at Pebble is comparable to: – Oyu Tolgoi – Chuquicamata – Los Bronces/Andina • Exploration potential at deposit and within reg

  50. Slide 50: Pebble Engineering

    Pebble Engineering 50 iY (Re. Northern Dynasty Minerals Ltd. The Future of U.S. Mining and Metals

  51. Slide 51: Existing Infrastructure at Iliamna Operations Centre

    Existing Infrastructure at Iliamna Operations Centre Lake Iliamna Iliamna 51 51

  52. Slide 52: Cross Section

    Cross Section A A’ Note: Metal prices used for copper equivalent (CuEQ) are same as for resource (see page 54). 52 52

  53. Slide 53: Plan View

    Plan View Note: Metal prices used for copper equivalent (CuEQ) are same as for resource (see page 54). 53 53

  54. Slide 54: 6.44 Billion Tonnes Measured & Indicated; 4.46 Billion Tonnes Inferred

    6.44 Billion Tonnes Measured & Indicated 4.46 Billion Tonnes Inferred Notes: David Gaunt, P.Geo., a qualified person who is not independent of Northern Dynasty is responsible for the estimate. These resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition Standards.

  55. Slide 55: Anticipated Relative Values by Metal

    Anticipated Relative Values by Metal Note: Based on Measured and Indicated Resources only, as identified on page 54. Prices assumed are current long term consensus forecasts of $USD 2.96 lb Cu; $1,250 oz Au; $8.00 lb Mo and 17.75 oz Ag. Source: Company data and BMO Capital Markets. 55 55

  56. Slide 56: Project Power Alternatives

    Project Power Alternatives • Significant energy requirement − 400 MW • Gas combined cycle plant − Several solutions evaluated − Located at mine site • Gas supply − Via pipeline from Kenai Peninsula • IPP opportunity 56 56

  57. Slide 57: Probable Process Flowsheet

    Probable Process Flowsheet 57

  58. Slide 58: Preliminary Bathymetry Data – Design Vessel

    Preliminary Bathymetry Data – Design Vessel • Bathymetry data − Minimum depth – 36 ft − Average sea level – +8 ft − Mean high water – +14 ft • HandyMax − 20,000 to 50,000 DWT − Draft of 41 ft 58

  59. Slide 59: Pebble and Northern Dynasty Public Affairs

    Pebble and Northern Dynasty Public Affairs 59

  60. Slide 60: Southwest Alaska & Bristol Bay

    Southwest Alaska & Bristol Bay 60 60

  61. Slide 61: Elders Forums / Elders Advisory Committee

    Elders Forums / Elders Advisory Committee • Fifth annual Elders Forum held in August 2013 – 220 elders, escorts and youth representing 22 of the 31 in region communities – Presentations on economics, permitting & NEPA process, mitigation, tailings structures, workforce development, etc. – Traditiona

  62. Slide 62: Elders Forums / Elders Advisory Committee

    Elders Forums / Elders Advisory Committee 62 62

  63. Slide 63: Business Development – Alaska

    Business Development – Alaska Commercial Relationships with Local Businesses • Iliamna Development Corporation • Pedro Bay Corporation • Alaska Peninsula Corporation • Iliamna Lake Contractors • Tanalian Corporation • Kijik Corporation o Food services o Housekeeping o Fuel, transportation, aviation

  64. Slide 64: Workforce Development Plan

    Workforce Development Plan • Comprehensive, long-term workforce development strategy • The Pebble Partnership Scholarship Fund • Job specific training for locals • Partnerships with colleges & training organizations • Apprenticeship/internship programs • Support for the Alaska Native Science Enginee

  65. Slide 65: Environmental Baseline Document

    Environmental Baseline Document • One of the most extensive environmental databases ever assembled for a resource development project in America • Climate, water quality, wetlands, fish and aquatic habitat, wildlife, land and water use, socioeconomics and subsistence 65 65

  66. Slide 66: The Pebble Fund

    The Pebble Fund • Five year, $5 million commitment established in 2008 • Enhance sustainability of regional fisheries and local communities; create infrastructure • Over $4.7 million in grants to date, leveraging nearly $13 million in matching funds • Leveraged nearly $13 million in matching funds •

  67. Slide 67: Forecast Economic Benefits for Alaska

    Forecast Economic Benefits for Alaska The IHS report (see page 15) is intended to provide information about general economic effects/contribution of a development at Pebble to Alaska and the USA. The report should not be used to evaluate the Pebble Project’s impact on Northern Dynasty. 67 67

  68. Slide 68: Forecast Economic Benefits for Southwest Alaska

    Forecast Economic Benefits for Southwest Alaska The IHS report (see page 15) is intended to provide information about general economic effects/contribution of a development at Pebble to Alaska and the USA. The report should not be used to evaluate the Pebble Project’s impact on Northern Dynasty. 68

  69. Slide 69: Forecast Economic Benefits for the United States

    Forecast Economic Benefits for the United States The IHS report (see page 15) is intended to provide information about general economic effects/contribution of a development at Pebble to Alaska and the USA. The report should not be used to evaluate the Pebble Project’s impact on Northern Dynasty. 69

  70. Slide 70: Investment Highlights – A World-Class Investment Opportunity

    Investment Highlights – A World-Class Investment Opportunity Resource  World Class – Tier 1 by every measure – Pebble is strategic Strategic First-World  Alaska USA – State land – Exploration & Development designation Advantages Location  Politically stable-history of responsible resource managem

  71. Slide 71: Northern Dynasty Directors & Management

    Northern Dynasty Directors & Management Robert Dickinson Executive Chairman Stephen Hodgson Vice President, Engineering Mr. Dickinson is an economic geologist with more than 40 years of Mr. Hodgson is a professional engineer with more than 40 years of experience in mineral exploration experience, is

  72. Slide 72: Contact Information

    Contact Information General Office Corporate Communications Websites 15th Floor Doug Allen │ VP, Corporate Communications www.northerndynasty.com 1040 W. Georgia Street dougallen@northerndynasty.com www.pebblepartnership.com Vancouver, BC Tel: 604.684.6365 www.pebbleresearch.com Canada V6E 4H1 TF: 8

Northern Dynasty Minerals — Investor Presentation (September 2016) on 6ix