Noa Lithium Brines Inc · TSXV:NOAL

Noa Lithium Brines — Investor Presentation (July 2026)

21 slides from Noa Lithium Brines's investor presentation, July 2026

  1. Slide 1: The Newest Player in the Most Prolific Lithium-Producing District in the World

    NOAL: TSX-V The Newest Player in the Most Prolific Lithium-Producing District in the World. July 2026 1

  2. Slide 2: Disclaimer

    DISCLAIMER The information in this presentation includes certain “forward-looking statements” under applicable Canadian securities legislation. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unkn

  3. Slide 3: Experienced Leadership with Proven Lithium Track Record

    Experienced Leadership with Proven Lithium Track Record A team with direct experience building, operating, and scaling lithium assets in Argentina. Hernán Zaballa Gabriel Rubacha Executive Chairman CEO & Director • Founder and Director AbraSilver Corp • Former CEO of Minera Exar (one of Argentina’s

  4. Slide 4: Building One of the Last High-Quality Lithium Brine Platforms

    Building One of the Last High-Quality Lithium Brine Platforms NOA Lithium is developing a portfolio of high-grade, low-cost lithium brine assets designed to be efficiently scaled and flexibly developed in one of the world’s best lithium jurisdictions. High-grade flagship Proven, low-risk Clean asset

  5. Slide 5: A Structural Lithium Supply Gap

    A Structural Lithium Supply Gap Demand for lithium is accelerating driven by EVs Supply growth is lagging and increasingly and energy storage constrained Very few new large-scale, high-grade brine Many available projects are high-cost, complex, assets remain undeveloped or difficult to scale The mar

  6. Slide 6: Lithium Demand Is Outpacing Supply

    Demand growing ~26% YoY vs. supply at ~16% YoY 4Mt LCE additional supply required to meet demand by 2040 Lithium Demand Is Outpacing Supply ~1.5 Mt incremental lithium supply needed by 2030 (~125% increase from current levels) The lithium market is entering a structural deficit driven by acceleratin

  7. Slide 7: Why Brines in the Lithium Triangle Are the Best Lithium Assets

    Why Brines in the Lithium Triangle Are the Best Lithium Assets Home to the world’s highest- Large, scalable salar systems grade and lowest-cost lithium suitable for long-life resources production The highest-quality lithium resources globally are concentrated in the Lithium Triangle, where brine dep

  8. Slide 8: The Lithium Triangle

    The Lithium Triangle Home to NOA’s projects, holds the world’s best lithium resources in terms of costs & grades NOA’S Three Major Salars: ✓ Rio Grande (37k ha) ✓ Arizaro (78k ha) ✓ Salinas Grandes (10k ha) 50 km NOAL: TSX-V | 8

  9. Slide 9: Argentina: Becoming a Leader in Mining

    RIGI (Big Investments Incentive Regime): 30 years tax stability 0% Export Duties (from 4.5%) Argentina 25% Corporate Tax (from 35%) Becoming a Leader in Mining More Flexibility on FX Currency Management These changes have a significant impact on the project’s economics (potential increase in approx.

  10. Slide 10: Capital Structure

    Capital Structure July 2026 All financial figures in C$ Total Shares Out ~282M Management and Founders Ownership ~36% Warrants out (exercisable $0.221/0.4) ~114M 31% 33% Market Cap ~C$65M 20% 16% ■ Other Investors ■ Clean Elements ■ Other Founders ■ Sr. Management / Founding Partners NOAL: TSX-V | 1

  11. Slide 11: Río Grande

    RÍO GRANDE NOAL: TSX-V | 11 NOAL: TSX-V | 11

  12. Slide 12: Río Grande: World Class, High Margin Lithium Project

    RÍO GRANDE WORLD CLASS, HIGH MARGIN LITHIUM PROJECT ● Flagship asset ● Outstanding project economics ● Potential for resource growth ● Preliminary Economic Assessment (PEA) demonstrates low technical development risk through proven process ● Low production cost ● Flexibility and opportunities: DLE,

  13. Slide 13: Strong Progress with Clear Path to Development

    Strong Progress with Clear Path to Development NOA has rapidly advanced its flagship asset and is entering the next phase of project development. Preliminary Significant Land High-grade ~4.7m Tonne Lce Economic Amount Position Resource Lithium Assessment (PEA) Arr Consolidated Concentration Committe

  14. Slide 14: Compelling Economics Across Development Scenarios

    Compelling Economics Across Development Scenarios Río Grande delivers strong returns across both initial and full-scale development, supported by high grade and low operating costs. ~30-year project life with phased scalability Low-cost position within the global cost curve Strong and consistent ret

  15. Slide 15: Río Grande Project Development

    RÍO GRANDE PROJECT DEVELOPMENT 2023 2024 2025 2026 2027 2028 PROJECT DEVELOPMENT Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q41 Q1 Q2 Initial Exploration Maiden Resource Updated Resource Estimate Preliminary Economic Assessment (PEA) Exploration – Water – Increase Resource – Pumping Feasi

  16. Slide 16: Arizaro

    ARIZARO NOAL: TSX-V | 16 NOAL: TSX-V | 16

  17. Slide 17: Arizaro

    ARIZARO ● One of the least explored salars in Argentina; NOA has ~78,000 ha at the salar ● Next to Lithium Chile’s already explored claims (w/ >500 mg/L Li at depth) ● Other companies on salar: Pluspetrol, Eramet, Tibet Summit, Hanaq ● Close to Arizaro railway station + good road access ● Geophysics

  18. Slide 18: Salinas Grandes

    SALINAS GRANDES NOAL: TSX-V | 18 NOAL: TSX-V | 18

  19. Slide 19: Salinas Grandes

    SALINAS GRANDES ● 10,200 ha in the alluvial /salar ● Surrounded by properties already explored by Orocobre (later LSC and now Pluspetrol) ● NI 43-101 report by LSC in 2013 ● Excellent geophysics results in TEM and VES done by NOA ● Fully paved road access, 40 km from rail station ● Nearby Puna gas p

  20. Slide 20: Thank You

    Thank You Powering the Future of Energy Through Strategic Lithium Development CONTACT info@noalithium.com www.noalithium.com NOAL: TSX-V | 20

  21. Slide 21: Río Grande Project Development

    RÍO GRANDE PROJECT DEVELOPMENT ● 5 DDH holes (~600 m each) ● Resource of approx. 4.7 M tons LCE (M&I + I) ● Measured and Indicated: 2.7M tons LCE / Inferred: 2.0M tons LCE ● High concentration lithium: Avg. 525 mg/l ● Additional resource may be added through areal expansion drilling Total Brine Avg

NOA Lithium Brines — Investor Presentation (July 2026) on 6ix