Athena Resources Limited · ASX:AHN

Athena Resources — Global Iron Ore and Steel Conference 2026

15 slides from Athena Resources's conference presentation, Mar 27, 2026

  1. Slide 1: Updated Corporate Presentation – retraction of peer comparison

    27 March 2026 Updated Corporate Presentation Athena Resources Limited (ASX: AHN) ("Athena" or "the Company") refers to the presentation released on 25 March 2026 titled "Investor Presentation – Global Iron Ore and Steel Conference" (Presentation). The Company advises that the announcement contains a

  2. Slide 2: Global Iron Ore and Steel Conference

    For personal use only Global Iron Ore and Steel Conference March 2026

  3. Slide 3: Disclaimer

    DISCLAIMER For personal use only This presentation (“Presentation”) is dated 25 March 2026 and has been prepared by Athena Resources Limited assumptions on which they are based. Recipients of this Presentation are cautioned to not place undue reliance on such (ACN 113 758 900) (ASX:AHN) (“Athena” or

  4. Slide 4: Byro Magnetite Project: Premium Resource

    BYRO MAGNETITE PROJECT PREMIUM RESOURCE • Exceptional Purity: Metallurgical testwork confirms For personal use only ability to produce over 70% Fe concentrate with only 1.2% silica • Leading Product: High Iron grade and low silica content is highly sought after by buyers • Established Resource: FE1

  5. Slide 5: Narryer Joint Venture: One Resource. Three Partners.

    NARRYER JOINT VENTURE ONE RESOURCE. THREE PARTNERS. Athena has entered into a non-binding term sheet with Terra Mining and Fenix Resources. The joint venture is subject to shareholder approval by Athena shareholders. For personal use only Athena Resources Terra Mining Fenix Resources • 40% profit sh

  6. Slide 6: Narryer Joint Venture: Why This JV Works

    NARRYER JOINT VENTURE WHY THIS JV WORKS For personal use only Terra Mining’s Fenix’s Dry Processing Advantage Integrated Logistics Network • Operates Australia's only full dry-processing • Fully integrated pit-to-port supply chain built over magnetite mine (Extension Hill) years of Mid-West operatio

  7. Slide 7: Narryer Joint Venture: The Springboard for More

    NARRYER JOINT VENTURE THE SPRINGBOARD FOR MORE For personal use only • Why Narryer First • Closest Byro prospect to road and port infrastructure (~336 km to Geraldton) • High-quality magnetite mineralisation confirmed through previous exploration • Simple metallurgy suited to dry magnetic separation

  8. Slide 8: Mid West Green Iron: Athena's Pathway to Green Iron

    MID WEST GREEN IRON ATHENA'S PATHWAY TO GREEN IRON For personal use only • Athena holds 33% in Mid West Green Iron Pty Ltd (MWGI), entered June 2025 • Collaboration to produce Green Iron using: • 100% hydrogen from our project partner • Athena's high-grade magnetite concentrate (70.55% Fe produced f

  9. Slide 9: Mid West Green Iron: Project Development Strategy

    MID WEST GREEN IRON PROJECT DEVELOPMENT STRATEGY1 For personal use only • Start with high-quality magnetite feedstock (Athena's 70%+ Fe concentrate) • Bring product to high-quality, low-cost renewable energy sources • Use existing infrastructure- use existing rail, port and water • Reduce project-on

  10. Slide 10: Mid West Green Iron: Start Small, Prove the Technology

    MID WEST GREEN IRON START SMALL: PROVE THE TECHNOLOGY1 For personal use only • Starting with a demonstration plant • The process technology has been used to test a wide range of ores including Athena's Byro magnetite concentrate • De-risked scale-up as confidence levels increase with each stage • Ba

  11. Slide 11: Mid West Green Iron: Staged Expansion

    MID WEST GREEN IRON STAGED EXPANSION1 For personal use only Stage Activity Timeline and Impact Testing Athena's Byro magnetite samples Stage 1: for technical validity. Proving Australian Ongoing throughout Validate Green Iron from high-grade magnetite. 2026 Low-temperature pelletisation tests. Commi

  12. Slide 12: Mid West Green Iron: Emissions

    MID WEST GREEN IRON EMISSIONS For personal use only Emissions comparison (kg CO2 per tonne of liquid steel): Five drivers of the low emissions value-chain: • High-grade Athena magnetite: Low-energy beneficiation yields high grade feed using lower processing energy Production Route Emissions • Effici

  13. Slide 13: Recap

    Recap For personal use only Mid West Mid West Green Iron Mid West Green Green Iron Further Iron Expansion Expansion Narryer Demonstration Project Plant Development 12

  14. Slide 14: Athena Resources Limited contact details

    For personal use only Athena Resources Limited ASX: AHN Level 33, Yellagonga Tower 3, 1 Spring Street, WA 6000 Peter Jones | Managing Director +61 8 6285 0456 peter.jones@athenaresources.com.au www.athenaresources.com.au +61 400 741 948

  15. Slide 15: Mineral Resource Estimate

    Mineral Resource Estimate The MRE for FE1 Magnetite Project is shown below: FE1 Mineral Resource Estimate For personal use only Classification Mass Grade Fe Unit Mt % Indicated 24.0 25.1 Inferred 5.3 22.7 Total 29.3 24.7 The MRE for the Byro South Magnetite Project is shown below: Byro South Mineral

Athena Resources — Global Iron Ore and Steel Conference 2026 on 6ix