Greenwing Resources Ltd · ASX:GW1

Greenwing Resources — Jane Morgan Management Investor Lunch (Noosa) 2026

28 slides from Greenwing Resources's conference presentation, Jul 23, 2026

  1. Slide 1: Greenwing Resources Ltd. Investor Lunch

    Greenwing Resources Ltd. For personal use only Jane Morgan Management Investor Lunch 23rd July 2026 JULY 2026 ASX:GW1 www.greenwingresources.com Resources. People. El camino por Delante.

  2. Slide 2: Disclaimer

    Disclaimer This document has been prepared by Greenwing Resources Ltd ABN 31109933995 (the “Company”). It should not be considered as an invitation or offer to subscribe for or purchase any securities in For personal use only the Company or as an inducement to make an invitation or offer with respec

  3. Slide 3: Disclaimer: Competent Person Statement

    Disclaimer COMPETENT PERSON STATEMENT The information in this document that relates to Exploration Results, Exploration Targets and Mineral Resources in relation to the Madagascan Projects is based on information previously released to ASX, For personal use only particularly noting the information r

  4. Slide 4: Why Greenwing: Strategy and Project Updates

    San Jorge Lithium Brine Project • Appointment of leading brine field services company Zelandez(14). WHY GREENWING: • Commencement of a scoping study with Zelandez to define development pathways, processing options, and an initial economic framework(17). • An updated model of subsurface brine deliver

  5. Slide 5: Why Greenwing: Positioned for the next phase of lithium demand

    WHY GREENWING: For personal use only The global build-out of Artificial Intelligence (AI), data centres and associated energy infrastructure is reshaping demand for lithium and graphite and will define the next decade. Rapid growth in stationary energy storage is creating a second major demand pilla

  6. Slide 6: Data Infrastructure Drives the Next Decade of Demand

    DATA INFRASTRUCUTURE DRIVES THE NEXT DECADE OF DEMAND AI, Data Infrastructure and Stationary Energy Storage are reshaping global lithium demand. For personal use only Electric Vehicles: The First Wave Stationary Storage Forecast 1 Long-Term Supply Deficits 2 For over a decade, EV adoption has underp

  7. Slide 7: $40M Market Capitalisation, 100% Ownership of Three Strategic Assets

    $40M MARKET CAPITILISATION 100% OWNERSHIP OF THREE STRATEGIC ASSETS • For personal use only Greenwing owns all three projects within a $40m market cap. • Each asset represents a unique opportunity for value creation through focused development, established resources, and innovative pathways to marke

  8. Slide 8: Critical Minerals Objectives 2026: San Jorge and Graphmada

    SAN JORGE PROJECT OBJECTIVES 2026 CRITICAL MINERALS 2026 •Appointment of Zelandez to assist with the development of San Jorge. For personal use only • Greenwing is encouraged by improving sentiment toward lithium and •Complete Scoping study incorporating updated Mineral Resource Estimate and metallu

  9. Slide 9: Strategic Review of Assets

    STRATEGIC REVIEW OF ASSETS 01 • Greenwing now has a funded pathway to better define and realise value across three advanced assets. • Following completion of the capital raising, the Company is debt free and better positioned to advance priority studies and work programs. • Current market capitalisa

  10. Slide 10: Greenwing Resources Board & Management

    GREENWING RESOURCES BOARD & MANAGEMENT A HIGHLY CREDENTIALED TEAM WITH SIGNIFICANT CRITICAL MINERALS EXPERIENCE For personal use only JAMES BROWN PETER WRIGHT JEFF MARVIN Non-Executive Chairman Managing Director Non-Executive Director 35 years of global mining experience and 25 years' experience in

  11. Slide 11: San Jorge Lithium Brine Project, Argentina

    For personal use only SAN JORGE LITHIUM BRINE PROJECT, ARGENTINA 11

  12. Slide 12: San Jorge Project: Scoping Study Underway with Zelandez

    SAN JORGE PROJECT: SCOPING STUDY UNDERWAY WITH ZELANDEZ Greenwing has appointed Zelandez Limited, a globally recognised lithium brine management company, to support advancement of the San Jorge Project(14). For personal use only Current work is focused on: • Delivery of an initial scoping study • As

  13. Slide 13: San Jorge Project: Scale Potential

    SAN JORGE PROJECT: SCALE POTENTIAL Geological modelling indicated the brine system extends well beyond previous drilling limits, remaining open laterally and at depth. For personal use only Section east west looking north, showing brine (in pink) north of the area drilled

  14. Slide 14: San Jorge Project: System Remains Open

    SAN JORGE PROJECT: SYSTEM REMAINS OPEN Subsurface modelling as part of the ongoing Scoping Study indicated the current resource may represent only the initial definition of a much larger system(18). For personal use only Section north south, looking west through the project, showing drilling and Sec

  15. Slide 15: San Jorge Lithium Project Argentina

    SAN JORGE LITHIUM PROJECT ARGENTINA • 100% ownership of 15 granted exploration licences covering the entire salar (~2,800 hectares) as part of a broader consolidated landholding of approximately 38,000 hectares. For personal use only • Maiden Mineral Resource of 1.07Mt LCE at 195mg/L Li established

  16. Slide 16: San Jorge Lithium Project: Resource & Upside

    SAN JORGE LITHIUM PROJECT: RESOURCE & UPSIDE Maiden Mineral Resource Estimate(1): 1.07Mt LCE at 195mg/L Li comprising 670,000t Indicated and 400,000t Inferred. Initial 6-hole drilling program confirmed lithium brine in all holes, with holes ending in mineralisation and the system For personal use on

  17. Slide 17: Graphmada Graphite, Madagascar

    For personal use only GRAPHMADA GRAPHITE, MADAGASCAR 17

  18. Slide 18: Graphmada Graphite Mining Complex

    GRAPHMADA GRAPHITE MINING COMPLEX Graphite Resource with successful production history and expansion potential For personal use only • Graphite, a critical mineral for lithium-ion batteries, holds “critical status” from the EU, USA, and Japan. • China currently dominates global graphite supply and h

  19. Slide 19: Graphmada: Established & Growing Resource

    GRAPHMADA GRAPHITE MINING COMPLEX: ESTABLISHED & GROWING RESOURCE Extensive mineralisation from Lohorano in the north to Ambatofafana in the south, with Mineral Resource of 61.9Mt at 4.5% FC, total contained graphite of over 2.7 Mt(2) For personal use only CONTAINED TONNES (MT) FC% GRAPHITE (KT) Mea

  20. Slide 20: Green River Resources, Que River, Tasmania

    For personal use only GREEN RIVER RESOURCES 20 QUE RIVER, TASMANIA

  21. Slide 21: Que River: Updated Strategy & Value Realisation Pathway

    QUE RIVER: UPDATED STRATEGY & VALUE REALISATION PATHWAY Greenwing is advancing the Que River Project as a standalone value opportunity alongside the broader critical minerals portfolio. The Company has now commenced a Pre-Feasibility Study to build on the updated Mineral Resource(3), the scoping stu

  22. Slide 22: Que River: Strategic Objectives 2026

    QUE RIVER: STRATEGIC OBJECTIVES 2026 For personal use only • Identify and progress best pathway for separation of Que River asset from the Critical Minerals assets. • Further studies to further refine pit design and OBJECTIVES economics. FOR 2026 • Refine economics on proposed third party processing

  23. Slide 23: Que River Project, Tasmania

    QUE RIVER PROJECT, TASMANIA • Que River is a high-grade polymetallic VMS deposit in Tasmania's Mount Read Volcanics, immediately adjacent to major mining and processing infrastructure. For personal use only • The project is under mining lease (recently renewed to 2035(19)) and provides exposure to c

  24. Slide 24: Que River Project, Tasmania Mineral Resource

    QUE RIVER PROJECT, TASMANIA MINERAL RESOURCE SUMMARY MINERAL RESOURCE ESTIMATE(3) Zn Pb Cu Au Ag Density ZnEq For personal use only kt Resource Location Classification % % % g/t g/t t/m3 % UG Indicated 1,618 2.9 1.4 0.34 0.77 47 3.30 9.0 underground Inferred 329 3.6 1.8 0.34 0.69 48 3.33 9.7 subtota

  25. Slide 25: Greenwing Resources 2026: Funded to Deliver Value

    GREENWING RESOURCES 2026: For personal use only FUNDED TO DELIVER VALUE GREENWING CRITICAL MINERALS With the capital raising completed, Greenwing is 1 now funded to advance the key studies and work programs expected to better define value across the Complete scoping study at San Jorge, continue proc

  26. Slide 26: Get In Touch

    Greenwing Resources Ltd. Get In Touch Company Details Peter Wright | Managing Director Greenwing Resources Ltd | ABN 31 109 933 995 ASX:GW1 E. peter@greenwingresources.com For personal use only www.greenwingresources.com M. 0404 945 189 Resources. People. El camino por Delante.

  27. Slide 27: References

    REFERENCES (1) ASX ANNOUNCEMENT DATED 27 MAY 2024 ‘SAN JORGE LITHIUM BRINE PROJECT – MAIDEN MINERAL RESOURCE ESTIMATE’ (2) ASX ANNOUNCEMENT DATED 12 JULY 2022 - ‘212% INCREASE IN GRAPHITE RESOURCE AT GRAPHMADA MINING COMPLEX’. REPORTED IN ACCORDANCE WITH THE 2012 AUSTRALASIAN CODE FOR REPORTING OF E

  28. Slide 28: Appendix: Que River Zinc Equivalent Calculations

    APPENDIX 1 QUE RIVER ZINC EQUIVALENT CALCUATIONS The Mineral Resource outlined on slide 15 is reported at a 5% ZnEq cut-off where: ZnEq = Zn + 0.7 Pb +2.1 Cu +0.04 Ag + 3.3 Au Que River is predominantly considered a zinc-lead mine, however considerable value is associated with gold andsilver grades

Greenwing Resources — Jane Morgan Management Investor Lunch (Noosa) 2026 on 6ix