Miramar Resources Limited · ASX:M2R

Miramar Resources — Investor Presentation (August 2026)

27 slides from Miramar Resources's investor presentation, August 2026

  1. Slide 1: Maiden Gold Resource at Gidji JV

    Miramar Resources Maiden Gold Resource at Gidji JV Company Update August 2026

  2. Slide 2: Disclaimer/Competent Person Statement

    Disclaimer/Competent Person Statement Forward-Looking Statements Statements in this presentation which are not statements of historical facts, including but not limited to those relating to the proposed transactions, are forward-looking statements. These statements instead represent management's cur

  3. Slide 3: Disclaimer/Competent Person Statement

    Disclaimer/Competent Person Statement Competent Person Statement The information in this report that relates to Exploration Targets or Exploration Results is based on information compiled by Allan Kelly, a “Competent Person” who is a Member of The Australian Institute of Geoscientists. Allan Kelly i

  4. Slide 4: Investment Highlights

    Investment Highlights Multiple shallow gold Resources outlined at the Gidji JV Project Aiming to become a self-funded explorer through development of the Gidji JV and/or Glandore Gold Projects in the Eastern Goldfields region of WA Exploring for large copper deposits in the Gascoyne region of WA Ref

  5. Slide 5: Gidji JV Gold Project (80%)

    GIDJI JV GOLD PROJECT 8 Mile Dam Gidji JV Gold Project (80%) Multiple shallow gold Resources in a prime location Mt Charlotte Kalgoorlie Super Pit 5

  6. Slide 6: The cheapest house in the best street!

    The cheapest house in the best street! ✓Multiple shallow gold Resources 15km north of Kalgoorlie and adjacent to the Goldfields Highway ✓Surrounded by majors (NST, Norton, Evolution) and within 15km of three gold processing plants ✓15km strike of the Boorara Shear Zone ✓Multiple supergene and bedroc

  7. Slide 7: Multiple shallow Inferred Resources

    Multiple shallow Inferred Resources Inferred Target Tonnes Au Oz t g/t Pit 1 Highway 359,938 0.89 10,309 Pit 2 Powerline 103,719 1.09 3,644 Pit 3 Pipeline 60,281 1.42 2,743 Pit 4 Marylebone Far North 53,250 0.73 1,251 Pit 5 Blackfriars 63,906 1.19 2,435 Pit 6 Marylebone North 35,656 1.03 1,186 Pit 7

  8. Slide 8: Shallow ounces

    Shallow ounces August 2026 OK Mineral Resource Estimate (0.2 g/t Au Cut-off) Bench Total Mineral Resource (0.2 g/t Cut-off) Top Tonnes Au Au Per Vertical Metre mRL t g/t Ounces Tonnes Au Ounces 325 782 0.43 11 156 2 320 14,761 0.51 242 2,952 48 315 1,000 0.93 30 200 6 310 8,784 1.35 380 1,757 76 305

  9. Slide 9: Resource growth potential

    Resource growth potential • Limited deep drilling to date – average depth <60m • Four key pathways for Resource growth 1. Convert existing Block Model ounces to Resources 2. Bedrock mineralisation beneath Open Pit Resources 3. Supergene mineralisation outside the Paleochannel 4. Untested bedrock tar

  10. Slide 10: Lack of deeper drilling = significant exploration upside

    Lack of deeper drilling = significant exploration upside 10

  11. Slide 11: Highway

    Highway • Porphyry intrusion in Black Flag Beds • Shallow gold mineralisation over 900m strike • 3m @ 9.45g/t Au • 3m @ 3.78g/t Au • 2m @ 3.06g/t Au • 8m @ 0.77g/t Au • 4m @ 1.56g/t Au • 4m @ 1.07g/t Au • 3m @ 0.87g/t Au • 3m @ 1.13g/t Au • 1m @ 2.50g/t Au • Pathfinder anomalism and alteration • Bas

  12. Slide 12: Marylebone and Powerline

    Marylebone and Powerline • Marylebone - 1.2km of intersections >1g/t Au • 1m @ 11.0g/t Au • 7m @ 1.93g/t Au • 3m @ 3.33g/t Au • 2m @ 2.03g/t Au • 6m @ 1.56g/t Au • 3m @ 1.16g/t Au • 6m @ 1.03g/t Au (EOH) • Powerline - 1km strike of intersections >2g/t Au • 2m @ 7.70g/t Au • 2m @ 2.72g/t Au • 1m @ 2.

  13. Slide 13: 8-Mile

    8-Mile • 8-Mile Target • Mineralisation offset by faulting NW SE • EMD0028 – 6.3m @ 7.63g/t Au • GJDD002 – 1m @ 2.79g/t Au • GJRC029 8-Mile Target • 3m @ 2.67g/t Au from 243m (M2R) • 18m @ 0.94g/t Au from 480m (incl. 4m @ 2.83g/t Au) 8 Mile Dam • 3m @ 0.52g/t Au from 501m (314koz) to EOH (NST) • 8 M

  14. Slide 14: The Jog

    The Jog • Major dilational jog in the Boorara Shear Zone • Same structural event that formed the Golden Mile deposits • Large 3.5mgal gravity anomaly = potential intrusion THE JOG • Magnetite destruction = potential alteration +/- gold mineralisation • Drilling planned following heritage approval •

  15. Slide 15: Lake

    Lake • 600m strike length of gold mineralisation along strike from 30koz “Gidji Dam” gold deposit • Historic RC drilling • 2m @ 5.32g/t Au • 3m @ 3.6g/t Au • 4m @ 2.78g/t Au • 3m @ 4.15g/t Au • 1m @ 1.0g/t Au (aircore hole EOH) • Flexure in felsic intrusive unit • Arsenic anomalism in structure • RC

  16. Slide 16: Next Steps - Pathway to development

    Next Steps - Pathway to development Shallow targets Bedrock targets Railway Piccadilly Resource Drilling Lake Roaster Road Claypan Development Highway 8-Mile Blackfriars Maiden The Jog Powerline Resource Marylebone Mining Lease Application Development discussions Permitting 16

  17. Slide 17: Glandore Gold Project

    Glandore Gold Project High-grade gold close to Kalgoorlie 17

  18. Slide 18: Glandore

    Glandore • Located 40 km from Kalgoorlie - close to existing/proposed processing plants • Narrow high-grade gold intersections at Glandore East • 6m @ 29.8g/t Au (historic hole) • 0.7m @ 13.9g/t Au • 0.8m @ 5.91g/t Au • 0.8m @ 12.6g/t Au • 0.4m @ 18.0g/t Au • Geophysical surveys map additional NE-tr

  19. Slide 19: Gascoyne Projects

    Gascoyne Projects Targeting large copper deposits 19

  20. Slide 20: Gascoyne Projects - Multiple Large Discovery Opportunities

    Gascoyne Projects - Multiple Large Discovery Opportunities Whaleshark • Large Cu-Au targets under ~100m of basin sediments • Copper sulphides and IOCG-style alteration • EIS co-funding for aircore drilling of magnetic/gravity targets Chain Pool • High-grade Cu-Pb-Ag mineralisation with SEDEX-style a

  21. Slide 21: Whaleshark (Cu-Au)

    Whaleshark (Cu-Au) • Proterozoic BIF and granite under shallow basin sediments - depth to basement ~ 100m • IOCG-style alteration and geochemical anomalism in soils and aircore drilling • Copper sulphides intersected in EIS co- funded diamond drilling • Remodelling of magnetic data highlights multip

  22. Slide 22: Chain Pool (Cu-Pb-Ag +/- Zn-Ba)

    Chain Pool (Cu-Pb-Ag +/- Zn-Ba) Joy Helen • High-grade Cu-Pb-Ag occurrence at edge of Edmund Basin • Rock chips up to 5.49% Cu, 54.5% Pb and 73.5g/t Ag • Soil sampling outlines large SEDEX-style alteration halos • Shallow auger drilling results up to 0.1% Cu and 0.8% Pb • Detailed gravity highlights

  23. Slide 23: Bangemall (Cu-Ni-PGE’s)

    Bangemall (Cu-Ni-PGE’s) • First mover in a new Cu-Ni-PGE province • Norilsk-style Cu-Ni-PGE mineralisation hosted in 1070Ma dolerite sills • EIS co-funded VTEM survey highlights multiple large EM conductors • Next steps • Rock chip sampling and ground EM over VTEM anomalies • Drilling 23

  24. Slide 24: Company Snapshot

    Company Snapshot Jono Fisher Non-Exec Chairman Degrees in Law, Finance and Commerce 20 years’ experience in resources and corporate CEO of Cauldron Energy (ASX) and Non- Executive Director of APC Minerals Graduate of the Australian Institute of Company Directors (AICD) and fellow of FINSIA Mark Hanl

  25. Slide 25: Summary – Investment Case

    Summary – Investment Case Gascoyne Track Record Projects • Board track record of • Potential for discovery, “company-maker”- development and sized discoveries production. Gidji JV Project Near-term • Advancing a new catalysts gold camp in a Tier-1 • Gidji Resource location • Chain Pool drilling • Po

  26. Slide 26: T: + 61 8 6166 6302 | E: info@miramarresources.com.au

    T: + 61 8 6166 6302 | E: info@miramarresources.com.au

  27. Slide 27: Relevant ASX Announcements

    Relevant ASX Announcements Date Title 20 August 2026 Maiden Gold Resources Outlined at Gidji JV 23 July 2026 Auger Results Upgrade Chain Pool Drill Target 13 July 2026 High-Grade Copper-Lead-Silver Results from Chain Pool 29 June 2026 Significant Increase to Gidji JV Gold Exploration Target 25 June

Miramar Resources — Investor Presentation (August 2026) on 6ix