Bpm Minerals Ltd. · ASX:BPM

Bpm Minerals — Investor Presentation (September 2026)

15 slides from Bpm Minerals's investor presentation, September 2026

  1. Slide 1: A major gold system, a major gold discovery in the making

    A major gold system, a major gold discovery in the making Forelands Gold Project + Bonnie & Clyde Unlocked September 2026 | bpmminerals. com ASX:BPM | bpmminerals.com

  2. Slide 2: Disclaimer

    IMPORTANT INFORMATION Disclaimer COMPETENT PERSON’S STATEMENT This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction nor a securities recommendation. The information in this presentation is an overview and does not contain all information necess

  3. Slide 3: Capital Structure and Board of Directors & Senior Management

    CORPORATE OVERVIEW Capital Structure Board of Directors & Senior Management 133.4M Shareholder OLIVER JUDD GREG SMITH Shares on Issue Breakdown Chief Executive Officer Non-Executive Director 37.5M Board and Management ~7% An exploration geologist with more than 17 years’ experience in precious and b

  4. Slide 4: The Forelands Gold Project

    The Forelands Gold Project 20,000M DRILLING CAMPAIGN COMMENCED AUGUST 2026 – THE LARGEST EXPLORATION PROGRAM IN THE COMPANY’S HISTORY 630 km² landholding on the Yilgarn Craton–Albany Fraser Orogen margin Located ~150 km east of Kalgoorlie, on the Trans-Access Road, near multiple operating and propos

  5. Slide 5: Drilling underway at Forelands

    FORELANDS GOLD PROJECT Drilling underway at Forelands First drilling at Beachcomber in over 15 years: Originally discovered in 2006 by Anglo Gold Ashanti with the last holes drilled in 2008. Considered the primary exploration target after Tropicana by AGA at the time. Two BPM RC programs since acqui

  6. Slide 6: The Right Rocks

    FORELANDS GOLD PROJECT The Right Rocks Tier-1 geological setting Similar tectonic setting to AngloGold Ashanti’s Tropicana: Geological setting is directly analogous to Tropicana (7.89Moz @ 2.08 g/t)1 and Hercules (71koz @ 4.8g/t)2 just 220km away Genuine Tier-1 structural architecture: Forelands and

  7. Slide 7: Footprint of a Major Gold System

    FORELANDS GOLD PROJECT Footprint of a Major Gold System Beachcomber was the first target tested – now a major gold system consisting of multiple mineralised lodes. A pipeline of quality exploration targets spanning 75km of strike within a largely untouched, district scale land holding. • Bonnie & Cl

  8. Slide 8: Bonnie & Clyde – The Next Tropicana?

    FORELANDS GOLD PROJECT Bonnie & Clyde – The Next Tropicana? • Maiden 10,000m, 65-hole Reverse Circulation (RC) drilling program commenced September 2026. • Untested >6km long gold in soil anomaly with several coherent zone of >100ppb Au anomalism • Comparable footprint to other major Proterozoic gol

  9. Slide 9: Bonnie & Clyde geological and structural setting

    FORELANDS GOLD PROJECT Regionally - The Forelands Project is spatially located at the confluence of two major trans-lithospheric structures, the Yellow Dam Shear Zone and the Houtanui Shear Zone, a favorable site for large mineralisation events. Scale and Tenor of the Soil Anomaly – A >6km soil anom

  10. Slide 10: Bonnie & Clyde

    FORELANDS GOLD PROJECT Bonnie & Clyde WA’s most compelling untested exploration target The kind of target geologists spend careers chasing. ASX: BPM | bpmminerals. com 10

  11. Slide 11: Beachcomber (Main Lode)

    FORELANDS GOLD PROJECT Beachcomber (Main Lode) High-Grade Shoot Extended to ~250m Depth Resource Definition Drilling Underway A high-grade gold bearing quartz vein with near-surface, visible gold Two RC programs completed (10,606m / 70 holes). Standout results: • FLRC007 – 9m @ 7.77 g/t Au from 75m,

  12. Slide 12: Beachcomber – Grown into a Major Gold System

    FORELANDS GOLD PROJECT Beachcomber – Grown into a Major Gold System New Gold Lodes Discovered at All Targets Tested Significant gold mineralisation intersected at all four targets tested in the Phase 2 RC program Detailed soil sampling survey6 defined the targets – drilling has now confirmed a large

  13. Slide 13: Pipeline of Targets

    FORELANDS GOLD PROJECT Pipeline of Targets Pipeline of exciting exploration targets for testing through 2027 and beyond along the ~70km of highly fertile Yellow Dam Shear zone: Structural Targets Sidecar Soil Sampling Results • Dr Barry Murphy Structural Targets4 – Intersections of Yellow Dam Shear

  14. Slide 14: 20,000m Drilling Campaign

    20,000m Drilling Campaign Beachcomber – Resource Definition: The program: Beachcomber priority targets: ~10,000m RC drilling program across the Main, 20,000m of RC drilling across Forelands – the High-grade plunging shoots at the Main and Central NW, Central and Fault lodes – the drill density large

  15. Slide 15: Contact Information

    Contact Information Oliver Judd Chief Executive Officer E oj@bpmminerals.com P +61 402 811 867 Corporate Presentation September 2026 ASX:BPM | bpmminerals.com Key ASX Announcements 1. BPM ASX Announcement – Acquisition of High-Grade Forelands Gold Project (WA) (7th July 2025) 2. BPM ASX Announcement

BPM Minerals — Investor Presentation (September 2026) on 6ix