Australis Oil & Gas Ltd. · ASX:ATS

Australis Oil & Gas — Investor Presentation (February 2019)

44 slides from Australis Oil & Gas's investor presentation, Feb 15, 2019

  1. Slide 1: Early results from initial drilling program validate value of large undeveloped oil position

    Early results from initial drilling program validate value of large undeveloped oil position Equity Raising Presentation 15 February 2019 ASX: ATS

  2. Slide 2: Important Notice and Disclaimer

    Important Notice and Disclaimer This presentation has been prepared by Australis Oil & Gas Limited ACN 609 262 937 (ASX: ATS) (Australis). Summary of information: This presentation contains general and background information about Australis' activities current as at the date of the presentation and

  3. Slide 3: Transaction Overview

    Transaction Overview Executive Summary Tuscaloosa Marine Shale (TMS) Portugal Appendix

  4. Slide 4: Equity Raising Overview & Timetable

    Equity Raising Overview & Timetable Australis is considering an equity raising of up to approx. US$21.6 million (A$30.5 million) through a private placement to existing and new investors ▪ Australis is seeking to place new equity to raise up to approximately Indicative Financing Timetable US$21.6 mi

  5. Slide 5: Australis Indicative Capital Structure

    Australis Indicative Capital Structure Indicative capital structure assuming US$21.6m raised via equity placement Shares Options Ownership % Shares and Options (millions) (millions)(A) Pre options Post Options On Issue: - Directors & Management 101.5 87.9(B) 10.3% 17.0% - Existing Shareholders 794.5

  6. Slide 6: Executive Summary

    Transaction Overview Executive Summary Tuscaloosa Marine Shale (TMS) Portugal Appendix

  7. Slide 7: Investment Highlights

    Investment Highlights Large undeveloped TMS oil position with proven economics and multiple near term upside catalysts ▪ Asset is focused in production delineated core of the TMS Operator of Quality ▪ First well in Australis drilling program under budget and materially outperforming type curve Asset

  8. Slide 8: Corporate Overview

    Corporate Overview Existing reserves, production and revenue with an institutionally supported register ▪ Founded in 2014 with significant capital contribution by the founders & key management of Aurora Oil & Gas, Capital Structure (Feb 2019)(A) listed on the ASX in July 2016 (ASX:ATS). Ordinary Sha

  9. Slide 9: Australis TMS Land Position

    Australis TMS Land Position During 2018 Australis has increased and extended the life of its ‘core’ land position Australis TMS Position Australis TMS Map Land Position Jan 19 Jan 18 HBP (acres) 31,400 27,600 Total Core Area (net acres only 110,000 95,000 within core area) Future Net Well 410 350 Lo

  10. Slide 10: Initial Drilling Program – Objectives & Results

    Initial Drilling Program – Objectives & Results Initial well program seeks to demonstrate value proposition by repeating historical well performance at updated cost base. TMS Type Curve Wells ▪ Key objectives of TMS Drilling Program: ✓ Repeat historical well performance at updated cost base ✓ Demons

  11. Slide 11: Initial Drilling Program Results – Stewart 30H-1

    Initial Drilling Program Results – Stewart 30H-1 Australis’ first new well materially outperforming the TMS Type Curve Cumulative Oil Production: Stewart 30H-1 v TMS Type Curve ▪ Commenced oil production on 30 December 2018 40,000 Stewart 30H-1: ▪ Stewart 30H-1 IP30 average is 35,000 35,302 bbls Cum

  12. Slide 12: Initial Drilling Program – Status – Early February

    Initial Drilling Program – Status – Early February All drilling and completion operations have been executed without any reportable safety or environmental incidents Drilling Operations Summary Running Casing on Stewart 30H-1 Well Status ▪ Lateral length drilled of 6,900ft, completed 20 stages - $10

  13. Slide 13: Initial Drilling Program – Costs and Schedule

    Initial Drilling Program – Costs and Schedule Extensive planning delivering on-time and on-budget program ▪ The drilling and completion timetable is ahead of schedule and costs are currently under budget - Well D, C & T cost for Stewart 30H-1 is US$10.3 million - Bergold 29H-2 well D, C & T cost ant

  14. Slide 14: Pathway to Value

    Pathway to Value TMS Core acreage has multiple catalysts to realise and increase value Value Catalysts Single Well Economics - Pre-tax NPV10 (US$ in millions) ▪ Type curves conservatively based on $3.4 $14.1 Well historical average well productivity Performance ▪ Technology improvements over last 4

  15. Slide 15: Significant Underlying Value

    Significant Underlying Value Australis continues to add oil inventory on a highly accretive basis ▪ Australis’ business strategy to accumulate Evolution of Oil Reserves and Resources(1) ‘oil in the ground’ reflected in our substantial reserves and resources 197 MMbbl 200 growth since IPO ▪ Considere

  16. Slide 16: Tuscaloosa Marine Shale (TMS)

    Transaction Overview Executive Summary Tuscaloosa Marine Shale (TMS) Portugal Appendix

  17. Slide 17: What is the TMS?

    What is the TMS? The TMS is an emerging shale play: its ‘core’ is comparable with other prolific unconventional plays in the US TMS Location ▪ Onshore basin - Louisiana and Mississippi. ▪ On trend with Eagle Ford Basin in Texas, similar depositional history and age. ▪ 80 horizontal wells were drille

  18. Slide 18: Australis TMS Well Performance

    Australis TMS Well Performance The 15 wells drilled in 2014/15 within Australis’ core acreage demonstrate significantly higher average productivity than the average of other TMS wells drilled in Mississippi Individual 24 Month Cumulative Production Per Well – TMS Mississippi4,5 Australis TMS 15 Well

  19. Slide 19: TMS Core Type Curve

    TMS Core Type Curve ATS type curve is history matched to production from the most recent 15 Mississippi ATS wells Total oil production per well initial, 24 months (mbbls) Production profiles (see appendix for full data set and analysis) 40,000 Produced oil volume (bbls) Lawson 25-13HA) 318 Stewart 3

  20. Slide 20: TMS Oil Productivity Compared to Permian

    TMS Oil Productivity Compared to Permian The average production from Australis’ TMS wells drilled in 2014 are significantly higher than Permian wells drilled in the same year. Industry improvements since 2014 have yet to be applied to the TMS Midland Basin Delaware Basin 200 200 Cumulative oil produ

  21. Slide 21: Capital Cost Profile of Early TMS Wells

    Capital Cost Profile of Early TMS Wells TMS well costs trending downwards over time in line with other plays ▪ The first well drilled and completed by Australis (Stewart 30H-1) cost US$1,503 /ft which is the lowest cost per foot well drilled in the TMS to date ▪ Other play participants have quoted U

  22. Slide 22: Well Cost Overview

    Well Cost Overview The major US shale plays have seen significant cost declines, and initial costs from Australis’ current well program indicate this will be replicated in the TMS Comparable Plays Well Cost Trends10 ▪ TMS Drilling costs incurred prior to 2015 were already following the same trend as

  23. Slide 23: Austin Chalk Trend

    Austin Chalk Trend Following recent EOG well results, there is significant activity in the South West targeting Austin Chalk Austin Chalk Trend ▪ EOG drilled the Eagles Ranch 14H-1 well during Q3 2017 ‐ Public data indicates liquids rich production ‐ Well performance on par with Australis TMS type c

  24. Slide 24: Portugal

    Transaction Overview Executive Summary Tuscaloosa Marine Shale (TMS) Portugal Appendix

  25. Slide 25: Portugal Concessions Overview

    Portugal Concessions Overview Australis owns two concessions onshore Portugal with significant development potential Asset Highlights Asset Location Significant Gas ▪ Large in-place discovered and tested gas Resource accumulation with 2C resources of 458 Bcf2 ▪ Limited exploration activity but regul

  26. Slide 26: Portugal Prospectivity & Volumetrics

    Portugal Prospectivity & Volumetrics Appraisal of a gas discovery with multiple nearby prospects and leads with a significant resource base Proposed Work Program Batalha Gas Discovery Batalha Concession Prospects ▪ Drill and test the gas discovery with a vertical well ▪ Drill and core a deep Lamede

  27. Slide 27: Portugal Concessions Status

    Portugal Concessions Status Australis is working with Portuguese Authorities to achieve the necessary regulatory approvals to commence exploration and appraisal activity Work Program to Date ▪ Australis has completed a number of detailed subsurface engineering studies to review historical data and e

  28. Slide 28: Appendix

    Transaction Overview Executive Summary Tuscaloosa Marine Shale (TMS) Portugal Appendix

  29. Slide 29: Directors & Management

    Directors & Management Demonstrated track record in oil & gas John Stewart Ian Lusted Darren Wasylucha Non-Executive Chairman Managing Director & CEO Chief Corporate Officer ▪ >25 years in the upstream oil and gas industry ▪ >25years in the upstream oil & gas industry ▪ Former Executive VP Corporate

  30. Slide 30: TMS Core Type Curve

    TMS Core Type Curve Summary of monthly oil production data for the most recent 15 Encana drilled, ATS operated modern offset Mississippi wells Lewis 7- Pintard Lyons Pintard Longleaf Longleaf Mathis Mathis Lawson Ash 13H Sabine Sabine McIntosh Reese Stewart Well Name Ash 13H 2 Average Cumulative 18H

  31. Slide 31: Single Well TMS Core Type Curve

    Single Well TMS Core Type Curve ATS type curve is history matched to production from the most recent 15 Mississippi wells (drilled by ECA, operated by ATS) TMS Core TC – Assumptions TMS Core Type Curve v TMS Production 250,000 ▪ Oil EUR – 610 Mbbls ▪ Gas EUR – 159 MMscf 200,000 ▪ NGL EUR – 20 Mbbls

  32. Slide 32: TMS Value Potential

    TMS Value Potential 410 future net well locations with strong economics Single Well Economics and Sensitivities – Pre-tax NPV10 (US$ in millions) $11 million/well $10 million/well $9 million/well $14.1 $13.2 $12.2 $4.0 $4.0 $10.7 $4.0 $9.7 $8.8 $3.5 $3.5 $7.2 $3.5 $6.3 $5.3 $2.9 $2.9 $10.1 $9.1 $3.0

  33. Slide 33: Single Well Economics – IRR Sensitivities

    Single Well Economics – IRR Sensitivities 410 future wells with attractive return profile Single Well Economics and Sensitivities – Pre-tax IRR D, C & T $11 MM/well D, C & T $10 MM/well D, C & T $9 MM/well 113% 89% 79% 71% 62% 73% 49% 51% 57% 40% 51% 46% 31% 39% 31% 32% 24% 19% $50 $60 $70 $50 $60 $

  34. Slide 34: TMS Base Case Economics – Key Assumptions

    TMS Base Case Economics – Key Assumptions The production and opex assumptions are based on history and the capex costs are current third party service providers’ estimates Base Case Assumptions* Production Forecast EUR (30 Years) 30,000 700,000 Gas 0.16 Bcf Oil/Condensate 610 Mbbl 25,000 600,000 Pro

  35. Slide 35: Reserves and Resource Update

    Reserves and Resource Update Australis continues to grow reserves and resources ▪ As an ASX participant Australis reports to the TMS Reserves & Resource Estimates1 SPE PRMS which requires any undeveloped Net Oil reserves, that are to be assessed for reserves 2018 Ryder Scott Reserves Estimate (MMbbl

  36. Slide 36: Financial & Operational Summary

    Financial & Operational Summary Field Cashflow financing overhead and land capex program in 2018 Key Financial Metrics - 2018 Sales Volumes (WI – before royalties) 506,000 bbls Realised Price US$68.80 Sales Revenue US$35 million Field Netback US$16 million Cash as at 31 December 2018 US$38 million P

  37. Slide 37: TMS Crude Oil Price

    TMS Crude Oil Price The premium pricing of LLS to other onshore US crude benchmarks is becoming increasingly more attractive Crude Oil Spot Price, Daily Settlement, US$/bbl ▪ Because of the proximity of Australis’ wells to the St. James Oil Terminal in Louisiana and the high quality of the crude pro

  38. Slide 38: Option Terms Summary

    Option Terms Summary Cash payable on Grant dates Exercise Price (A$) Vesting Expiry Number exercise (A$) Directors, Executives & Management 13 Nov 2015 $0.25 Vested 31 Dec 2020 19,500,000 $4,875,000 13 Nov 2015 $0.30 (Series A) Vested 31 Dec 2020 27,600,000 $8,280,000 28 Apr 2016 $0.30 (Series B) Ve

  39. Slide 39: Footnotes

    Footnotes 1. All estimates and risk factors taken from Ryder Scott, report prepared as at 31 December 2018 and generated for the Australis concessions to SPE standards. See ASX announcement released on 6 February 2019 titled “Reserves and Resources Update Year End 2018”. The analysis was based on a

  40. Slide 40: Glossary

    Glossary Unit Measure Unit Measure B Prefix - Billions bbl Barrel of oil MM or mm Prefix - Millions boe Barrel of oil equivalent (1bbl = 6 mscf) M or m Prefix - Thousands scf Standard cubic foot of gas /d Suffix - per day Bcf Billion standard cubic foot of gas Abbreviation Description TMS Core The A

  41. Slide 41: Risk Factors

    Risk Factors Investing in the placement involves inherent risks. Prospective investors should carefully consider, among other things, the risk factors set out below before making an investment decision. The list of risk factors is not exhaustive and there may be other risks relevant to Australis whi

  42. Slide 42: International Offer Restrictions

    International Offer Restrictions This document does not constitute an offer of new ordinary shares ("New Shares") of Statutory rights of action for damages and rescission Australis in any jurisdiction in which it would be unlawful. In particular, this document may not be distributed to any person, a

  43. Slide 43: International Offer Restrictions

    International Offer Restrictions United Kingdom Certain Canadian income tax considerations: Prospective purchasers of the New Shares Neither this document nor any other document relating to the offer has been delivered should consult their own tax adviser with respect to any taxes payable in connect

  44. Slide 44: International Offer Restrictions

    International Offer Restrictions Hong Kong Singapore WARNING: This document has not been, and will not be, registered as a prospectus This document and any other materials relating to the New Shares have not been, and under the Companies (Winding Up and Miscellaneous Provisions) Ordinance (Cap. 32)

Australis Oil & Gas — Investor Presentation (February 2019) on 6ix