Sqx Resources Limited · ASX:SQX

Sqx Resources — Investor Presentation (October 2025)

15 slides from Sqx Resources's investor presentation, Oct 28, 2025

  1. Slide 1: Investor Presentation

    Investor Presentation October 2025 SQX Resources Limited

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by SQX Resources Limited (“SQX” or the “Company”) foregoing from and in relation to such claims, damages, liability, costs and expenses. for information purposes only. It does not constitute an offer, invitation, solicitation, or recommendation with res

  3. Slide 3: Corporate Snapshot following acquisition of 80% AM6

    Corporate Snapshot following acquisition of 80% AM61 Capital structure Share Price Performance 0.25 8.0 Current shares on issue 39,062,500 7.0 Share Price ($/share) 0.2 Volume (m Shares) Key Metric 6.0 Shares issued at AGM (28 November 2025) 32,187,500 (AUD) 5.0 0.15 Shares on issue (post-completion

  4. Slide 4: SQX Resources Limited

    SQX Resources Limited High-grade precious metal portfolio in the USA Focused on advancing the bonanza-grade Williams Au-Ag Project in Montana and the Red Bird Au Project in Arizona, which are both wholly owned by AM6 Pty Ltd. The acquisition of 80% of AM6 is subject to shareholder approval at the Co

  5. Slide 5: Williams Au-Ag Project - Montana

    Williams Au-Ag Project - Montana  Last explored in the late 1980s with over 445m of exploration drives plus additional stopes and raises  Numerous multi-ounce bonanza grade Au- Ag zones which included 876 tonnes extracted from a stope grading 141.7g/t Au & 780g/t Ag  Large upside potential - 8 mi

  6. Slide 6: Williams Au-Ag

    Williams Au-Ag  Project area is significantly underexplored with only two of at least eight mineralised veins (Black Bear South and North) having seen any substantial historical work  The key Black Bear South Vein has been mapped for over 900m of strike at surface and remains open.  Numerous bona

  7. Slide 7: Williams Au-Ag: The Opportunity

    Williams Au-Ag: The Opportunity  Develop a forgotten very high-grade gold project in the USA.  Simple underground mining proposition.  Transport high-grade ore from the project for processing to flotation concentrate by existing nearby toll-mill or elsewhere in western USA (via rail). 7 Refer ASX

  8. Slide 8: Red Bird Au

    Red Bird Au  48 claims over epithermal vein, breccia & replacement mineralisation target formerly explored by Homestake Mining  Historical underground continuous chip- channel results include;  0m Level: 19.8m @ 2.3g/t Au & 10.7m @ 3.3g/t Au  17m Level: 10.7m @ 8.5 g/t Au inc. 4.6m @ 17.3g/t Au

  9. Slide 9: Red Bird Au

    Red Bird Au  SQX to target broader, larger tonnage potential for open- pittable mineralisation  Maiden 2,500m RC drill program scheduled for December 2025 Red Bird Mine long section highlighting main 30m level 9 Refer ASX Announcement “SQX Secures High-Grade USA Gold & Silver Projects” – 16 Octobe

  10. Slide 10: Red Bird Au – The Opportunity

    Red Bird Au – The Opportunity  Target a JORC MRE in and around the current workings.  Extend mineralisation at depth and along strike with geophysics and drilling.  Discover new mineralised zones – many regional prospects are known that have seen very little work. 10 Red Bird geology Refer ASX An

  11. Slide 11: Work programs

    Work programs Prospect Q4 2025 Q1 2026 Q2 2026 Q3 2026 Q42026 Williams - Au & Ag Oct1 Nov1 Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Underground sampling results Drill permitting EM geophysics Bulk underground sampling Drilling Red Bird - Au Surface & underground sampling results Surface m

  12. Slide 12: Proposed Exploration Plan

    Proposed Exploration Plan Williams Au-Ag October 2025 – May 2026 Detailed geological mapping and high-resolution surface geophysics to delineate priority targets for 2026 drilling.  Geological Mapping and Sampling - Underground and surface mapping, systematic channel sampling, and rock-chip samplin

  13. Slide 13: Proposed Exploration Plan

    Proposed Exploration Plan Red Bird October 2025 – May 2026: Fieldwork and Drilling Work at Red Bird will build on historical data through targeted surface and underground mapping, followed by an initial drill program in late 2025;  Geological Mapping and Sampling - Underground and surface channel s

  14. Slide 14: EPM 27257 - overview

    EPM 27257 - overview Strong prospectivity in attractive location  1 (+1) tenements, 2 prospects, one wholly-owned subsidiary  Prospective for porphyry gold/copper  Within the Esk Basin, a structure in the New England Fold Belt  Situated in an underexplored area containing ▪ Historical mines (Gym

  15. Slide 15: SQX RESOURCES LIMITED

    SQX RESOURCES LIMITED Registered Office 349 Hay Street, Subiaco WA 6008 General Enquiries info@sqxresources.com

SQX Resources — Investor Presentation (October 2025) on 6ix