  1. Slide 1: Berkut Minerals Limited Scandinavian Cobalt

    Berkut Minerals Limited Scandinavian Cobalt July 2017 Investor Presentation www.berkutminerals.com.au

  2. Slide 2: Investment Case

    Investment Case  Strategically located ethical cobalt projects in Scandinavia o Close to the expanding European electrical vehicle and battery markets o Cobalt-dominant, brownfields projects in historic cobalt mining districts  Low market capitalisation compared to peers: exceptional leverage o ~4

  3. Slide 3: Scandinavian Projects

    Scandinavian Projects  Granted rights to 100% of four cobalt prospective projects in in Sweden and Norway o Skuterud Project, Norway o Gladhammar and Tunaberg Projects, Sweden o 100% owned Lainejaur Nickel-Cobalt resource1 in Sweden  116km2 of granted licenses and applications  Excellent infrastr

  4. Slide 4: Skuterud Project | Norway

    Skuterud Project | Norway  Located 100km from Oslo port in Norway  Seven granted licences over the historic Skuterud Cobalt Trend, for ~19km2 o Dominant landholding position o Covers 6km of the Skuterud Cobalt Trend  Nearby historic Skuterud Mine: o Major source of cobalt in 19th century - then t

  5. Slide 5: Skuterud Project | Geology

    Skuterud Project | Geology  Cobalt related to meta-sedimentary, sulphide- rich schist zones, so-called ‘fahlbands’. o Fahlbands up to 30m wide containing cobalt, copper and gold o Mineralisation includes cobaltite, linnaeite, glaucodote, safflorite and skutterudite,  Cobalt-rich sulphide zones ass

  6. Slide 6: Extensive Historical Workings with Cobalt Mineralisation

    Extensive Historical Workings with Cobalt Mineralisation Workings at the nearby Skuterud Cobalt Mine – 600m south of Berkut’s tenements. Note the two parallel zones of mineralisation www.berkutminerals.com.au 6

  7. Slide 7: Lainejaur Ni, Co, Cu Project | Sweden

    Lainejaur Ni, Co, Cu Project | Sweden  Located at the north-west end of the renowned Skellefteå mineral belt o Only 15km from the industrial centre of Malä  41km2 Exploration Licence  Historical resource of 645Kt @ 1.3% Ni, 0.66% Cu and 0.09% Co1 o Contains high-grade massive and semi-massive nic

  8. Slide 8: Lainejaur Project | Geology

    Lainejaur Project | Geology  Hosted at the base of a lopolithic gabbro-diorite intrusion overlain by mafic intrusive with minor intercalated metasedimentary units and underlain by meta-basalts  Sulphides consist of pyrrhotite, pentlandite, gersdorffite and chalcopyrite  Open at depth - 1.5km nort

  9. Slide 9: Lainejaur Ni, Co, Cu Project | Sweden

    Lainejaur Ni, Co, Cu Project | Sweden www.berkutminerals.com.au 9

  10. Slide 10: Gladhammar Project - Sweden

    Gladhammar Project - Sweden  Located approximately 200km south of Stockholm  ~44km2 approved and pending licences  Major cobalt mine in Sweden from 1777 to 1892 o Reported historic mine grades of 1.25%-2% cobalt in 682t from 1888 to 1891 (end of mine) 3  Hand samples up to 0.25% cobalt; copper u

  11. Slide 11: Tunaberg Project - Sweden

    Tunaberg Project - Sweden  Approved licences of ~12km2  Located in southern Sweden, approximately 100km SW of Stockholm  Historic mining centre; copper mining during the 15th century and cobalt during the 18th century  Skarn hosted cobalt mineralisation dominated by cobaltite and oenite  Metal

  12. Slide 12: Exploration Timeline

    Exploration Timeline  Initial field assessment undertaken at Lainejaur, Gladhammar, and Tunaberg (Sweden)  ‘Boots on ground’ field work underway at Skuterud (Norway) o Meetings held with the Norwegian Geological Survey and Directorate of Mining o Field mapping underway o 200m spaced geophysical da

  13. Slide 13: Corporate Snapshot

    Corporate Snapshot Neil Inwood Share Price (21 July 2017)1 16 cents Managing Director  Highly experienced geologist with +22yrs international experience in gold, Shares on issue2 47.3M base metal & specialty metals  Experience in consulting and venture capital for the last 13yrs Options on issue3

  14. Slide 14: Why Cobalt?

    Why Cobalt?  Tipped by many analysts to be in short supply for many years to come; mostly produced as a by- product of Cu and Ni, which are both under-performing  Price pressure due to increased tech demand and supply constraints o Relatively low natural background concentration means cobalt is pr

  15. Slide 15: Cobalt Supply

    Cobalt Supply  60% of cobalt sourced from the Democratic Republic of the Congo  China is the main refiner of cobalt, buying from ethical and conflict zones, controlling over 40% of the worlds refining capacity  Unethical practices are not compatible with the values of large conglomerates such as

  16. Slide 16: Cobalt - Why Europe?

    Cobalt - Why Europe?  Countries in Europe are leading the world in uptake of Cobalt Fast Facts electric vehicles using lithium-ion batteries  4kg of Cobalt required for each hybrid car  6kg of Cobalt required for each electric car  12-13 million hybrid/electric vehicles expected by  Electric ve

  17. Slide 17: Contact Us

    Contact Us Neil Inwood, Managing Director neil@berkutminerals.com.au T: +61 8 9320 2320 78 Churchill Avenue Subiaco Western Australia 6008 www.berkutminerals.com.au www.berkutminerals.com.au

  18. Slide 18: Appendix A | Australian Projects

    Appendix A | Australian Projects www.berkutminerals.com.au 18

  19. Slide 19: Appendix B | Cairn Hill Gold Project

    Appendix B | Cairn Hill Gold Project  The Cairn Hill Gold Project is centered on a 200km long gold mineralised trend, stretching between Northern Star’s Paulsen’s Gold Mine and the Mt Olympus Deposit in the highly prospective Ashburton Region, Western Australia  Modern exploration at Cairn Hill co

  20. Slide 20: Disclaimer and Competent Person

    Disclaimer and Competent Person Disclaimer and Forward Looking Statements This presentation may contain certain forward looking statements and projections regarding:  estimated, resources and reserves;  planned production and operating costs profiles;  planned capital requirements; and  planned