Mining Americas Inc. · TSX:MAI

Mining Americas — Minera Alamos — Investor Presentation (November 2025)

21 slides from Mining Americas's investor presentation, November 2025

  1. Slide 1: The Creation of an Emerging U.S. Focused Gold Producer

    The Creation of an Emerging U.S. Focused Gold Producer TSX.V: MAI | OTCQX: MAIFF November 2025

  2. Slide 2: Forward Looking Statement & Cautionary Note

    Forward Looking Statement & Cautionary Note Cautionary Statement Regarding Forward Looking Statements This presentation contains “forward-looking information” within the meaning of applicable Canadian securities laws. Forward-looking information includes statements that use forward-looking terminolo

  3. Slide 3: Minera Alamos Overview

    Minera Alamos Overview The Creation of an Emerging U.S. Focused Gold Producer Investment Highlights Americas-Focused Portfolio Pan Mine Immediate Production and Cash Flow Potential Gold Rock – Immediate transition into multi-asset junior gold producer Copperstone – Pan production (~40koz Au per year

  4. Slide 4: Primary Gold Portfolio in the Americas

    Primary Gold Portfolio in the Americas Cornerstone Assets: Reinvesting Cashflows in Low-Capital, High Return Projects Pan Mine Copperstone Cerro De Oro Gold Rock Au | Operating Au | New Technical Study in-progress Au | PEA Au | PEA | Permitted Nevada, USA |Permitted Arizona, USA Zacatecas, MX Nevada

  5. Slide 5: Emerging Jr. Precious Metals Producer

    Emerging Jr. Precious Metals Producer Portfolio Highlights Production Potential (koz Au)4 Opportunity to increase production through exploration success Asset Pan Mine Copperstone Cerro de Oro Gold Rock 130-165 Updated study in- PEA PEA Stage Operating progress (permits pending) (permitted) (permitt

  6. Slide 6: Pan Operating Complex - Nevada Overview

    Pan Operating Complex - Nevada Overview Open-pit, conventional heap-leach assets Pan Mine Highlights Property Pan Mine Historical Results Nevada, USA – Located East Central Nevada, ~28 km SE of Eureka, along Battle 2021 2022 2023 2024 Mountain trend; 100% owned by Equinox Ore on Pad 2,900 3,030 4,59

  7. Slide 7: Pan Operating Complex Opportunities

    Pan Operating Complex Opportunities Stable Operation with Exploration Upside Pan Mine Resource Replacement (kt of material) P&P M&I – Mine restarted in 2017 (Fiore) 33,924 – 8 years of continuous production (35-40,000 oz/year) 27,275 14,381 – Proven history of resource conversion and replacement 8,2

  8. Slide 8: Pan Operating Complex Geology & Exploration Upside

    Pan Operating Complex Geology & Exploration Upside Highlights North and South high walls of EZ Junior Pit (Gold Rock Proj.) 2018 Fiore Gold drillhole locations (Gold Rock Proj.) – Gold Rock hosts Carlin-type mineralization in folded and faulted Paleozoic carbonate rocks, similar to major Nevada gold

  9. Slide 9: Copperstone Asset Overview

    Copperstone Asset Overview Acquired in 2025 – near-term development with low capex, quick build-period Location Map Project Highlights – Arizona, USA Location & Property: – 13.8 sq mile package (surface + mineral rights) – 19 miles north of town of Quartzite – Discovered in 1968; Acq. by MAI in Feb.

  10. Slide 10: Copperstone Gold Deposit Upside and Work Plan

    Copperstone Gold Deposit Upside and Work Plan Potential to significantly expand defined resource of 300koz indicated and 197koz inferred Upside Exploration Potential Open Pit: – First order priority is the projection to surface of the lower mineral zone, with potential to be an open pit; Followed by

  11. Slide 11: Copperstone Exploration

    Copperstone Exploration Copperstone Zone South-West Target | target historic cluster of high-grade Copperstone Zone | target downdip extension to intercepts for accretion of additional resource confirm mineralization extends to depth for accretion of resources. Along strike holes can convert resourc

  12. Slide 12: Cerro de Oro Asset Overview

    Cerro de Oro Asset Overview Location Map Project Highlights – Zacatecas, Mexico Location & Property: – 5 mining concessions covering 6,500 ha – 3km from town of Melchor Ocampo – Discovered in the 1500’s Milestones: – Acquired by Minera Alamos in 2020 – Conventional Open Pit – ROM heap leach – Mine L

  13. Slide 13: Cerro de Oro Asset Overview

    Cerro de Oro Asset Overview Exploration Overview – Gold only porphyry system with associated skarn zones - At least two mineralized porphyry phases. – Mineralization associated with porphyry type A/B quartz veinlets, potassic, and skarn alteration with magnetite, pyrite, and only traces of chalcopyr

  14. Slide 14: Competitive Positioning

    Competitive Positioning Poised for re-rating to Junior Producer Peer valuation multiples upon Acquisition + Execution Market Capitalization (US$B)1 2026E Au Production (koz)2,3 Consensus P/NAV (ratio)4 SSR Mining $5.0 SSR Mining 444 Wesdome 1.02x DPM Metals $4.9 Aris Mining 396 Discovery 1.00x G Min

  15. Slide 15: Cap Structure & Ownership

    Cap Structure & Ownership Capitalization (C$) Ownership Summary (% Basic S/O) Mgmt & High Share Price US$/sh. $0.26 Insiders Net worth Equinox Share Price C$/sh. $0.37 3% 2% FDITM Shares Msh. 1,078 Retail 9% Investors FDITM Market Capitalization US$M $283.1 42% (-) Cash US$M $27.9 (-) ITM Proceeds U

  16. Slide 16: Execute, Explore, Grow

    Execute, Explore, Grow Re-invest in Asset Pipeline, Optimize Portfolio for Growth Intermediate Producer Accretive M&A Maximize Shareholder Value through Executing Growth Strategy Exploration & Discoveries Potential to Improve Grade, Shareholder Extend Mine Life Value & Market Mid-tier Producer Devel

  17. Slide 17: Key Management & Board

    Key Management & Board Experienced Management Team – Mine and Company Builders Management Team Board of Directors Darren Koningen, P.Eng. Jason Kosec, B.Geo CEO Incoming Chairman, Director 30 years of engineering/ metallurgical experience, led El Castillo 15 years experience in mineral resources, fo

  18. Slide 18: Appendix

    Appendix TSX.V: MAI | OTCQX: MAIFF

  19. Slide 19: Reserves & Resources – Minera Alamos

    Reserves & Resources – Minera Alamos Tonnes Grade Contained Mt Au (g/t) Ag (g/t) Cu (%) Au (koz) Ag (koz) Cu (kt) Copperstone Measured 0.8 8.12 - - 196 - - Indicated 0.5 7.09 - - 104 - - Total M&I 1.2 7.74 - - 300 - - Inferred 1.0 6.30 - - 197 - - Santana Measured 6.5 0.65 - - 136 - - Indicated 3.1

  20. Slide 20: Reserves & Resources – Pan Mine and Gold Rock

    Reserves & Resources – Pan Mine and Gold Rock Tonnes Grade Contained Mt Au (g/t) Au (koz) Pan Mine Measured 0.1 0.47 1 Indicated 22.6 0.35 257 Total Resources 22.7 0.35 258 Inferred 1.1 0.34 12 Leach Pad Inventory - - 30 Gold Rock Project Measured - - - Indicated 19.0 0.66 403 Total Resources 19.0 0

  21. Slide 21: Reserves & Resources (Cont’d)

    Reserves & Resources (Cont’d) Copperstone Mineral Resources have an effective date of February 15, 2023. The Qualified Person responsible for the Mineral Resource estimate is Mr. Richard A. Schwering, P.G., SME-RM, an employee of Hard Rock Consulting, LLC. Mineral Resources that are not Mineral Rese

Minera Alamos — Investor Presentation (November 2025) on 6ix