Euromax Resources Ltd. · TSXV:EOX

Euromax Resources — Investor Presentation (October 2016)

25 slides from Euromax Resources's investor presentation, October 2016

  1. Slide 1: Creating Delivering Value

    © Euromax RESOURCES Creating Delivering Value i Sel || = Euromax Resources Ltd. THE MARKET ¥ 1S OPEN TSX: EOX

  2. Slide 2: Disclaimer

    © Euromax RESOURCES Disclaimer This presentation contains statements that are forward-looking, such as those relating to results of operations and financial condition, capital spending, financing sources, commodity prices, mineral resources and property evaluation plans and programmes. Forward-looki

  3. Slide 3: The Euromax Proposition: Ilovica-Shtuka Gold-Copper project

    © Euromax Introducing the llovica-Shtuka Gold-Copper project in Macedonia The Euromax Proposition Simple Geology, Simple Mining, Simple processing, Simplicity Simple Logistics = AISC US$372/oz Longevity 20+ year Mine Life = cyclical Gold & Copper exposure Credibility A Management Team that has done

  4. Slide 4: Logistics

    4 Logistics Rosia Montana (Gabriel Resources) Certej (Eldorado Gold) Bor Timok (Nevsun Resources) Europe North America Chelopech (Dundee Precious Metals) Africa Skouries (Eldorado Gold) South America

  5. Slide 5: Macedonia

    1S Euromax Macedonia Government & GDP USD 11 billion Tax rate 10% Public Support . aye ie Population 2 million Excellent infrastructure Educated workforce Free Trade World Bank Ease of agreements with Doing Business 25% Unemployment FU and EFTA 6th EU, 12th World

  6. Slide 6: Unlocking the Value

    © Euromax RESOURCES Unlocking the Value New Management Team injects US$5 Million Cash to execute its plan to unlock the value of the . llovica-Shtuka copper-gold porphyry May 2012 Former European Goldfields Management Team assumes Board & Management control of Euromax mat UNOBULIA ILOVICA

  7. Slide 7: Systematic Value Creation

    © Euromax RESOURCES Systematic Value Creation Measured & Proven & Indicated Resources Probable Reserve ¢ Inferred Resource V 256.8mt @ 198.1mt @ 0.32g/t Au (2.6Moz) 0.32g/t Au (2.01Moz) * Preliminary Economic Analysis V 0.21% Cu (1.2Blb) 0.21% Cu (898.9Mlb) (AuEq 0.66 g/t) *M &1 Resource V AuEq 5.4M

  8. Slide 8: Prices: USD 1,220/oz Au; USD 2.90/lb Cu

    8 Prices: USD 1,220/oz Au; USD 2.90/lb Cu

  9. Slide 9: Credibility

    £4 DMIT amec foster wheeler Paty W sri consultinc © Euromax RESOURCES SGS TETRATECH Schlumberger PF Golder Credibility Environmental & Social Impact Feasibility Study / FEED Assessment - AMEC Foster Wheeler - Plant & Process Design _- Baseline Study (Socio-economic Survey) *DMT/ SRK- Mining - ESIA T

  10. Slide 10: Simple Geology

    10 Simple Geology ✓ Simple Mining ✓ Simple Processing ✓ Simple Logistics ✓

  11. Slide 11: •          •   

    11 •          •                   •

  12. Slide 12: Simple Mining

    12 © Euromax RESOURCES Simple Mining 9 P P I? d Probable R + Strip Ratio 1:1 — open pit Grade Contained Metal . _ . Classification Tonnage Au Cu Au Cu * Conventional drilling and blasting together (at) | (%) (Moz) | (Mlb) with shovel and trucks supported by a fleet | _ Probable 112.6 0.30 | 019 | 0.

  13. Slide 13: Simple Processing

    13 © Euromax RESOURCES Simple Processing * 10Mt pa throughput * Primary gyratory in pit crusher with conveyor from pit to plant ¢ SAG mill with two ball mills * Bulk flotation - produces clean concentrate of 24% Cu & 24g/t Au * CIL on scavenger tails to on-site doré (Ff: Reagents

  14. Slide 14: Simple Logistics

    14 © Euromax RESOURCES Simple Logistics ¢ Road Transportation (A3 Motorway) directly to RE pee fhe the Pirdop smelter at costs of US$26.4 per tonne - pid of concentrate F 2 Be Ake Pernik > i i Ry —ronpreuvtia ¢ 60,000 — 100,000 tpa concentrate production eras ) ee a. oo eee using 30t trucks as | sli

  15. Slide 15: Near Mine Exploration Upside

    15 SS) Euromax RESOURCES Near Mine Exploration Upside : Shallow Epithermal Targets: * IP anomalies — high chargeability * Coincident with soil geochemistry anomalies in Cu & Au * No significant drilling i CROSS SECTION 7653800 E Deep Porphyry Target: Alteration overprint of main porphyry Strong geoc

  16. Slide 16: A Wealth of Experience

    © Euromax RESOURCES A Wealth of Experience 16 * +30 years in investment banking, focused on the mining sector in Europe & The Americas. * Senior management positions at European Goldfields, Canaccord, Endeavour Financial, Standard Bank, and NM Rothschild & Sons Ltd. * Extensive project finance exper

  17. Slide 17: Construction Financing Plan

    © Euromax RESOURCES Construction Financing Plan Rationale: Arrange 100% + Debt Financing, so that the optimal capital structure can be discretely selected to maximize the return per share Debt Finance Contractor Subordinated US$ 400 million Debt US$ 125 million * US$ 240 million UFK Guaranteed Proje

  18. Slide 18: Cashflow Profile — Returning The Value

    18 1S Euromax Cashflow Profile — Returning The Value Years 1-5 6-10 11-23 Au (02/yr) 103,000 90,800 67,700 Avg Annual Production Cu (t/yr) 20,800 16,800 13,300 Total AuEg (02/yr) 212,000 179,800 137,700 Cash Flows by Period (Au US$ 1220 /oz, Cu US$ 2.90 /Ib) Years 1-5 6-10 11-23 Average Annual ae ae

  19. Slide 19: Production vs Cumulative Operating Cash Flow

    19 Production vs Cumulative Operating Cash Flow Gold Gold Equivalent Copper Operating Cash Flow 300,000 $1,200,000 Cumulative Operating Cash Flow in US'000 250,000 $1,000,000 Gold Equivalen Ounces 200,000 $800,000 150,000 $600,000 100,000 $400,000 50,000 $200,000 0 $0 1 2 3 4 5 6 7 8 9 10

  20. Slide 20: Research Coverage

    20 EOX GDXJ Research Coverage: CIBC, Peel Hunt, Echelon Wealth Partners, Edison

  21. Slide 21: Executing on Value Creation at Ilovica-Shtuka

    21 © Euromax RESOURCES Euromax: Executing on Value Creation at llovica-Shtuka Simple Geology, Simple Mining, Simple processing, Simplicity Simple Logistics = AISC US$372/oz Longevity 20+ year Mine Life = cyclical Gold & Copper exposure Credibility A Management Team that has done it all before Suppor

  22. Slide 22: Euromax contacts

    22 1S Euromax www.euromaxresources.comMm Steven LC Sharpe Varshan Gokool Pat Forward

  23. Slide 23: Global Gold Cost Curve Positioning

    Global Gold Cost Curve Positioning 2016E By-Product Cash Cost Curve (Three-Year Trailing Average Prices)1 (based on modelled global production of ~65.6 Moz) $1,200 $1,000 By-Product Cash Cost (US$/oz) $800 $600 $400 $200 Ilovica $279/oz (LOM avg.) $0 0% 5% 75% 80% 85% 100% 10% 15% 20% 25% 30% 35% 40

  24. Slide 24: Global Gold Cost Curve Positioning (Spot Prices)

    Global Gold Cost Curve Positioning 2016E By-Product Cash Cost Curve (Spot Prices)1 (based on modelled global production of ~65.6 Moz) $1,200 $1,000 By-Product Cash Cost (US$/oz) $800 $600 $400 Ilovica $550/oz (LOM avg.) $200 $0 0% 5% 20% 25% 100% 10% 15% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 8

  25. Slide 25: Overview of Assets in the Region

    Overview of Assets in the Region Assets in the Tethyan Eurasian Metallogenic Belt Slovakia Detva Atalaya Mining Sturec Moldova Ortac Resources Ukraine Romania Hungary Rosia Montana Gabriel Resources (81%) Gov’t of Romania (19%) Bucium Gabriel Resources (81%) Gov’t of Romania (19%) Rovina Valley Eldo

Euromax Resources — Investor Presentation (October 2016) on 6ix