Tnr Gold Corp. · TSXV:TNR
Tnr Gold — Investor Presentation (June 2016)
30 slides from Tnr Gold's investor presentation, June 2016
Slide 1: TNR Gold Corp. Shotgun Gold Project
TNR Gold Corp. Shotgun Gold Project June 2016
Slide 2: Forward
FORWARD The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this presentation. Statements in this presentation other than purely historical information, historical estimates should not be relied upon, including statements relating to the Compa
Slide 3: Company Overview
Company Overview “Lead Project Generator” • Mineral Exploration: – Precious Metals and Base Metals – Strategic Focus on Rare Metals • Proven Business Model: – Early Identification and Acquisition of Mineral Prospects – Selectively Advance Projects Internally – Employ JV Partnerships to Diversify Cos
Slide 4: Management and Directors
Management and Directors Management • Gary Schellenberg, B.Sc. (Geol.), President, CEO • Jerry Bella, CGA, CFO • Roberto Lara, Managing Director (South America) • John Harrop, P.Geo, VP Exploration • Anthony Kovacs, COO • Dr. Frederick Breaks P.Geo, Special Adviser to Board Directors • Gary Schellen
Slide 5: Corporate Structure
Corporate Structure Generating Unlocking Quality Asset Value Minera Solitario Argentina Projects Base Cu-Au ILC Spinoff International Lithium Corp. Successfully Listed TNR GOLD CORP. (ILC:TSX.V) May 24, 2011 TNR.TSXV Li + Rare Metals (21.18% Equity owner) TNR shareholders received 1 unit for Amerigo
Slide 6: The Shotgun Project - Location
The Shotgun Project Location Located in SW Alaska near Donlin Gold and Pebble Alaska is rising in terms of policy index according to the Fraser Institute’s “Annual survey of mining companies” Fort Knox Shotgun could access tide water via barge transport from Dillingham (150km away) Pogo to Koliganek
Slide 7: The Shotgun Project - Exploration History
The Shotgun Project Exploration History • 4 mineralized target areas • Elevation: 200 – 850m 25 km PROSPECT COMPANY YEAR DRILLING Camp (m) Shotgun Ridge Cominco 1984,88 226 NovaGold 1998 3,107 TNR Gold 2006 762 2012 814 Shot TNR Gold 2005 301 King TNR Gold 2005 145 Winchester TNR Gold 2005 535 2006
Slide 8: Located between Donlin Gold and Pebble
The Shotgun Project Located between Donlin Gold and Pebble • Same regional geologic environment as Donlin – Kuskokwim Basin • Intrusive rocks at Shotgun are similar age to widespread magmatic gold mineralization (70 Ma) throughout the basin, including Donlin • Area is underexplored due to poor expos
Slide 9: The Pebble Controversy
The Shotgun Project The Pebble Controversy • The Shotgun Project straddles the Bristol Bay and Kuskokwim Recording District boundary • The Donlin Creek project is in the Kuskokwim Recording District (“Donlin Gold enjoys broad support from both the Government of Alaska and the Alaska Native Corporati
Slide 10: The Shotgun Project - Geology
The Shotgun Project Geology • Predominantly underlain by Cretaceous sediments of the Kuskokwim Group • Granite to syenite intrusive bodies 25 km intruded the Kuskokwim Group • Some of these intrusions appear to be directly related to gold mineralization • North-south oriented string of gold prospect
Slide 11: The Shotgun Project - Mineralization
The Shotgun Project - Mineralization Three examples of multiphase monomictic breccia with strongly silicified and bleached quartz feldspar biotite porphyry from DDH SR06-43. • Shotgun is a multiphase intrusion related gold system associated with 69.7 Ma magmatism, tying Shotgun to a widespread magma
Slide 12: Shotgun Ridge – Mineralized Intervals
Shotgun Ridge – Mineralized Intervals NE-Zone Mid-Zone SW-Zone 22m of 2.86 g/t Au 27.4m of 2.3 g/t Au 18.4m of 2.03 g/t Au • 12-56 returns 242m of 1.25g/t Au over all three mineralized zones • 12-57 returns 209m of 1.02g/t Au over all three mineralized zones • 12-58 returns 46.55m of 1.14 g/tTSX.V A
Slide 13: Shotgun Ridge – Drill Holes Plan View
Shotgun Ridge – Drill Holes Plan View A’ Location of x-sect A-A’ in next slide A TSX.V : TNR 13
Slide 14: Shotgun Ridge – Resource Model Cross-Section A-A’
Shotgun Ridge – Resource Model Cross-Section A-A’ A A’ OPEN Mineralization not included in resource estimate. TSX.V : TNR 14
Slide 15: The Shotgun Project – Mineral Resource
The Shotgun Project – Mineral Resource Inferred Mineral Resource, 2013* • 20,734,313 tonnes @ 1.06 g/t Au • 705,960 ounces Au • 0.5 g/t Au cut-off • Mineral resource is located from surface to a depth of 150m • Resource is located on a ridge, forming a topographic high • Mineralization appears to be
Slide 16: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Shotgun Ridge alone shows potential to host multiple, closely spaced gold deposits Geologic map of Shotgun Ridge showing area of drilling and interpreted faults Kuskokwim Sediments • Mineralization hosted in quartz-feldspar-biotite (qfp) porphyry • Breccia
Slide 17: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Magnetic image shows ‘ring structure’ typical of porphyry systems • Magnetic high associated with metamorphic aureole surrounding porphyry • Structures easily mapped by magnetic lineaments and offsets • Mineralization is located in “magnetic lows” at struc
Slide 18: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Mineral resource is defined at structural intersections disrupting the magnetic ‘ring’ Surface projection of resource model shell • Area of defined resource located at structural intersections • Resource area coincident with magnetic low signature • Multip
Slide 19: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Resistivity surveys show NNW-SSE structural features • Resistivity model from 3D survey showing near-surface response • Purple = low resistivity • White = high resistivity • Resistivity reveals qtz-flooded structures associated with mineralization • Higher
Slide 20: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Chargeability lows highlight the mineralization and untested targets • Chargeability model from 3D survey showing near-surface response • Blue = low chargeability • Red = high chargeability • Low chargeability response corresponds perfectly with known mine
Slide 21: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Outlining the chargeability lows. Note the spatial limits of the current 3DIP surveys • Chargeability model from 3D survey showing near-surface response • Blue = low chargeability • Red = high chargeability • Low chargeability response corresponds perfectl
Slide 22: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Chargeability lows over resistivity highs show areas of qtz flooding = mineralization • Chargeability lows coincide with structures mapped by resistivity • Purple = low resistivity • White = high resistivity • Higher conductance structures are untested and
Slide 23: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Geology supports the target model • qfp and breccia are coincident Kuskokwim Sediments with geophysical structural interpretations and zones of low chargeability • Only one of 5 targets is tested to date Breccia • 705,000 oz Au defined in one target with l
Slide 24: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Location of cross section on following slide B A 200 m
Slide 25: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Mineralization plotted down hole over 3D chargeability model Note consistency of grade over long intervals A B A B Elevated Au values at end of holes TSX.V : TNR 25
Slide 26: The Shotgun Project – Understanding Targets
The Shotgun Project – Understanding Targets Shotgun Ridge has untested structural intersections that may host significant gold deposits B If the IP method is showing mineralization as interpreted, then the potential exists to expand the near-surface mineral resource in close proximity to the existin
Slide 27: The Shotgun Project – Opportunity
The Shotgun Project – Opportunity Camp Scale Opportunity • Shotgun Ridge is just one of multiple gold target areas 25 km • Gold mineralization identified at each prospect: Shot, King, and Winchester • This group of prospects forms a distinct gold district held 90% by TNR • Surface geochemistry ident
Slide 28: “More Than Gold” Thank You
“MORE THAN GOLD” Thank You
Slide 29: Shotgun Zone Resource Estimate: effective date May 27, 2013
Shotgun Zone Resource Estimate: effective date May 27, 2013 The Shotgun Zone mineral resource estimate is based on 34 diamond drill holes (NQ) totaling 4,932.3 metres, with 2,481 assays (0.2 up to 10 metres in length). Holes were drilled by several operators in five drill campaigns conducted between
Slide 30: Shotgun Ridge Inferred Resource – Au (g/t) cut-off
Shotgun Zone Resource Estimate: effective date May 27, 2013 Shotgun Ridge Inferred Resource – Au (g/t) cut-off Modeled based on a 0.3 – 0.5 g/t Au cut-off Cut-off Tonnes Grade (g/t) Grams Ozs <0.1 g/t 24,551,029 0.96 23,628,833 759,770 0.1 g/t 24,545,917 0.96 23,628,825 759,769 0.2 g/t 24,545,917 0.