    RRS Gold Coast Presentation Patrick Duffy (CFO) 16-17 May 2023 www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence

  2. Slide 2: Competent Person's Statement and Disclaimer

    Competent Person’s Statement and Disclaimer Competent Person Statements for JORC 2012 Mineral Resource and Ore Reserves ● The information in this presentation that relates to the Mineral Resources for the King of the Hills deposit is extracted from the ASX announcement titled “Mineral Resource and O

  3. Slide 3: Red 5 Asset Overview

    Red 5 Asset Overview Red 5’s assets comprise the King of the Hills (KOTH) Gold Mine, Darlot Gold Mine and a 3.25% net smelter royalty over the Siana Gold Mine KOTH Summary Mineral Resource5 4.75Moz 2H FY2023 Production6 90-105koz Ore Reserve5 2.7Moz Indicative Production2 >200koz p.a. Processing Pla

  4. Slide 4: Red 5 Limited – Corporate Profile

    Red 5 Limited – Corporate Profile 0.5 0.45 Our Company Vision 0.4 0.35 “To be a successful multi-operational 0.3 exploration and mining company, providing 0.25 benefits to all stakeholders, through the 0.2 consistent application of technical excellence, 0.15 and responsible and sustainable industry

  5. Slide 5: KOTH Geology is Well Understood - Open in all Directions

    KOTH Geology is Well Understood - Open in all Directions Jun-22 Mineral Resource1 Jun-22 Ore Reserve1 105.5Mt @ 1.4 g/t for 70.2Mt @ 1.2 g/t for 4.75Moz Au 2.66Moz Au ● Orebody in the contact zone of a substantial Granodiorite intrusion ● 4km long x 2km wide ● Historical understanding from previous

  6. Slide 6: SAG mill – commercial production declared Dec 2022

    SAG mill – commercial production declared 16 Dec 2022 www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 6

  7. Slide 7: Site is powered by 30MW hybrid gas-solar power station

    Site is powered by 30MW hybrid gas-solar power station www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 7

  8. Slide 8: Inflection point – 17,550 ounces in March; 18,633 ounces in April

    Inflection point – 17,550 ounces in March; 18,633 ounces in April KOTH OP high grade ore increased in Q3 Quarterly KOTH Gold Production and Feed Grade 600 1.40 50,000 1.40 500 1.20 Ore Grade (g/t) 1.00 400 0.80 1.20 t ('000) 300 40,000 0.60 200 0.40 1.00 100 0.20 0 - 30,000 0.80 g/t oz 0.60 HG Ore T

  9. Slide 9: KOTH OP operations now mining on the main ore body

    KOTH OP operations now mining on the main ore body Stage 1 KOTH Open Pit Ore Reserve ● Open pit mining is now well Model - Contained Ounces by RL established on the 5225mRL bench level RL HG LG 5295 ● The increasing ore tonnage and grade 5285 forecast from the open pit is 5275 5265 translating to im

  10. Slide 10: KOTH OP mine plan to 2037 – opportunity to accelerate mining

    KOTH OP mine plan to 20371 – opportunity to accelerate mining 1. Red 5 ASX Release: 7 September 2022 www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 11

  11. Slide 11: KOTH underground mine progressively mining more fresh areas

    KOTH underground mine progressively mining more fresh areas More tonnes at higher grades are expected from the KOTH underground in H2 FY23 ● Fully resourced underground mine crews are in place ● Mining in more fresh areas – resulting in predictable tonnes and grade (with less dilution) ● Higher grad

  12. Slide 12: Mill is the Logical Processing Hub for the Leonora District

    KOTH Mill is the Logical Processing Hub for the Leonora District ● KOTH process plant is the lowest Regional process plants – mill size, unit cost and distance to Leonora cost mill in the Leonora district ● Processing cost of A$12/t1 60 ● Large mill drives site-wide economies of scale 50 ● 30MW hybr

  13. Slide 13: Standout Value Opportunity

    Standout Value Opportunity ● Red 5 EV/Reserve relative to its 1,500 peers Bellevue ● Valuation of WA based-gold 1,200 companies1 EV / Reserve (A$/oz) Ramelius ● Bubble size = Enterprise Value 900 ● The KOTH Gold Mine positions Gold Road Red 5 as an emerging mid-tier Silver Lake Capricorn Australian

  14. Slide 14: THANK YOU

    THANK YOU Level 2, 35 Ventnor Avenue, West Perth, Western Australia 6005 Australia (61-8) 9322 4455 (61-8) 9481 5950 www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 15

  15. Slide 15: Appendicies

    Appendicies www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 16

  16. Slide 16: Investment Highlights

    Investment Highlights King of the Hills KOTH Processing Hub • Mineral Resource of 4.75 Moz1 • Lowest cost plant in the • Ore Reserve of 2.7 Moz1 Leonora district • Open pit and underground • 4.7mtpa processing capacity, mines trageting 5.5mtpa3 • ~15 year mine life1 • ~200kozpa production centre4 St

  17. Slide 17: Leadership Team with Strong Mining Expertise

    Leadership Team with Strong Mining Expertise Red 5 has a strong and capable team, with many years of mining and development experience both at Red 5 and previously at multi- billion international development projects. Red 5 is undergoing a formal process to renew the composition and succession of th

  18. Slide 18: KOTH Mineral Resource of 4.75Moz

    KOTH Mineral Resource of 4.75Moz1 Total Open Pit & Underground KOTH Resource as at June 2022 Cut-off Mining Gold Contained Gold Classification Tonnes (000t) (g/t) Method (g/t) (000oz) Measured 0.4-1.0 OP+UG 1,330 1.2 50 Indicated 0.4-1.0 OP+UG 72,880 1.4 3,250 Inferred 0.4-1.0 OP+UG 21,070 1.6 1,090

  19. Slide 19: KOTH Ore Reserve of 2.7Moz

    KOTH Ore Reserve of 2.7Moz1 Total KOTH Ore Reserves as at June 2022 Cut-off JORC 2012 Tonnes Gold Contained Gold Deposit Mining Method (g/t) Classification (Mt) (g/t) (Moz) KOTH Open pit 0.4 Probable 63.3 1.2 2.4 KOTH Underground 1.3 Probable 2.8 2.0 0.2 Rainbow Open pit 0.4 Probable 2.1 0.8 0.1 Cen

  20. Slide 20: 1. Growth Strategy

    1. Growth Strategy www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 21

  21. Slide 21: KOTH diamond drill results enhance FY23 and FY24 mine plan

    KOTH diamond drill results enhance FY23 and FY24 mine plan1 Growth opportunity under the South Pit final shell once fully dewatered Regal and Eastern Flank ● 10m at 79.62g/t ● 62m at 6.33g/t ● 24.5m at 14.07g/t ● 6.8m at 35.06g/t Central ● 3.4m at 49.4g/t ● 29.6m at 3.48g/t ● 38.5m at 5.97g/t West B

  22. Slide 22: KOTH 5-year UG Mine Plan is only constrained by drilling

    KOTH 5-year UG Mine Plan1 is only constrained by drilling 1. Red 5 ASX Release: 7 September 2022 www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 23

  23. Slide 23: KOTH Exploration – Numerous Surface Targets

    KOTH Exploration – Numerous Surface Targets ● Three satellite deposits are already in the LOM plan: ● Rainbow ● Centauri ● Cerebus-Eclipse ● Integrated datasets have identified priority targets along the Tarmoola and Ursus Fault corridors ● Tarmoola Fault Corridor ● Poorly tested outside of the mine

  24. Slide 24: Darlot drilling results identified potential to upgrade Resource

    Darlot drilling results identified potential to upgrade Resource1 Darlot UG mine retains significant option value with potential at-depth in a higher gold price environment Middle Walters South1 ● 6.0m at 71.4g/t ● 3.4m at 42.5g/t ● 31.1m at 5.8g/t Centurion Lode1 ● 1.1m at 1,521.5g/t Dar-Cent Bulk1