  1. Slide 1: Fenn-Gib Gold Project

    FENN-GIB GOLD PROJECT J A N U A R Y 2 0 2 4 TSX.V: MFG OTCQB: MFGCF FRA: 9M5 Canada’s First Carbon Neutral Gold Project Vision to Build Zero Carbon Mine

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation contains "forward-looking information" for purposes of applicable securities laws ("forward-looking statements"). Forward-looking statements are neither historical facts nor assurances of future performance. Instead, they are based on the Company's current beli

  3. Slide 3: Current Status

    CURRENT STATUS ASSESSING DEVELOPMENT OPTIONS INDICATED RESOURCE 3.38Moz @ 0.93 G/T AU PFS-LEVEL METALLURGICAL TESTING COMPLETED PFS-LEVEL GEOTECH STUDY COMPLETED BASELINE STUDIES ONGOING (3 YEARS) PRE-FEASIBILITY STUDY START Q1 2024 2

  4. Slide 4: Fenn-Gib: Top Tier Mining Jurisdiction

    FENN-GIB: TOP TIER MINING JURSIDICTION North Block straddles South Block straddles 4,800 ha: Numerous gold the Pipestone Fault: the Porcupine Fault: occurrences across North Block and hosts current +3 Moz under-explored: no both North and South NI 43-101 resource road access Blocks South Block 3

  5. Slide 5: Fenn-Gib Deposit: Key Attributes

    FENN-GIB DEPOSIT: KEY ATTRIBUTES Location • Excellent access: adjacent to Highway 101, 20km east of Matheson • Renewable grid power, abundant water, and large, skilled labor pool • No camp required • Suitable for remote operations with high-speed connectivity Geology • Broad disseminated mineralizat

  6. Slide 6: Fenn-Gib Deposit

    FENN-GIB DEPOSIT Interim Resource: Indicated 113.7M tonnes @ 0.93 g/t 5

  7. Slide 7: Fenn-Gib Deposit

    FENN-GIB DEPOSIT Potential Open -Pit, Large Tonnage, Low Strip 6

  8. Slide 8: Fenn-Gib Deposit: Conceptual Pit

    FENN-GIB DEPOSIT: CONCEPTUAL PIT CONCEPTUAL OPEN -PIT Similar to Ernest Henry Open Pit: Depth 570m, Diameter 1.3km 7

  9. Slide 9: Bulk Tonnage Deposits: Detour Lake

    BULK TONNAGE DEPOSITS: DETOUR LAKE Current Resource: M&I 277.46Mt @ 0.91 g/t Lenth 3.5km Width 1.2km Ultimate depth 624m 8

  10. Slide 10: Mineral Resource: April 2023

    MINERAL RESOURCE: APRIL 2023 HIGH QUALITY, BULK-MINEABLE RESOURCE • Based on assays of 113,800m of drilling (currently +152,000m) • Pit constrained Indicated resource: 113.7 Mt @ 0.93 g/t Au for 3.38Moz • Pit constrained Inferred resource: 5.7M tonnes @ 0.85 g/t Au for 0.16Moz • Broad disseminated m

  11. Slide 11: Fenn-Gib Mineral Resource Update

    FENN-GIB MINERAL RESOURCE UPDATE Based on 113,800m of 140,000m Drill Program (50 ° Pit Slope) Open-Pit Cut-Off Grade Au Ounces Class Tonnes Grade (g/t Au) (oz) Indicated 0.40 113,687,000 0.93 3,383,000 Inferred 0.40 5,724,000 0.85 157,000 Source: Tim Maunula, P. Geo, T Maunula & Associates Consultin

  12. Slide 12: Metallurgical Testing

    METALLURGICAL TESTING WORLD CLASS GOLD RECOVERIES • Advanced met testing for PFS completed at SGS • Two recommended flowsheets: • Flotation to Final Concentrate—98% Au recoveries • Flotation – Regrind – Cyanidation—94% Au recoveries • Phase 1: Flotation to Final Concentrate for offsite treatment • C

  13. Slide 13: Flowsheet Options

    FLOWSHEET OPTIONS FLOW SHEETS SIMILAR TO NORTHERN STAR’S KCGM OPERATION 12

  14. Slide 14: High-Grade Starter Pit

    HIGH-GRADE STARTER PIT +600,000 oz @ ~1.35 g/t – Rapid Repayment of Capital 13

  15. Slide 15: Infill, Expansion and Exploration Drilling

    INFILL, EXPANSION AND EXPLORATION DRILLING 1. Main Deposit: infill drilling complete 2. East Extension: drilling to continue 3. Contact Zone: drilling completed 4. Footwall Zone: drilling underway 5. Exploration drilling: drilling underway 14

  16. Slide 16: Eastern Extension

    EASTERN EXTENSION High-Grade Zone Plunging to the Southeast 15

  17. Slide 17: Contact Zone: Below Pit

    CONTACT ZONE: BELOW PIT High-Grade Main Zone Plunging to the Southeast: Underground Potential 16

  18. Slide 18: Contact Zone Drilling

    CONTACT ZONE DRILLING MAYFAIRCOLD coro a g 41.14 g/tAu / 496.0m nc. 2.84 e/tAu /21.0m & eftAu /19.0m8 2.40 g/tAu /31.2mincl. ‘5.45 g/tau /19.0m 5 & a 0 Ge (0.61 g/tAu /168.2m inl Lad g/t Au /38.1m et 2023 resource pit shell "28% ell 0.73g/tAu /47.0m Wa H i 16 g/tAu /42imindl 1.60 g/t Au /209.0m inet

  19. Slide 19: Contact Zone: Underground Potential

    CONTACT ZONE: UNDERGROUND POTENTIAL Footwall Zone Main Deposit Contact Zone 18

  20. Slide 20: Footwall Zone Discovery

    FOOTWALL ZONE DISCOVERY Footwall Zone Mafic Volcanics Main Zone Pyroxenite Porcupine Sediments 7 Open-Pit METERS MAYFAIRCOLD

  21. Slide 21: Footwall Zone Discovery

    FOOTWALL ZONE DISCOVERY FG21-211 FG21-215 FG21-218 2021 JDS FG22-222 Conceptual FG21-220 Pit Outline FG22-215 2.88 g/t Au over Fenn-Gib 49.0m incl Zone 6.53 g/t Au over 17.5m FG22-218 0.71 g/t Au over 92.0m incl. 2.15 g/t Au over 10.0 FG22-218 2.40 g/t Au over 47.4m incl. 0.0 12.5 3.83 g/t Au over 4

  22. Slide 22: Footwall Zone Model

    FOOTWALL ZONE MODEL ~800m +700m 21

  23. Slide 23: Footwall Zone Model

    FOOTWALL ZONE MODEL FG23-311 secondary altered/mineralized Mafic volcanics (i setimentary rocks (Porcupine Group Sediments) IHF afc vteanirocks massive plowed vail ws) [Ty tere mate vokanc rocks (erced, serie carbonate aie atered) BiB vrramaticvoeaic rocks (a Frersiteatered amas okanc rook (geencarb

  24. Slide 24: North Block Regional Exploration: IP Targets

    NORTH BLOCK REGIONAL EXPLORATION: IP TARGETS Fenn-Gib Deposit 23

  25. Slide 25: South Block: Potential for New Discoveries

    SOUTH BLOCK: POTENTIAL FOR NEW DISCOVERIES 24

  26. Slide 26: South Block: Airborne Mag Survey

    SOUTH BLOCK: AIRBORNE MAG SURVEY 25

  27. Slide 27: South Block Ground Geophysics

    SOUTH BLOCK GROUND GEOPHYSICS 26

  28. Slide 28: ESG Vision: Carbon Neutral Gold Mine

    ESG VISION: CARBON NEUTRAL GOLD MINE CANADA’S FIRST NET ZERO CARBON GOLD PROJECT 27

  29. Slide 29: ESG Vision: Zero Carbon Gold Mine

    ESG VISION: VISION: ZERO CARBON GOLD MINE OPPORTUNTIES TO DECARBONIZE • Mobile fleet emits +50% of GHG: Alternatives: hydrogen/battery electric • Processing emits +30% of GHG: Renewable hydropower • Heating emits 5-10% of GHG: Renewable hydropower • Drilling and blasting emits +5% of GHG: Battery el

  30. Slide 30: Capital Structure & Major Shareholders

    CAPITAL STRUCTURE & MAJOR SHAREHOLDERS CAPITAL STRUCTURE MAJOR SHAREHOLDERS Shares Outstanding 100.3M Options 8.03M ➢Insiders ~28% Warrants Nil Fully Diluted 108.3M ➢HNW retail ~18% Market Cap ~C$260M ➢Muddy Waters Capital +16% CASH End Q3 C$6.8M ➢Canadian pension plan +5% Current ~C$13.0M 29

  31. Slide 31: Summary

    SUMMARY LOW RISK, SUSTAINABLE ASSET • JURISDICTION: Low risk; security of title • LOCATION: Low risk; abundant power, water, labor • GEOLOGY: Low risk; outcropping; bulk mineable • METALLURGY: Low risk; standard flowsheet options; high recoveries • DEVELOPMENT: Low risk; conventional development • C

  32. Slide 32: Vision

    VISION TARGET: TIER-ONE ASSET CURRENT RESOURCE: 3.38Moz INDICATED “FIRST MINE” TARGET: 4Moz NORTH BLOCK REGIONAL TARGET: +1Moz SOUTH BLOCK REGIONAL TARGETS: +1Moz FENN-GIB TARGET: +5Moz 31

  33. Slide 33: Mayfair Gold Corp

    MAYFAIR Patrick Evans GOLD CORP President and CEO WWW.MAYFAIRGOLD.CA TSX.V: MFG OTC: MFGCF FRA: 9M5 PATRICK@MAYFAIRGOLD.CA (800) 342-6705 32

  34. Slide 34: Appendices

    APPENDICES A.1 History A.2 Leadership A.3 2023 Business Plan A.4 Interim resource update (Oct. 2022) A.5 Fenn-Gib Development Options

  35. Slide 35: Mayfair Gold Acquisition of Fenn-Gib

    MAYFAIR GOLD ACQUISTION OF FENN-GIB: Asset Owned for 36 Months, Public for 32 Months First drill turning JANUARY 19 2021 2022 2023 DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC DECEMBER 31 Dec 2023

  36. Slide 36: Leadership

    LEADERSHIP MANAGEMENT BOARD OF DIRECTORS Patrick Evans Howard Bird Harry Pokrandt Doug Cater CEO VICE PRESIDENT EXPLORATION Chairman ▪ 23+ years of senior management ▪ 30+ years of exploration, ▪ 30+ years of capital markets ▪ Professional geologist with +35 experience at public mining development a

  37. Slide 37: 2024 Business Plan

    2024 BUSINESS PLAN 30,000m Phase 5 drill program Resource update Q2 2024 Pre-feasibility study H1 2024 Underway Planned Planned Regional exploration Baseline environmental studies Definitive feasibility study Underway Year 4 underway Planned TIMELINE TO DEVELOPMENT OF FIRST MINE 2025 2026 Permitting

  38. Slide 38: Fenn-Gib Interim Resource Update

    FENN-GIB INTERIM RESOURCE UPDATE Gold Cut- Resources Tonnage Gold Grade Gold Ounces Off Grade Category (T X 1000) (g/t) (oz) (g/t) Pit-Constrained Resources 0.70 57,004 1.32 2,418,000 0.60 70,830 1.19 2,706,000 0.55 79,449 1.12 2,865,000 0.50 89,424 1.06 3,033,000 0.45 100,785 0.99 3,206,000 Indicat

  39. Slide 39: Fenn-Gib Development Options

    FENN-GIB DEVELOPMENT OPTIONS FENN-GIB PROJECT HWY 101 BLACK FOX MINE A.5