Rockhopper Exploration Plc · LSE:RKH

Rockhopper Exploration — Shareholder Meeting (September 2010)

11 slides from Rockhopper Exploration's shareholder meeting presentation, Sep 30, 2010

  1. Slide 1: Rockhopper Exploration PLC AGM Presentation

    Rockhopper Exploration PLC 30 September 2010 AGM Presentation www.rockhopperexploration.co.uk

  2. Slide 2: Forward looking information

    Forward looking information Certain information in this presentation about the Company and its prospects constitutes forward-looking information. Such forward-looking information, including but not limited to statements with respect to anticipated rates of production, the estimated costs and timing

  3. Slide 3: Rockhopper Falkland Islands Board of Directors

    Rockhopper Falkland Islands Board of Directors Dr. Pierre Jungels, CBE: Executive Chairman  PhD Geophysics & Hydraulics, California Institute of Technology  Previously at Shell, PetroFina SA, Enterprise Oil Sam Moody: Managing Director  Co-founder of Rockhopper  Previously at AXA Equity & Law In

  4. Slide 4: Sea Lion – Oil Discovery Main fan

    Sea Lion Sea Lion – Oil Discovery Main fan Overview • Sea Lion well spudded on 16 April 2010 and has reached a depth of 2,744 metres • Initial logging data confirmed: ― 53 metres of net pay in multiple zones ― Average porosity is 19% ― Logs showed good permeability ― No oil/water contact has been en

  5. Slide 5: Sea Lion

    Sea Lion Top oil sand Lowest point of main fan Oil down to level 5

  6. Slide 6: RPS Resource upgrade post well – Sea Lion

    RPS Resource upgrade post well – Sea Lion Volumetric estimates RPS Energy estimates as of 3 June 2010*** Background • Rockhopper has requested a preliminary volumetric assessment of Oil Initially In Place and estimates of recoverable resources from RPS Energy on the oil discovery made on the Sea Lio

  7. Slide 7: Sea Lion – Flow Test

    Sea Lion – Flow Test Test results Log from Sea Lion well 2 sands flowed • Test designed to flow 4 sands, gun misfire caused limited perforation and flow • Outcome limited by downhole and surface equipment • Not all guns fired Perforated and flowed • Rockhopper believes that the well could have flow

  8. Slide 8: Next Steps

    Next Steps Technical Operational Re-examine existing 3D in PL032/33 Consider acquiring new 3D seismic • Re-examine seismic data in the light of lessons learned from the Sea Lion • Ultimate size of Sea Lion fan unknown owing to lack of data – discovery intend to complete survey sharing vessel with ot

  9. Slide 9: Value Creation

    Value Creation CocktiopPer VALUE GENERATION FROM ONE DISCOVERY ROCKHOPPER EXPLORATION PLC VALUE Discovery TIME

  10. Slide 10: Next Steps

    Next Steps Financial & Corporate Funding requirements • Once work programme is finalised, funding requirement can be calculated • All funding options will be considered at the time Listing Status • Company is considering a move to main list when the time is right which is likely to be post appraisal

  11. Slide 11: Summary

    Summary Overview • Well 14/10-2 “Sea Lion” oil discovery • Successful flow test • First oil discovery in the Falklands • First flow test in the Falklands • First Contingent Resource in the Falklands • Best estimate recoverable contingent oil resource of 242 MMbbls* RPS Energy • Board believes signif

Rockhopper Exploration — Shareholder Meeting (September 2010) on 6ix