  1. Slide 1: Delivering on Investment

    CREDIT SUISSE CONFERENCE Delivering on Investment Philip Stephenson Chief Operating Officer (Australia & Americas)

  2. Slide 2: Disclaimer

    Disclaimer Forward Looking Statements This presentation includes forward looking statements. Forward looking statements can generally be identified by the use of words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, “outlook” and “guidance”, or other similar

  3. Slide 3: Newcrest Mining Limited

    Newcrest _ Mining Limited ® NEWCREST HIN ING LIMITED

  4. Slide 4: What makes Newcrest different

    What makes Long reserve life – ~24 years reserve life1 Newcrest different Low cost production – first quartile cost position Do what we say Organic growth options (at Cadia, Lihir, Wafi-Golpu, Havieron & Red Chris) 1. Reserve life is indicative and calculated as proven and probable gold reserves (co

  5. Slide 5: Operating assets, advanced projects and investments

    Cadia (100%) Lihir (100%) Telfer (100%) Operating FY20 Production: 843koz Au, 96kt Cu FY20 Production: 776koz Au FY20 Production: 393koz Au, 16kt Cu FY20 AISC: $160/oz assets, Ore Reserves: 21moz Au & 4.3mt Cu FY20 AISC: Ore Reserves: $1,206/oz 23moz Au FY20 AISC: Ore Reserves: $1,281/oz 1.4moz Au &

  6. Slide 6: Cadia and Lihir reserves larger than mines of major gold peers

    Cadia and Reserve base of operating assets1 (moz) Lihir reserves 25 larger than mines of 20 major gold peers 15 10 5 0 1. Based on producing assets held by Barrick, Newmont and Newcrest with an attributable reserve >4moz. Source: Company reports as at 21 February 2020. Reserves reflect proven and pr

  7. Slide 7: Lowest cost major gold producer

    Lowest cost AISC/oz for year to 30 June 20201 ($/oz) major gold producer 1,035 1,010 989 971 946 862 2 1. AISC/oz from company reports based on data available as Newcrest Gold Fields Barrick AngloGold 2 Newmont Agnico Eagle at 5:00pm EST, 15 September 2020 2. Agnico Eagle report AISC/oz produced

  8. Slide 8: A unique suite of technical capabilities

    A unique Lihir, Telfer, Telfer Gosowong1 Telfer Cadia suite of Red Chris technical capabilities OPEN PIT SELECTIVE Reef Narrow Vein UNDERGROUND BULK Sublevel Caving Block/Panel UNDERGROUND Caving Large scale comminution Pressure oxidation PROCESSING Copper-gold flotation Cyanide & carbon in leach 1.

  9. Slide 9: Adding value through technical capabilities

    Red Chris Havieron Adding value through • 70% acquired in August 2019 • Exploration earn-in agreement technical • Open Pit operation, with underground • 40% interest with pathway to 75%1 potential capabilities 1. The Havieron Project is operated by Newcrest Red Chris2 under a farm-in agreement with

  10. Slide 10: Red Chris

    Red Chris

  11. Slide 11: Delivering improvement

    Apply Newcrest’s Delivering Safety Edge Apply Newcrest’s industry leading improvement Transformation transformation technology approach Keep our people Improve existing Develop future safe operations potential

  12. Slide 12: Improving safety

    Improving safety Build a stronger safety culture through NewSafe Everybody making safer choices in everything we do, every time, every day. Critical controls for every high-risk task Verifying that the most important life-saving controls are known, in place and working.

  13. Slide 13: Reducing injury rates

    Reducing Newcrest TRIFR (excluding Red Chris) Red Chris TRIFR injury rates 12 month MMA 3.7 18.0 18.1 17.4 3.3 15.0 14.6 13.8 13.8 13.7 13.7 13.5 2.4 2.3 12.7 12.6 2.0 Jul-20 Jan-20 Feb-20 Mar-20 Jun-20 Oct-19 Aug-19 Sep-19 Nov-19 Dec-19 May-20 Apr-20 FY16 FY17 FY18 FY19 FY20 1. TRIFR = total record

  14. Slide 14: Improving existing operations

    Improving Haul Truck Availability TMM Uplift existing operations Plant Improvements Facilities Upgrades Cell 6 ratio Cell 6 ratio LIC AIC Froth Depth Control Cell 5 ratio Cell 5 ratio LIC AIC Air rate Control Cell 4 ratio Cell 4 ratio LIC AIC Cell 3 ratio Cell 3 ratio LIC AIC Cell 2 ratio Cell 2 rat

  15. Slide 15: Haul truck availability uplift program

    Planning Establishment SAP Integration Haul truck availability uplift program Organisational Development Foundational Materials Heavy Vehicle Workshop Restoration Project

  16. Slide 16: Increased material movement rates

    Fleet Management Payload Utilisation Operating for Increased System Increase Improvements Reliability material movement Total Material Movement (FY20) rates 100% % Change from August 2019 Baseline 90% 80% 70% 60% 50% 40% 30% 20% Newcrest commenced 10% operatorship in August 2019 0% Aug Sep Oct Nov D

  17. Slide 17: Focused on recovery improvement

    Six Donut Launders Process Control Short Interval Control Additional Capacity Focused on recovery improvement

  18. Slide 18: Facilities uplift enhancing appeal and preparing for growth

    Facilities uplift enhancing appeal and preparing for growth

  19. Slide 19: Multiple higher grade intercepts

    Multiple higher grade intercepts Results include: RC 611: 628m @ 1.7g/t Au and 0.91% Cu 1. The information in this slide that relates to exploration results at Red Chris has been extracted from the Newcrest release titled “Exploration Update” dated 10 September 2020 and other prior exploration relea

  20. Slide 20: Block caving potential to unlock value

    Block caving • Block caving enables relatively low operating cost extraction of ore potential to • Ability to mine >1km below surface unlock value Subsidence zone Caving levels Comparative surface impact Comparative surface impact Cadia hill open pit Cadia East subsidence zone Waste rock dumps 20

  21. Slide 21: Developing world leading undercutless technology

    Benefits: Developing • Safety: Reduces number of people, and time spent, in deep caves world leading • Cost: Aim to be ~30% lower cave establishment costs compared with the advanced undercutless undercutting cave establishment methodology technology • Speed: Aim to be ~10% faster in overall cave blo

  22. Slide 22: PFS on track

    PFS on track Areas of focus • Updated block model incorporating latest drilling • Mining methods Mining • Materials handing options • Geotechnical, hydrogeological and metallurgical characterisation • Processing plant size and configuration Processing • Application of technology (e.g. Hydrofloat) •

  23. Slide 23: Significant exploration tenements

    Significant exploration tenements

  24. Slide 24: Working with the Tahltan

    • Tahltan Nation is the Indigenous Nation whose territory the Red Chris mine is situated within Working with the Tahltan • Impact Benefit and Co-Management Agreement • Respect for and recognition of culture • Increased Tahltan workforce • Increased commercial partnering • Working with Tahltan Centra

  25. Slide 25: Havieron

    Havieron

  26. Slide 26: Success of Newcrest's early stage entry approach to exploration

    Success of Newcrest’s early stage JunQ 2019 DecQ 2019 1 April 2020 DecQ 2020 Late 2021 entry Drilling 18,888m Earned 40% Initial PFS commenced drilled interest resource approach to 2,800m drillled1 exploration Mar 2019 SepQ 2019 MarQ 2020 JunQ 2020 End 2020/ Entered 9,180m 17,231m 28,714m Early 2021

  27. Slide 27: Higher grade crescent zone

    Higher grade crescent zone Results include: HAD049: 82m @ 6.1g/t Au and 0.41% Cu HAD059: 109m @ 6.3g/t Au and 0.71% Cu Legend 0 50 100m Crescent Sulphide Zone Slice -300mRL 1. The information on this slide relating to exploration 1g/t Au LF Shell Slice -300mRL results at Havieron has been extracted

  28. Slide 28: Higher grade zone

    Higher-grade arcuate sulphide mineralised zone Higher grade zone LEGEND LEGEND Geology Geology Post Mineral Post Mineral Dy ke Dy ke Au (g/t) Leapfrog Cu_Pct Leapfrog Grade Contours & Grade Contours & Downhole Intercepts Downhole Intercepts > 5 g/t > 0.75% 1. The information on this slide relating t

  29. Slide 29: Next steps

    Potential to start construction of an exploration decline by the end of CY2020 or Next steps early 2021 Initial resource by end of December 2020 Next Steps1 ~80,000+ metres of planned drilling in FY21 Study on selective and bulk underground mining options Potential to achieve commercial production w

  30. Slide 30: Paterson province - renewal

    122º00’E Telfer 21º00’S Paterson province - renewal Nifty TELFER Havieron O’Callaghans 22º00’S Legend Maroochydore Newcrest tenements Wi l ki JV tenements Ha vi eron JV tenement Grea tland tenement 20 kms

  31. Slide 31: Working with the Martu People

    Working with • Martu People are the Traditional Owners of the the Martu land on which Telfer and Havieron are located People • Respect for and recognition of culture • Indigenous Land Use Agreement • Training and employment • Community programs • COVID-19 Community Support Fund

  32. Slide 32: What makes Newcrest different

    What makes Newcrest Long Low cost different reserve life production Do what Organic growth options (at Cadia, Lihir, Wafi-Golpu, we say Havieron & Red Chris) Strong exploration & technical Financially robust capabilities 32

  33. Slide 33: Find out more

    Find out more: www.newcrest.com Engage with us +61 3 9522 5717 +1 866 396 0242