Tlou Energy Ltd · ASX:TOU
Tlou Energy — ASX Spotlight – Asia 2014
21 slides from Tlou Energy's conference presentation, May 27, 2014

Slide 1: ASX Spotlight – Asia
ASX SPOTLIGHT – ASIA Hong Kong, 27th May 2014 Singapore, 29th May 2014 Anthony (Tony) Gilby, CEO

Slide 2: Disclaimer
Disclaimer Disclaimer This presentation (Presentation) has been prepared by Tlou Energy Limited (Tlou). The Presentation and information contained in it is being provided to shareholders and investors for information purposes only. The information contained in this disclaimer does not constitute an

Slide 3: Disclaimer (continued)
Disclaimer (continued) Future performance This Presentation contains certain “forward-looking statements”. Forward looking words such as, “expect”, “should”, “could”, “may”, “plan”, “will”, “forecast”, “estimate”, “target” and other similar expressions are intended to identify forward-looking statem

Slide 4: Tlou Energy Limited
Tlou Energy Limited Tlou Energy - Overview Locations & Team Operations Lesedi CBM Project Resource Statement Commercialisation Forward Plan Summary 4

Slide 5: Tlou Energy – Overview
Tlou Energy – Overview Africa’s Most Advanced Lesedi CBM Project CBM Company The most advanced unconventional gas project in Botswana – 100% owned Independently Certified Contingent Resources (NSAI) 152 BCF (2C) 2,322 BCF (3C) Significant market opportunity Strong demand Gas to replace diesel genera

Slide 6: Locations
Locations Experienced Team with Established In-Country Presence Australia: Brisbane Office Corporate Head Office Experienced Board and management team Africa: Johannesburg & Gaborone Offices Johannesburg - Administrative office Gaborone - In-country office Manages key relationships with st

Slide 7: Team
Team Proven Track Record of Success Board Nathan Mitchell Anthony (Tony) Gilby Chairman Chief Executive Officer 17 years in resource exploration Geologist with 28 years industry experience Executive Chairman of Mitchell Services Co-founder and previous CEO of Limited (ASX:MSV) Sunshine Gas

Slide 8: Operations
Operations Botswana Activities Tenement Position Exploration to Date Current Operational Focus ~7,000km2 of granted CBM 70+ wells drilled which has Lesedi CBM Project permits in the Karoo Kalahari provided a large database of Successfully completed 2013 Basin the area Horizontal Pilot Pod pr

Slide 9: Botswana Field Camp
Botswana Field Camp Main Operations Camp Purpose built 20-30 personnel onsite Permanent & temporary accommodation Full time security and medical support Fully equipped with critical machinery and spares Significant operational equipment & vehicles ~30 minutes to Lesedi operations Tem

Slide 10: Lesedi CBM Project
Lesedi CBM Project Most Advanced CBM Project in Botswana Two Horizontal Pilot Pods drilled in 2013: Three-well infill coring program successfully ― Lesedi completed in April 2014 ― Selemo ― Provides further data around pilot pods Pilot well design similar to successful methods ― Core holes com

Slide 11: Horizontal Well Design
Horizontal Well Design Horizontal Pilot Pods Horizontal wells (~750m in-seam) with vertical intercept pumping well Lesedi completed with dual laterals Selemo completed as a single lateral Target Reservoir: Basal Morupule coal seam (~6m) Testing results will underpin reserve certification S

Slide 12: Production Update
Production Update May 2014 Lesedi Pilot Pod – Dual Lateral wells ― Dewatering continuing ― Pump capacity increased in May ‘14 ― Current water rate ~250+ barrels per day ― Larger reservoir area accessed by dual laterals (cf. Selemo) Selemo Pilot Pod – Single Lateral well ― Critical Gas Desorption

Slide 13: Geological Prospectivity
Geological Prospectivity Coal Seams Display Attractive Features Reservoir Distribution Wells intersect coals at depths of ~300-700m Cumulative net coal thickness averaging ~25m Coal seams laterally continuous Reservoir Properties Gas contents ~4m3/t Drill stem tests (DST) indicate an unsti

Slide 14: Independently Certified Contingent Resources (NSAI)
Independently Certified Contingent Resources (NSAI) Resource Statement First CBM Operator in Botswana to achieve a NSAI Contingent Resource OGIP(2) Unrisked Gross (100 Percent) Unrisked Net (100 Percent) Category (BCF) (BCF) (BCF) 152 BCF (2C) & 2,322 BCF (3C) contingent Contingent Resources resou

Slide 15: Commercialisation
Commercialisation Numerous Local and Regional Opportunities Local Botswana Opportunities Existing 10 PJ pa off-take opportunity in Botswana Gas replacement for diesel power Initial field production – CNG: To Kodibeleng (~80km), nearest sub-station Pipeline to Orapa (~149km) to fuel 90MW po

Slide 16: Botswana
Botswana Favourable Environment for Resource Investment Growing economy Corruption Perceptions Index Stable, democratic government Low cost environment Local stakeholders supportive of Tlou’s activities given desire to: Score Very 9.0–10.0 ― Reduce foreign electricity Clean 8.0–8.9 dependenc

Slide 17: Botswana Electricity Supply / Demand
Botswana Electricity Supply / Demand Estimate (MW) 1,200 Demand far outweighs supply Peak demand ~600MW (2013 est.) 900 Supply Current local supply < 400MW commissioning (2013 est.) issues Daily power outages 600 SA (Eskom) imports 100MW Non-firm, expire 2015 Morupule B commissioning iss

Slide 18: Botswana CBM Landscape
Botswana CBM Landscape Competitive Landscape Tlou (and predecessors) have had continuous Botswana operations since 2007 Being in-country with advanced data allows Tlou to rapidly move towards commercialisation Other oil & gas companies that have had activities in the region include: Origin/S

Slide 19: Forward Plan
Forward Plan 2014/15: Focus on Reserves and Field Development Demonstrate Assess data Conduct commercial Secure MOU from infill expanded gas flows at for gas coring program Lesedi & supply Selemo Pilot program Pods Complete dewatering Three-well infill coring Work commenced on Additional pod

Slide 20: Summary
Summary Aiming to become a key player in the solution to southern Africa’s energy crisis CBM developer focussed on Botswana ASX: TOU Market Cap: ~A$49m Cash Balance: ~A$11.3m (March 2014) Independently Certified Contingent Resources (NSAI) Fully funded to complete CY 2014 work program to

Slide 21: Tlou Energy Limited contact details
Tlou Energy Limited 210 Alice Street Brisbane QLD 4000 Australia www.tlouenergy.com info@tlouenergy.com
Source: Internet Archive copy of tlouenergy.com
More decks from Tlou Energy Ltd
Investor Presentation (April 2025)27 slides · Apr 2, 2025
Shareholder Meeting (November 2024)19 slides · Nov 26, 2024
Investor Presentation (December 2023)16 slides · Dec 15, 2023
Shareholder Meeting (October 2023)15 slides · Oct 31, 2023
Shareholder Meeting (October 2022)17 slides · Oct 18, 2022
Investor Presentation (September 2022)17 slides · Sep 15, 2022