Tlou Energy Ltd · ASX:TOU

Tlou Energy — ASX Spotlight – Asia 2014

21 slides from Tlou Energy's conference presentation, May 27, 2014

  1. Slide 1: ASX Spotlight – Asia

    Slide 1: ASX Spotlight – Asia

    ASX SPOTLIGHT – ASIA Hong Kong, 27th May 2014 Singapore, 29th May 2014 Anthony (Tony) Gilby, CEO

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer Disclaimer This presentation (Presentation) has been prepared by Tlou Energy Limited (Tlou). The Presentation and information contained in it is being provided to shareholders and investors for information purposes only. The information contained in this disclaimer does not constitute an

  3. Slide 3: Disclaimer (continued)

    Slide 3: Disclaimer (continued)

    Disclaimer (continued) Future performance This Presentation contains certain “forward-looking statements”. Forward looking words such as, “expect”, “should”, “could”, “may”, “plan”, “will”, “forecast”, “estimate”, “target” and other similar expressions are intended to identify forward-looking statem

  4. Slide 4: Tlou Energy Limited

    Slide 4: Tlou Energy Limited

    Tlou Energy Limited  Tlou Energy - Overview  Locations & Team  Operations  Lesedi CBM Project  Resource Statement  Commercialisation  Forward Plan  Summary 4

  5. Slide 5: Tlou Energy – Overview

    Slide 5: Tlou Energy – Overview

    Tlou Energy – Overview Africa’s Most Advanced Lesedi CBM Project CBM Company The most advanced unconventional gas project in Botswana – 100% owned Independently Certified Contingent Resources (NSAI) 152 BCF (2C) 2,322 BCF (3C) Significant market opportunity Strong demand Gas to replace diesel genera

  6. Slide 6: Locations

    Slide 6: Locations

    Locations Experienced Team with Established In-Country Presence Australia: Brisbane Office  Corporate Head Office  Experienced Board and management team Africa: Johannesburg & Gaborone Offices  Johannesburg - Administrative office  Gaborone - In-country office  Manages key relationships with st

  7. Slide 7: Team

    Slide 7: Team

    Team Proven Track Record of Success Board Nathan Mitchell Anthony (Tony) Gilby Chairman Chief Executive Officer  17 years in resource exploration  Geologist with 28 years industry experience  Executive Chairman of Mitchell Services  Co-founder and previous CEO of Limited (ASX:MSV) Sunshine Gas 

  8. Slide 8: Operations

    Slide 8: Operations

    Operations Botswana Activities Tenement Position Exploration to Date Current Operational Focus  ~7,000km2 of granted CBM  70+ wells drilled which has  Lesedi CBM Project permits in the Karoo Kalahari provided a large database of  Successfully completed 2013 Basin the area Horizontal Pilot Pod pr

  9. Slide 9: Botswana Field Camp

    Slide 9: Botswana Field Camp

    Botswana Field Camp Main Operations Camp  Purpose built  20-30 personnel onsite  Permanent & temporary accommodation  Full time security and medical support  Fully equipped with critical machinery and spares  Significant operational equipment & vehicles  ~30 minutes to Lesedi operations  Tem

  10. Slide 10: Lesedi CBM Project

    Slide 10: Lesedi CBM Project

    Lesedi CBM Project Most Advanced CBM Project in Botswana  Two Horizontal Pilot Pods drilled in 2013:  Three-well infill coring program successfully ― Lesedi completed in April 2014 ― Selemo ― Provides further data around pilot pods  Pilot well design similar to successful methods ― Core holes com

  11. Slide 11: Horizontal Well Design

    Slide 11: Horizontal Well Design

    Horizontal Well Design Horizontal Pilot Pods  Horizontal wells (~750m in-seam) with vertical intercept pumping well  Lesedi completed with dual laterals  Selemo completed as a single lateral  Target Reservoir: Basal Morupule coal seam (~6m)  Testing results will underpin reserve certification S

  12. Slide 12: Production Update

    Slide 12: Production Update

    Production Update May 2014  Lesedi Pilot Pod – Dual Lateral wells ― Dewatering continuing ― Pump capacity increased in May ‘14 ― Current water rate ~250+ barrels per day ― Larger reservoir area accessed by dual laterals (cf. Selemo)  Selemo Pilot Pod – Single Lateral well ― Critical Gas Desorption

  13. Slide 13: Geological Prospectivity

    Slide 13: Geological Prospectivity

    Geological Prospectivity Coal Seams Display Attractive Features Reservoir Distribution  Wells intersect coals at depths of ~300-700m  Cumulative net coal thickness averaging ~25m  Coal seams laterally continuous Reservoir Properties  Gas contents ~4m3/t  Drill stem tests (DST) indicate an unsti

  14. Slide 14: Independently Certified Contingent Resources (NSAI)

    Slide 14: Independently Certified Contingent Resources (NSAI)

    Independently Certified Contingent Resources (NSAI) Resource Statement First CBM Operator in Botswana to achieve a NSAI Contingent Resource OGIP(2) Unrisked Gross (100 Percent) Unrisked Net (100 Percent) Category (BCF) (BCF) (BCF)  152 BCF (2C) & 2,322 BCF (3C) contingent Contingent Resources resou

  15. Slide 15: Commercialisation

    Slide 15: Commercialisation

    Commercialisation Numerous Local and Regional Opportunities Local Botswana Opportunities  Existing 10 PJ pa off-take opportunity in Botswana  Gas replacement for diesel power  Initial field production – CNG:  To Kodibeleng (~80km), nearest sub-station  Pipeline to Orapa (~149km) to fuel 90MW po

  16. Slide 16: Botswana

    Slide 16: Botswana

    Botswana Favourable Environment for Resource Investment  Growing economy Corruption Perceptions Index  Stable, democratic government  Low cost environment  Local stakeholders supportive of Tlou’s activities given desire to: Score Very 9.0–10.0 ― Reduce foreign electricity Clean 8.0–8.9 dependenc

  17. Slide 17: Botswana Electricity Supply / Demand

    Slide 17: Botswana Electricity Supply / Demand

    Botswana Electricity Supply / Demand Estimate (MW) 1,200  Demand far outweighs supply  Peak demand ~600MW (2013 est.) 900 Supply  Current local supply < 400MW commissioning (2013 est.) issues  Daily power outages 600  SA (Eskom) imports 100MW Non-firm, expire 2015  Morupule B commissioning iss

  18. Slide 18: Botswana CBM Landscape

    Slide 18: Botswana CBM Landscape

    Botswana CBM Landscape Competitive Landscape  Tlou (and predecessors) have had continuous Botswana operations since 2007  Being in-country with advanced data allows Tlou to rapidly move towards commercialisation  Other oil & gas companies that have had activities in the region include:  Origin/S

  19. Slide 19: Forward Plan

    Slide 19: Forward Plan

    Forward Plan 2014/15: Focus on Reserves and Field Development Demonstrate Assess data Conduct commercial Secure MOU from infill expanded gas flows at for gas coring program Lesedi & supply Selemo Pilot program Pods  Complete dewatering  Three-well infill coring  Work commenced on  Additional pod

  20. Slide 20: Summary

    Slide 20: Summary

    Summary Aiming to become a key player in the solution to southern Africa’s energy crisis  CBM developer focussed on Botswana  ASX: TOU  Market Cap: ~A$49m  Cash Balance: ~A$11.3m (March 2014)  Independently Certified Contingent Resources (NSAI)  Fully funded to complete CY 2014 work program to

  21. Slide 21: Tlou Energy Limited contact details

    Slide 21: Tlou Energy Limited contact details

    Tlou Energy Limited 210 Alice Street Brisbane QLD 4000 Australia www.tlouenergy.com info@tlouenergy.com

Source: Internet Archive copy of tlouenergy.com

More decks from Tlou Energy Ltd

All 48 Tlou Energy decks