Luca Mining Corp · TSXV:LUCA

Luca Mining — Investor Presentation (February 2026)

26 slides from Luca Mining's investor presentation, Feb 26, 2026

  1. Slide 1: Optimization Exploration Expansion

    February 2026 TSX-V: LUCA | OTCQX: LUCMF | FRANKFURT: Z68 | L U C A LMUI CNAI MN IGN .I C NGO .MC O M 1 Optimization Exploration Expansion

  2. Slide 2: Forward Looking Statements

    LUCAMINING.COM 2 Canadian regulatory agencies and available at www.sedarplus.ca. The Company Company’s anticipated future business operations. The Company disclaims any FORWARD LOOKING STATEMENTS believes that the expectations reflected in Forward-Looking Information in this Corporate Presentation a

  3. Slide 3: Mexico Mining Experts

    LUCAMINING.COM 3 MEXICO MINING EXPERTS Some of the largest mining companies in the world Mining in Mexico surround us in Mexico We know Mexico - and our experienced management team and our knowledge of the Mexican mining landscape give us a competitive advantage 3

  4. Slide 4: Our Metal Breakdown

    LUCAMINING.COM 4 OUR METAL BREAKDOWN 2025 Revenue 18% COPPER ~60/40 Precious and Base metals 4

  5. Slide 5: The Luca Story

    LUCAMINING.COM 5 The Luca Story TAHUEHUETO 2 Fully permitted operating mines in DE-RISKED OPERATIONS Fully permitted No further major capex required FREE CASH FLOW 2025 ESTIMATE Beat Revised Guidance of $5 to $10 million Dec 31: Increased cash to US$25.5 million from US$15.9M at Sept 30 Mexico produ

  6. Slide 6: Financial turnaround

    LUCAMINING.COM 6 Financial turnaround Debt materially reduced and liquidity rebuilt to support growth Debt Reduction Liquidity Improvement Balance Sheet Reset From $31M to ~$2M ⇧ Cash increased to ~$26M ✓ Net cash position achieved $30 300 $25 250 What This Enables $20 200 ✓ Removes need for Shares

  7. Slide 7: Our Plan

    LUCAMINING.COM 7 Our Plan Strong track record of execution backstops our future ambitions Continue exploration Evaluate M&A Dan Barnholden First drillhole at Commercial Full repayment CME construction Tahuehueto stream joins as CEO Tahuehueto in >10 Buy back of production at of bank debt decision te

  8. Slide 8: Three-year Exploration Program

    LUCAMINING.COM 8 Three-year Exploration Program to Unlock Gold Potential at both mines US$25M Budget 38 Priority Targets at Supports 80,000 metres of Campo Morado surface and underground drilling Coincident gravity geophysical and soil Exploration is fully- at Campo Morado and anomalies have never b

  9. Slide 9: What this Means

    LUCAMINING.COM 9 What this Means Our mines are permitted, Our mines have Luca is heading towards re-ranking in production and development and resource as a mid-tier producer generating cash flow – upside and optimization at our foundation on which to both projects is ongoing grow Clean balance sheet

  10. Slide 10: Skills we bring to de-risk M&A

    LUCAMINING.COM 10 Skills we bring to de-risk M&A To grow as a premier Mexico focused mining company Financial Operations Luca has the expertise to restructure Luca has turned around Campo Morado, and recapitalize on accretive terms increasing throughput to 2,000tpd, achieved All opportunities are ✓

  11. Slide 11: Campo Morado

    LUCAMINING.COM 11 GLOBAL M&I GOLD ZINC COPPER SILVER LEAD 16.6 Mt M&I 700 Koz M&I 1.2 Blbs M&I 0.2 Blbs M&I 62 Moz M&I 0.3 Blbs M&I CAMPO Location Guerrero State 121 sq km Processing 2,400 tpd throughput capacity (crushing, milling, flotation) MORADO Ownership 100% 2025E Production Achieved Revised

  12. Slide 12: Redefining Campo Morado

    LU LUCC AMAM I NI N I NI N GG. C. C OOMM 1212 Redefining campo morado Transitioning from zinc-focused operations to a higher-margin precious metals platform 1 Initial design (2009) 2 Current design 3 CME Phase 1 4 CME Phase 2 • High-grade zinc mine utilizing sequential • Sequential flotation and 15

  13. Slide 13: Recent drilling success

    LUCAMINING.COM 13 Recent drilling success Un-mined Deposits Higher Precious Metals Grades First drilling in >10 years July 7, 2025: First Surface Drill Result at Reforma 15.1 metres of 13.4 g/t AuEq (5.35 g/t Au, 187.48 g/t Ag, 0.31% Cu, 8.39% Zn, 2.75% Pb) Aug 27, 2025: Additional Drill Results at

  14. Slide 14: Reforma – The future of Campo Morado

    LUCAMINING.COM 14 Reforma – The future of campo morado • Current Mining Areas: Southwest, G9 Zones, El Largo • Large stopes 40m wide, productive, low-cost mining • Current mining cost: $41/t • Starting in 2028: Reforma and El Rey Zones will be primary source of ore feed • More efficient mining metho

  15. Slide 15: Exploration upside at Campo Morado

    L U CC A AMM II N N II NN GG .. CC OOM M 15 12 Main Declines, Development exploration upside G9, Naranjo and Largo Ore Bodies at Campo morado • Well-defined, drilled and developed ore bodies • Expand gold and silver-rich Mineral Resources • 38 exploration targets • >12,000-hectare mining concession

  16. Slide 16: Tahuehueto

    LUCAMINING.COM 16 GLOBAL M&I GOLD ZINC COPPER SILVER LEAD 6.3 Mt M&I 425 Koz M&I 273 Mlbs M&I 36 Mlbs M&I 9 Moz M&I 123 Mlbs M&I Tahuehueto Location Durango State 100 sq km Processing 1,200 tpd throughput capacity (crushing, milling, flotation) Ownership 100% 2025E Full Year Achieved Revised Guidanc

  17. Slide 17: Tahuehueto

    LUCAMINING.COM 17 District Scale Potential – 100 km2 – Tahuehueto 18 Veins Mapped on LEVEL 12 & 14 PORTALS Property LEVEL 20 PORTAL CRUSHING CIRCUIT MINE CAMP PROCESS PLANT 17

  18. Slide 18: Transformative exploration potential at Tahuehueto

    LUCAMINING.COM 18 Transformative exploration potential at tahuehueto CONNECTING CRESTON/EL PERDIDO TO SANTIAGO Drilling is underway to investigate the highly prospective gap between El Perdido and Santiago with two active rigs Zones are open along strike and to depth EARLY RESULTS CONFIRM GROWTH POT

  19. Slide 19: Luca corporate stats

    LUCAMINING.COM 19 2.50 Luca corporate stats 2.00 PRICE CHART 1.50 One Year LUCA LUCMF Z68 1.00 TSXV OTCQX Frankfurt 0.50 Shares 269 million Outstanding 0.00 Fully Diluted 290 million Market Cap C$503 million (C$1.87/share) (Feb 26, 2026) ANALYSTS 52 Week C$2.16 high Haywood Buy C$4.50 C$0.99 low SHA

  20. Slide 20: A strong Board of directors

    LUCAMINING.COM 20 A strong Board of directors Mine builders | Opportunity driven Phil Brumit DIRECTOR Peter Damouni CHAIRMAN, DIRECTOR Mr. Brumit is a mining executive with over 40 years of experience in Over 20 years of corporate and investment banking experience with a property evaluation, enginee

  21. Slide 21: A strong Management Team

    LUCAMINING.COM 21 A strong MANAGEMENT TEAM Effective Execution Dan Barnholden, CEO Dan Barnholden is a seasoned professional with over 20 years of experience in senior mining investment banking roles at bank-owned Ramon Mendoza M.Sc., P.Eng. COO & CTO and boutique dealers in Toronto and Vancouver .

  22. Slide 22: What's next

    LUCAMINING.COM 22 What’s next We see a near-term With significant And longer term valuation re-rating additional upside growth ahead The Campo Morado Production upside at both mines M&A growth copper/zinc/gold/silver mine has Targeting doubling production in the Targeting mid-tier ranking with under

  23. Slide 23: Thank You

    LUCAMINING.COM 23 Thank You LUCAMINING.COM TSX-V: LUCA OTCQX: LUCMF FRANKFURT: Z68

  24. Slide 24: Appendix

    LUCAMINING.COM 24 APPENDIX 24

  25. Slide 25: Campo Morado Resources

    LUCAMINING.COM 25 Campo Morado Resources RESOURCES (NI 43-101 Compliant, March 2018) 25

  26. Slide 26: Tahuehueto resources

    LUCAMINING.COM 26 Tahuehueto resources RESERVES & RESOURCES (NI 43-101 Compliant, April 2022) 26

Luca Mining — Investor Presentation (February 2026) on 6ix