New Found Gold Corp · TSX:NFGC
New Found Gold — Investor Presentation (November 2026)
70 slides from New Found Gold's investor presentation, November 2026

Slide 1: Canada's Newest Gold Producer
TSX/ NYSE-A: “N NEWFOUNDGOLD CANADA’S NEWEST GOLD PRODUCER Corporate Presentation —- November 2026

Slide 2: Disclaimer
NEWFOUNDGOLD ~ DISCLAIMER a ‘This presentation, and theiinformation contained herein, has been provided to you by New Found Gold Corp. ("New Found Gold”, *NFGC" or the “Company/") solely for information purposes. ‘While the information contained inthis presentation is believed o be accurate, New Fou

Slide 3: Why New Found Gold
ay WHY NEW FOUND GOLD NEWFOUNDGOLD é ewrounDLAno™ (w) GROWING GOLD PRODUCER | ¥ FULLY FUNDED TO PRODUCTION é Ax<& top MINING JURISDICTION | EEE ares NEWFOUNDLAND AND LABRADOR, CANADA me : HAMMERDOWN GOLD MINE (]))) am PROLIFIC PROPERTY PACKAGE | GENERATIONAL POTENTIAL ee! Grand Falls Windsor” He EXP

Slide 4: Key Assets
KEY ASSETS ee PINE COVE MILL ep [G NewFound Gold Projects. | r , “p at © Deposit Permitted mill and tailings facility Bale Vor YE once cous war 5 © Ma Hub and Spokes Mine Plan: : {PINE Cove miLt 4) % Airport . Trans-Canada Highway = Currently processing 700 tpd from Hammerdown — Road / Secondary Hig

Slide 5: Production Profile and Cashflow
PRODUCTION PROFILE AND CASHFLOW i NEWFOUNDGOLD EO The Path to ~200,000 Ounce Annual Gold Production with Strong Cashflow AISC': Queensway: US$1,375/0z Hammerdown: US$2,429/0z a0 Combined: — US$1,510/oz $5000 = 2 g ee ~194 Kozi/yr $2,500 ¢ 8 200 $2,000 § zy ~129 Koz/yr £ 8 z = 150 $1,500 g £ Es & 5 3

Slide 6: Funded to Production
ay FUNDED TO PRODUCTION NEWFOUNDGOLD Funded to Advance Queensway with Existing Debt Facility, Cash Position & Hammerdown Cashflows Funding Position (C$ million) Sources | Uses $61 $290 ($150) — $17 ' H $35 — ' ' om oe ' ‘ ($27) i ‘ Saar - gee ($45) $68 Cash & EdgePoint Senior {ITM Warrants Hammerdow

Slide 7: Capital Structure
CAPITAL STRUCTURE en A) CAPITALIZATION" a\) KEY SHAREHOLDERS Shares - Basic 386.2M Options, RSUs & DSUs 10.2M _| Warrants? 14.7M ERIC SPROTT 19% Shares -F.D. 411.1M Share Price $2.02 amy Market Cap ~$780M - EDGEPOINT 52 Week High/Low $4.89/$1.88 Average Daily Volume ~2.3M INCLUDED IN VAN ECK JUNIOR

Slide 8: Directors & Senior Leadership
DIRECTORS & SENIOR LEADERSHIP New Found Gold has a new board and management team with as successful mine development and operation ay Paul Andre Huet Chair Chad Williams" ay Keith Boyle CEO Dr. Fiona Childe VP Communications & Corporate Development 11 Independent, 2 Lead Director Tamara Brown’? Alle

Slide 9: Queensway 2026 PEA Highlights
ay QUEENSWAY 2026 PEA HIGHLIGHTS NEWFOUNDGOLD $1.7B / $2.2B Avg. Annual AISC / Cash Cost NPV (506) (Attertox; base/upside)* US$1,375/oz / US$985/0z 126% / 164% Total Production (15 year mine tife) IRR atter-tax; base/upside) 1.7 Moz Au $2.56B / $836M Avg. Head Grade ¢ehase1/Lom) After-tax Cash Flows

Slide 10: Queensway Development Strategy
QUEENSWAY DEVELOPMENT STRATEGY ee cere Three-phase, self-funded development strategy: — Ooo — Oo! cee | 2027 - 2030 2031 - 2032 2031 - 2032 + Milling of OP mineralized material + OP and UG mineralized material * Queensway Mill Gravity- Flotation circuit expanded (5,000 tpd) to more rapidly process s

Slide 11: Queensway Development
QUEENSWAY DEVELOPMENT en Queensway Life of Mine Plan 2028-2030: 2031-2035: $150M unlocks 200 Ave. Production 104 koz/yr Ave, Production169 koz/yr 2,000 average annual 180 1,800 production of = 160 1,600 169 koz Au 2 1a 1,400 by 2031 8 120 1200 2 J Phase1 : an 1000 initial capital g ao secured cd aid

Slide 12: Queensway Leverage to Gold Price
QUEENSWAY LEVERAGE TO GOLD PRICE Queensway PEA: After-Tax Economics High Leverage to Gold Price Y 100% of revenue from gold v¥ $100 M increase in NPV xo, for each US$100 increase in gold price Cautionary note: Pictures of se lected core with free gold are not intended to be repre 3,000 2,500 87 2,00

Slide 13: Creating Value Through Exploration
\ } CREATING VALUE THROUGH EXPLORATION‘: en Queensway Key Exploration Milestones & Expenditures Discovery to 2023 2024 Drilling 2025 Drilling? 2026 Drill Program* 2026 Target Overview * Delineation along AFZ, * Resource-definition * +74,000m (614 DDH) + Program underway ~ focus on mostly <200m depth

Slide 14: Hammerdown Growth Potential
ay \ HAMMERDOWN GROWTH POTENTIAL NEWFOUNDGOLD eee (A) DEER cove } — Trans-Canada Highway (A) STOG’ER TIGHT =o (@) pine cove |" Baie Verte, i —el ws 1 ay PINE COVE ©! MING MINE % FireFly ) AN oven” |e co 8 a | it ot Oy (() NUGGET POND HGP }~ J aed @ seo 2 WHISKER VALLEY (J) { HAMMERDOWN fj) a er Rock

Slide 15: Pathway to Value Creation
PATHWAY TO VALUE CREATION sence z Sree Initial MRE Commercial G eae & Scoping Production 6 : ‘ale Ongoing Exploration The time to buy... v Fully financed to build Queensway Phase 1 Y Graduated tsk v Development & production milestones achieved the Toronto Stock Exchange aaa v Well-positioned for pro

Slide 16: Key Reasons to Invest
ay KEY REASONS TO INVEST NEWFOUNDGOLD FULLY FUNDED TO PRODUCTION NEWFOUNDLAND AND LABRADOR, CANADA GENERATIONAL POTENTIAL EXPERIENCED TEAM BOTTOM OF LASSONDE CURVE

Slide 17: Contact
NEWFOUNDGOLD CONTACT Fiona Childe | Ph.D., P.Geo. VP, Communications & Corporate Development ® +1-416-775-2700 | +1-709-722-2984 ( contact@newfoundgold.ca in) https://www.linkedin.com/company /newfound-gold-corp ay NEWFOUNDGOLD

Slide 18: Appendix
APPENDIX

Slide 19: Location - North American Overview
Location - North American Overview Nea 1,000 2,000 km Located in Newfoundland and Labrador, Canada POWERED BY #*VRIFY Legend +k New Found Gold Projects © Cities [_) Borders

Slide 20: Location - Newfoundland Overview
Location - Newfoundland Overview POWERED BY *VRII ‘Sous Fn. uso scar Es TuNTOR GN FAD NOE SOS. Cn Pa ‘ea eat Geogptine V8} ROIBSPE Dy CORY SAAD, ‘germane crc mynd

Slide 21: Neighbouring Projects
Neighbouring Projects Legend TB cvecnamay ota reotect GS Raccaveopentions OS TD Equinox Property (2) Gomera Property, TT) canstar Property () Aumega Property Benton Resources Gotaen Riage Property YD) Fiery metate Property > Cities — ‘Trans-Canada Highway KB 50 100 km ibe Oey cube USDA FSAUEGS, HE,

Slide 22: Queensway land package and JBP Fault
f~ JBP Fault © 2 Queensway: large land package that covers a 110 km strike extent along two two major structures controlling gold mineralization. Located along the Trans Canada highway, 15km west of the town of Gander. POWERED BY #*VRIFY

Slide 23: Queensway Updated MRE
Queensway Updated MRE (AFZ Core, AFZ Peripheral and JBP) Updated E Tonnage Gold Content (et) (koz Au) AFZ Peripheral Appleton Fault % Diference Contained Gott Contained Goes (ter a JBP Fault AFZ Core POIVERED BY VRIFY

Slide 24: AFZ Core Mineral Resource
_ AFZ Core Mineral 4 eae fim es cK Roe Se "— AFZ Core | pare val POWERED BY 3¢VRIFY %

Slide 25: Block Model Grade
= Ta = ge 7 Se Block Model Grade Au g/t; ~~ > fo < >. = 2 Sees

Slide 26: Minable Resource Block Model
Minable Resource block model showing indicated and inferred minable resources at and above 3.0 g/t Au Sy, LE

Slide 27: Keats & Iceberg Excavations on MRE Block Model
‘ : ‘ : ‘ be : ~ ~ . >), Keats & Iceberg excavations overlain on MRE block model. Keats excavation mapped & sampled in 2024; Iceberg Ke e . @ ,% ee = excavation mapped & sampled in 2025. P & ~ 3 - + *, y fs a ae ere BY ey . : , « ® a)

Slide 28: Iceberg Grade Control Drill Results
NFGC-25-GC-106 31.6 g/t Au over 18.65 m IB-25-01-16 23.9 g/t Au over 15.12 m IB-25-01-18 NFGC-25-GC-082: 113.0 g/t Au over 2.99 m 43.2 g/t Au over 19.85 m. IB-25-01-40: si NFGC-25-GC-072 47.4 git Au over 7.36 m 44.4 g/t Au over 21.55 m 1B-25-01-10: y : NFGC-25-GC-061 64.8 g/t Au over 6.71m : 35.4 g/

Slide 29: Keats Excavation Grade Control Drilling
POWERED BY #*VRIFY Assay - Au git Bos-10 B 10-20 e 30-100 B00 Keats Excavation Grade Control Drilling NFGC-25-GC-007 104.76 g/t Au over 10.20 m NFGC-25-GC-006 35.31 g/t Au over 12.85 m NFGC-25-GC-009 159.92 g/t Au over 10.30 m NFGC-25-GC-011 38.28 g/t Au over 3.40 m NFGC-25-GC-008 9.29 g/t Au over 1

Slide 30: Queensway Phase 1 Open Pits at AFZ Core
Queensway Phase 1 Open Pits at AFZ Core Legend ‘s, Jackpot Pit is (0) waste Rock Storage Facility > a (1) Mineralized stockpile -_Overburden Storage Facility 0) explosive storage Sedimentation Ponds ; (0) sound Berm “a OD industria terrace en BD open pits w= Haul Roads Iceberg Pit ‘Access Road Trans

Slide 31: Queensway Phase 2-3 Open Pits at AFZ Core
Queensway Phase 2-3 Open Pits at AFZ Core Legend ra |B Weste rock storage Facilty D) mineralized stockpile __Overburden Storage Facility f 1) expiosive storage i} 1 1 . . ¥ | . 1 . it 1 1 1 i ’ ‘=== Powerline (Proposed) ; . Powerline (Existing) %5 . . o ‘Access Road 3 Re 1 Site Infrastructure and Op

Slide 32: Underground Development
LUndaiground Development Bene Bowe PEA Underground Infrastructure and Stope Design POWERED BY #*VRIFY Keats South i Fas Keats UG Infrastructure & Stopes Jackpot

Slide 33: Queensway Depth Potential
ot (250m 500m 1000m Queensway Depth Potential POWERED BY #*VRIFY Depth Potential 0 ghAsour bea al ro even sz0mtaunetsane vata 2aryaar saa Wanativon adniaria\ cet, \ PENS \ roan oer Seen \ Block Model Grade Au git

Slide 34: AFZ Core to AFZ Peripheral
Ce aa AFZ Peripheral AFZ Core to AFZ Peripheral areas with MRE Block Model and PEA Pit Shelis ayn

Slide 35: Strike Potential Realized: Dropkick
Strike Potential Realized: Dropkick =r Dropkick: new high-grade results received post MRE cut-off date, located 11km from AFZ Core area Fs 7 . POWERED BY f ¢VRIFY ( F)

Slide 36: Dropkick Drill Results
POWERED BY #*VRIFY Dropkick Drill Results NFGC-25-2624. 1.25 gjt Au over 10.60 m NFGC-25-2403. 4.54 g/t Au / 19.00m NFGC-25-2408 NFGC-25-2390. 4.55 g/t Au / 28.55m 20.9 gft Au /11.10m NFGC-25-2329 NFGC-25-2394- 8.64 g/t Au / 5.65m 8.31 g/t Au/18.20m NFGC-25-2317 29.2.g/t Au/9.25m NFGC-25-2686; 24.8

Slide 37: Midway Pit
Midway Pit =e Block Model Grade Au g/t: ~ ae Som ~ Dropkick Pit

Slide 38: Dropkick Underground Development
Underground Development @ Development @ Stopes Dropkick Underground Infrastructure POWERED BY #*VRIFY Queensway AFZ Peripheral (Dropkick) UG Infrastructure & Stopes Dropkick UG

Slide 39

Slide 40: Initial MRE within 5% of strike extent
The initial MRE sits within a less than 5% portion of the 110 km long strike extent of the two major structures controlling gold mineralization, where numerous additional gold targets have been identified. — 7 POWERED BY #*VRIFY

Slide 41: AFZ Peripheral
= AFZ Peripheval Ie

Slide 42: Devils Pond South
Devils Pond South #@ — © Devils Pond Pauls Pond Trend 4 3

Slide 43: Queensway Development Schedule
QUEENSWAY DEVELOPMENT SCHEDULE ae Qi 2 BH LB HS tLe GEOLOGY ENGINEERING ENVIRONMENTAL 2026 drill program underway Phase | EPCM underway Provincial EA process underway Focus on de-risking, discovery and Site development and detailed EPR submitted Q4/26 growth offsite mill engineering underway

Slide 44: Queensway 2025 PEA vs Revised PEA
QUEENSWAY 2025 PEA VS REVISED PEA Asin la 1025 PEA Revised PEA What’s the Same What’s Different | Phase | 700 tpd Processing 700 tpd Queensway to Pine Offsite Processing * 700 tpd Nugget Pond retrofit vs 1,400 tpd Pine Cove offsite (Convert Cove (plus converting of existing retrofit and expansion. N

Slide 45: Queensway 2026 PEA Highlights
QUEENSWAY 2026 PEA HIGHLIGHTS en ee $1.7B/$2.2B N PV 504) (After-tax; base/upside) 2025 PEA Key Revisions: 38% increase in M&l mineral resource to 1.92 Moz Added Dropkick Zone to MRE/mine plan Phase 1 with gravity-CIL at 100% owned Pine Cove Mill 126% / 164% Initial mining with a contractor, transit

Slide 46: Queensway 2026 PEA Highlights
QUEENSWAY 2026 PEA HIGHLIGHTS NewrouNoGOLD With stronger economics and an expanded resource base, Queensway is fully funded to become Canada’s next mid-tier gold producer RO} Ave. Annual AISC Ave. Annual Cash Cost US$1,375/o0z US$985/oz ay Total Production (15 year mine life) Ave. Annual Production

Slide 47: Queensway Revised PEA
QUEENSWAY REVISED PEA years "7 Minetfe SY years 15 Mt 28.3 wt 2.09 Mill recoveries (Avg) % 91.5 iDoré Payable % 99.949 % 37.0 % 97.813 Moz Au 1.706 Us$/oz 3,600 $/t milled 29.77 $i milled 171.91 Milling Cost $/t milled 26.78 0: ite Crushing Cost $/t milled 1.75 igs Storage Facility (“TSF” $/t milled

Slide 48: Queensway Revised PEA Project Economics
QUEENSWAY REVISED PEA Project Economics 7 | Selling Cost Estimate $M 53.9 Effective Royalty Rate % 0.42 om 268 otal Operating Cost Estimate $M 2,245.6 otal Sustaining Capital Cost Estimate $M 970.8 otal Growth Capital Cost Estimate $M 832.1 Initial Capital Cost Estimate $M 149.8 $m 1,700.0 ft ‘ax In

Slide 49: Queensway Mining Schedule & Grade
~ QUEENSWAY MINING SCHEDULE & GRADE geweol®scous 200 LOM Avg. Feed Grade: 16.0 180 2.09 g/t Au q40 OU Phase 1 12.0 140 Avg. Feed Gre 13.41 g/t Au S = 120 10.0 ¢ & & = 100 80 § g os EB 80 60 § 60 “ 4.0 40 20 20 2027 2028 2029 2030} 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 mmPhase 1 mPha

Slide 50: Queensway Production & Cash Flow
QUEENSWAY PRODUCTION & CASH FLOW Gold Production (koz) 300 250 200 150 100 50 -50 Phase 1 After Tax Cash Flow: $836 M 2027 2028 2029 2030 mm Phase 1 LOM After Tax Cash Flow: $2.551 B 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 mPhase 2 mm Phase 3 ~® Cumulative After-Tax FCF (base case) 3,

Slide 51: Queensway Production by MRE Category
Gold Production (koz) QUEENSWAY PRODUCTION BY MRE CATEGORY sewro cou 2031 2032 2033 2034 S a 2029 2030 ™ Measured @ Indicated 2035 Inferred 2036 2037 2038 2039 2040 MRE Conversion to Mine Plan 82% / 56% Overall inclusion rate (M&l / Inferred) 82% / 18% Mine plan ounces (M&l / Inferred) 97% Phase | o

Slide 52: Production and Cost Profile
\ \\ \\ s _ PRODUCTION AND COST PROFILE 200 180 Gold Production (koz) eB ooBP Be 2 @»@ S&S BR RF & 8 8 8 8 6 8 ~~ é x 8 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 mmPhase1 mmPhase2 m=Phase3 —AISC Cash Cost and AISC are IFRS measures; see additional notes on non-IFRS m

Slide 53: Queensway Capital Cost Summary
QUEENSWAY CAPITAL COST SUMMARY er ae (C$ millions) Phase 1 Phase 2 Phase3 Sustaining Capital Mining 0.0 130.3 80.6 815.6 Offsite Processing 75.0 0.0 0.0 0.0 Onsite Processing | 0.0 194.7 50.6 0.0 Onsite Infrastructure 15.6 56.9 0.0 L 111.0 Offsite Infrastructure 4.8 a7 0.0 0.0 Indirects/Owner's Cost

Slide 54: Queensway Operating Cost Summary
QUEENSWAY OPERATING COST SUMMARY Life of Mine Operating Cost) Mining (Open Pit) Mini lerground) Off-Site Milling On-Site Milling Material Handling $M G&A $M Total Doré transport and refining charges | Concentrate transport charge | Concentrate treatment and refining charges Penalties Royalties NSR T

Slide 55: Queensway Updated MRE
QUEENSWAY UPDATED MRE Queensway Updated MRE (AFZ Core, AFZ Peripheral and JBP) Notes Category Tonnage Grade Gold Content 1. Mineral resources completed by Christian Beaulieu, P.Geo., of Mineralis (kt) (g/t Au) (koz Au) Consulting Services inc., an independent qualified person as defined by NI 43- Op

Slide 56: Queensway Updated MRE: Grade Control
/ QUEENSWAY UPDATED MRE: GRADE CONTROL > Keats and Iceberg grade control drilling generally confirmed the continuity and grade of the Initial MRE high- grade core » Grade control drilling confirmed the overall tonnage, grade and ounces in a similar volume to the Initial MRE. The capping values used

Slide 57: Queensway Global OP & UG MRE
QUEENSWAY GLOBAL OP & UG MRE BY AREAS AND MAJOR CONTRIBUTORS Area Category Mary Grade Contained Au Tonnage Grade Contained Au Tonnage Grade Contained Au (xt) (git Au) (koz Au) (kt) (wt Au) (koz Au) (kt) (gt Au) (koz Au) Measured 168 5.67 31 oO - oy 168 5.67 31 reer Indicated 6,161 2.01 397 150 5.35

Slide 58: Hammerdown Mineral Resource Estimate
Deposit _| Mining Method Category aaah Measured 2” 8.24 72 Indicated 1,823 1.96 415 Hammerdown'| OpenPit _| Total Measured & 004 eA) ie Indicated Inferred 973 2.59 81 HAMMERDOWN MINERAL RESOURCE ESTIMATE Hammerdown Deposit Updated MRE (effective date January 22, 2026). Hommerdonn MRE Notes: 10. 1” T

Slide 59: Outstanding Warrant Summary
ay OUTSTANDING WARRANT SUMMARY NEWFOUND SOLD Expiry Date Number of Underlying Shares Exercise Price (CAD $) | Proceeds (CAD$M) 2027-04-09 9,403,636 $1.6000 | $15,045,818 2027-04-09 150,000 $1.0000 | $150,000 2027-07-17 363,233 $1.5067 | $547,271 2027-09-11 2,488,030 $0.6667 | $1,658,687 2029-05-15 2

Slide 60: Non-IFRS Financial Measures
IFRS FINANCIAL MEASURES nae Non-IFRS Financial Measures ‘The Company has included certain non-IFRS financial measures in this presentation, including AISC, cash cost, cash operating cost, cash flow and average realized gold price. These financial measures are not defined under International Financia

Slide 61: Hammerdown and Regional Assets Map
« a “ | Legend f B Hammerdow God Project @) {| FireFly Metals Property Ae New Found Gold Assets P “4 4,0 , Cities* 7 * AW occurrence b &. —- Roads — Trans-Canada Highway POWERED BY #*VRIFY

Slide 62: Hammerdown Infrastructure
Infrastructure saing Renae BD wrortcesscocne 2 Sorter Stockpile Hammerdown Deposit Pit orn toate | / | ovata Sort90 Fast ack staosrcty Underarouna | ested E z ” POWERED BY 3¢VRIFY ;

Slide 63

Slide 64: Hammerdown Gold Project Major Faults
& Legend x “ x Mammerdown Gold Project == Mejor Faults = Hammerdown Pit Orion Pit we te POWERED BY #*VRIFY

Slide 65: Stog'er Tight MRE
Stog’er Tight MRE (effective date Januery 22, 2028) - Infrastructure Gra Gontei eeauy (eo — tonts © Block Medel Class StogerTight?” OpenPit. Inferred 2.16 37.8 Beets ecto Berea eS Please see Appendix for table notes —< Gh entre ety ‘ Previously Mined Pit Ae, Previously Mined Pit POWERED BY #*VRIFY

Slide 66: POWERED BY
POWERED BY #*VRIFY

Slide 67: Hammerdown & Orion Block Model (Class)
Hammerdown & Orion Block Model (Class) Hammerdown Pit Orion Pit Block Model Class @ veasured © ndicatea @ wreres POWERED BY #*VRIFY

Slide 68: Hammerdown Block Model (Class)
Hammerdown Block Model (Class) { Block Model Class POWERED BY #*VRIFY

Slide 69: Historic Underground Stopes
Historic underground stopes were mined at a cutoff grade of 8 g/t Au. Material grading approximately 1.5 - 2 g/t Au was not processed and was utilized as backfill. Underground Development [| Historical Stopes POWERED BY #*VRIFY

Slide 70: Previously Mined Pit and Proposed Pits
Previously Mined Pit Previously Mined Pit £ Proposed Pits Block Model Class i | Inferred POWERED BY #*VRIFY
Source: company website
More decks from New Found Gold Corp
Q3 2026 Earnings Presentation20 slides · Nov 12, 2026
Investor Presentation (November 2026)60 slides · November 2026
Investor Day (October 2026)78 slides · Oct 26, 2026
Investor Presentation (October 2026)60 slides · October 2026
Investor Presentation (September 2026)58 slides · September 2026
Investor Presentation (July 2026)56 slides · July 2026