Slide 1: evdnindc Xpu0b, AE.
7 evdnindc Xpu0b, AE. WORLD Oya COUNCIL
Slide 2: Stratoni Project Location
Stratoni Project Location Mine Development Drill ready targets N Road Permit boundary Village Olympias Power line 8.1 km Tunnel Stratoni 10km Piavitsa Operation radius Stratoni Port Facility Fisoka Skouries Tsikara 1 km www.eldoradogold.com 2
Slide 3: Stratoni Project Overview
Stratoni Project Overview Deposit style Replacement mixed sulphide Mining Method U/G Drift & Fill Mine Life 5 years (2016) Reserves (2010) 1.8Mt @ 8.6% Zn, 6.3% Pb and 177g/t Ag = 261Kt Pb & Zn and 10Moz Ag Resources 1.8Mt @ 8.6% Zn, 6.3% Pb and 177g/t Ag (under review) = 261Kt Pb & Zn and 10Moz Ag
Slide 4: Stratoni Reserves & Resources
Stratoni Reserves & Resources Ag Grade Pb Grade Zn Grade Contained Contained Contained Category Tonnes (g/t) (%) (%) Ag (oz) Pb (t) Zn (t) Proven 1,657,000 174.0 6.10% 8.50% 9,300,000 101,000 141,000 Probable 103,000 225.0 8.70% Schist 9.30% 700,000 9,000 10,000 Proven & Probable 1,760,000 176.7 6.2
Slide 5: General Mine Layout
Stratoni General Mine Layout Blue = new accesses completed by Hellas Gold in last 4 years Red = old access to the mine Mining Method - Drift and Fill Surface 400 masl Mining Rate ~1000 tpd New upper decline Existing Workshops 216 level adit 300m 216m New lower decline 134m
Slide 6: Site Layout
Stratoni Site Layout Stratoniki Mavres Mine water Petres treatment Orebody plant Chevalier tailings disposal Mine site offices Karakoli and tailings Stratoni mill changehouse disposal area Emergency mine water storage pond Stratoni Adits Haul Road Brownfield site with low visual impact www.eldorad
Slide 7: Infrastructure
Stratoni Infrastructure Tailings ponds looking SE Stratoni mill Stratoni mill Stratoni Port 7 Stratoni port
Slide 8: Stratoni Concentrator
Stratoni Stratoni Concentrator • Simple conventional processing circuit Schist • Current line will treat up to 400,000tpa ROM Amphibolite Gneiss Marble on a sustained basis Intrusive • Second parallel line could be rehabilitated to provide further throughput • Excellent laboratory, analytical servic
Slide 9: Processing Flow Sheet
Stratoni Processing Flow Sheet Mining Area Mine water at ~300 m3/h Sulphide Ore Mine waters Waste rock Pb:6.9%, Zn:9.7%, Ag:172 g/t COMMERCIAL Flotation Backfilling Neutralisation PRODUCTS 74% Coarse ~56% 8% 18% Flotation tailings Clean PbS ZnS water Fines ~18% Pb: 72% Zn: 50% Sludge Filterpress Sal
Slide 10: Production
Stratoni Production Stratoni 2012 Budget 1H12 2011 2010 Stratoni Underground Production Ore Mined wet tonnes 235,000 122,835 222,074 231,397 Ore Milled dry tonnes 228,000 116,440 214,952 226,783 Schist Zinc Grade % 9.70% 9.76% 9.77% Amphibolite Gneiss 8.62% Lead Grade % 6.00% 6.27% 6.01% 5.63% Marbl
Slide 11: In the Community
Stratoni In the Community Employment The mine at Stratoni is the main employer in the region and is dedicated to employing and training young people from the local villages. Open days are organised by Hellas Gold employees to provide students with an insight into the mining industry Relationships He
Slide 12: Occupational Health & Safety
Occupational Health & Safety Zero Harm Culture Hellas Gold employs a zero harm, pro-active and risk-based approach to managing safety, focused on continuous improvement. Regular safety audits, 10 Golden Rules’ safety system and near miss reporting are carried out. Rescue Service There are trained re
Slide 13: Environment
Stratoni Environment Environmental Parameters Monitored • Air quality (dust and air emissions) • Meteo data • Water (surface, ground, potable and sea water) • Soils • Noise • Mining wastes • Biodiversity • Vibration • Seismicity Independent Environmental Committee • Consists of 7 members; three univ
Slide 14: Future Considerations
Stratoni Future Considerations • Increase geological resources Schist • Potential for increasing annual production to 350,000 tonnes Marble • Potential U/G miners training area for future projects • Extra development for new areas • As content in Pb concentrate (market restrictions) www.eldoradogold
Slide 15: Skouries
Skouries Photos Schist Amphibolite Gneiss Marble Intrusive www.eldoradogold.com 15
Slide 16: Forward-looking statements
Certain of the statements made in this Presentation may contain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities law. These forward-looking statemen
Slide 17: Thank You
Thank You TSX: ELD NYSE: EGO Total shares outstanding (as of June 30, 2012): 712.9 M Investor Relations: Nancy Woo (604) 601-6650 ⋅ nancyw@eldoradogold.com www.eldoradogold.com 17