Slide 1: Appendix E. Presentations to Municipal Councils
Record of Consultation and Engagement Future Development of the Eastern Ontario Waste Handling Facility Environmental Assessment Terms of Reference Appendix E. Presentations to Municipal Councils June 11, September 12, 2020 2020 | E-1
Slide 2: Municipal Council Presentation, Township of North Stormont, January 28, 2020
Record of Consultation and Engagement Future Development of the Eastern Ontario Waste Handling Facility Environmental Assessment Terms of Reference Municipal Council Presentation Township of North Stormont January 28, 2020 June 11, September 12, 2020 2020 |
Slide 3: Eastern Ontario Waste Handling Facility (EOWHF) Future Development
EASTERN ONTARIO WASTE HANDLING FACILITY (EOWHF) FUTURE DEVELOPMENT (JANUARY 28, 2020)
Slide 4: Existing EOWHF Status
EXISTING EOWHF STATUS • EOWHF Stages 1 through 3A approved disposal capacity of 7.4M m3 • Stages 3B & 4 part of original concept within existing EOWHF property, approx. 4.2M m3 of disposal capacity • Stages 3B & 4 approved in March 2019 and commenced operation in July 2019 • Approved annual fill rat
Slide 5: Future Development Plans
FUTURE DEVELOPMENT PLANS • The EOWHF is a critical component of the waste management infrastructure serving Eastern Ontario and the Province • Invested significantly at the site including the largest composting facility in Ontario, landfill gas to energy plant, and on-site leachate treatment facilit
Slide 6: Proposed Development Area
PROPOSED DEVELOPMENT AREA Presentation to Township of North Stormont Council, January 28, 2020
Slide 7: Environmental Assessment Process Overview
Develop and Submit Terms of Reference Public Input (January – September 2020) The ToR Agency and Minister Approves Terms of Reference Public Review (before end of 2021) Notice of EA Commencement (January 2022) Studies to Confirm Finalize Concepts for Public Input Existing Conditions Alternatives ENV
Slide 8: Alternative Concepts
ALTERNATIVE CONCEPTS Presentation to Township of North Stormont Council, January 28, 2020
Slide 9: Alternative Concepts
ALTERNATIVE CONCEPTS Presentation to Township of North Stormont Council, January 28, 2020
Slide 10: Project Schedule
PROJECT SCHEDULE Public Open House #1 Thursday, January 30th, 2020 4 p.m. – 8 p.m. Moose Creek Recreation Centre 4 St Polycarp St, Moose Creek, ON GFL Contact: Greg van Loenen, Environmental Compliance Officer Phone: 613-538-2776 ext. 223 Email: gvanloenen@gflenv.com Presentation to Township of Nort
Slide 11: Municipal Council Presentation, Township of North Stormont, April 28, 2020
Record of Consultation and Engagement Future Development of the Eastern Ontario Waste Handling Facility Environmental Assessment Terms of Reference Municipal Council Presentation Township of North Stormont April 28, 2020 June 12, 2020 |
Slide 12: Eastern Ontario Waste Handling Facility (EOWHF) Future Development
EASTERN ONTARIO WASTE HANDLING FACILITY (EOWHF) FUTURE DEVELOPMENT 17125 LAFLÈCHE ROAD, MOOSE CREEK, ON (APRIL 28 2020)
Slide 13: Current EOWHF
CURRENT EOWHF • Total area is 189 ha (467 acres) • Landfill Stages 1 through 4 have a total approved disposal capacity of 11.6M m3 • Approved annual landfill fill rate is 755,000 tonnes • Current filled capacity approximately 7.5 M m3 • Estimated remaining capacity of 5 – 6 years, by end of 2025 Lea
Slide 14: Current Waste Services and Future Development Plans
CURRENT WASTE SERVICES • The EOWHF is a critical component of the waste management infrastructure serving Eastern Ontario and the Province • Significant investments at the site include the largest composting facility in Ontario, landfill gas-to-energy facility, and on-site leachate treatment facilit
Slide 15: Proposed Development Area
PROPOSED DEVELOPMENT AREA = FROAD oe PROPOSED FUTURE DEVELOPMENT LANDS @ GFC........ environmental
Slide 16: Consultation Summary
CONSULTATION SUMMARY • Public Open House was held on January 30th at Moose Creek Recreation Centre. • To provide an overview of the project, obtain input on the development and contents of the ToR, and receive any comments or questions. • All display materials and a summary report are posted on the
Slide 17: Landfill Gas Management
LANDFILL GAS MANAGEMENT • Landfill gas (LFG) is produced by decomposing waste and can generate odours if not managed properly. • LFG is removed from the landfill by extraction wells under a constant vacuum and then combusted. • A total of 198 wells have been installed and are operating across Stages
Slide 18: Keeping It Local
KEEPING IT LOCAL Largest Employer Annually procure approximately $10 million in North Stormont of goods and services within the region Approximately 30 staff Significant local live in United Counties procurement includes: of Stormont, Dundas • MacEwen Fuels and Glengarry • Wanna Make It Farms • Les
Slide 19: Environmental Assessment Process Overview
Develop and Submit Terms of Reference Public Input (January – September 2020) The ToR Agency and Minister Approves Terms of Reference Public Review (end of 2020) Notice of EA Commencement (January 2021) Studies to Confirm Finalize Concepts for Public Input Existing Conditions Alternatives ENVIRONMEN
Slide 20: Next Steps
NEXT STEPS • We are in the process of following up and responding to comments received. • Plan to circulate our draft ToR in early June for review and comment. All project information is available on the project website http://gflenv.com/moose-creek-eowhf/ If you have any questions, please contact:
Slide 21: Municipal Council Presentation, The Nation Municipality - English, May 4, 2020
Record of Consultation and Engagement Future Development of the Eastern Ontario Waste Handling Facility Environmental Assessment Terms of Reference Municipal Council Presentation The Nation Municipality - English May 4, 2020 June 11, September 12, 2020 2020 |
Slide 22: Eastern Ontario Waste Handling Facility (EOWHF) Future Development
EASTERN ONTARIO WASTE HANDLING FACILITY (EOWHF) FUTURE DEVELOPMENT 17125 LAFLÈCHE ROAD, MOOSE CREEK, ON MAY 4, 2020
Slide 23: Current EOWHF
CURRENT EOWHF • Total area is 189 ha (467 acres) • Landfill Stages 1 through 4 have a total approved disposal capacity of 11.6M m3 • Approved annual landfill fill rate is 755,000 tonnes • Current filled capacity approximately 7.5 M m3 • Estimated remaining capacity of 5 – 6 years, by end of 2025 Lea
Slide 24: Current Waste Services and Future Development Plans
CURRENT WASTE SERVICES • The EOWHF is a critical component of the waste management infrastructure serving Eastern Ontario and the Province • Significant investments at the site include the largest composting facility in Ontario, landfill gas-to-energy facility, and on-site leachate treatment facilit
Slide 25: Proposed Development Area
PROPOSED DEVELOPMENT AREA = FROAD oe PROPOSED FUTURE DEVELOPMENT LANDS @ GFC........ environmental
Slide 26: Consultation Summary
CONSULTATION SUMMARY • Public Open House was held on January 30th at Moose Creek Recreation Centre. • To provide an overview of the project, obtain input on the development and contents of the ToR, and receive any comments or questions. • All display materials and a summary report are posted on the
Slide 27: Landfill Gas Management
LANDFILL GAS MANAGEMENT • Landfill gas (LFG) is produced by decomposing waste and can generate odours if not managed properly. • LFG is removed from the landfill by extraction wells under a constant vacuum and then combusted. • A total of 198 wells have been installed and are operating across Stages
Slide 28: Keeping It Local
KEEPING IT LOCAL Largest Employer Annually procure approximately $10 million in North Stormont of goods and services within the region Approximately 30 staff Significant local live in United Counties procurement includes: of Stormont, Dundas • MacEwen Fuels and Glengarry • Wanna Make It Farms • Les
Slide 29: Environmental Assessment Process Overview
Develop and Submit Terms of Reference Public Input (January – September 2020) The ToR Agency and Minister Approves Terms of Reference Public Review (end of 2020) Notice of EA Commencement (January 2021) Studies to Confirm Finalize Concepts for Public Input Existing Conditions Alternatives ENVIRONMEN
Slide 30: Next Steps
NEXT STEPS • We are in the process of following up and responding to comments received. • Plan to circulate our draft ToR in early June for review and comment. All project information is available on the project website http://gflenv.com/moose-creek-eowhf/ If you have any questions, please contact:
Slide 31: Municipal Council Presentation, The Nation Municipality - French, May 4, 2020
Record of Consultation and Engagement Future Development of the Eastern Ontario Waste Handling Facility Environmental Assessment Terms of Reference Municipal Council Presentation The Nation Municipality - French May 4, 2020 June11, September 12,2020 2020 |
Slide 32: Projet d'agrandissement du centre de traitement des matières résiduelles de l'Est de l'Ontario
PROJET D’AGRANDISSEMENT DU CENTRE DE TRAITEMENT DES MATIÈRES RÉSIDUELLES DE L’EST DE L’ONTARIO (EOWHF) 17125 ROUTE LAFLÈCHE, MOOSE CREEK, ON 4 MAI 2020
Slide 33: Installations actuelles
INSTALLATIONS ACTUELLES • Superficie totale de 189 ha (467 acres) • Capacité d’enfouissement autorisée pour les phases 1 à 4: 11.6M m3 • Volume d’enfouissement annuel autorisé : 755 000 tonnes • Volume d’enfouissement actuel est d’environ 7,5M m3 • Capacité restante d’enfouissement de 5-6 années (fi
Slide 34: Services actuels et projet d'agrandissement
SERVICES ACTUELS • Le EOWHF est une des installations importantes dans le réseau de gestion des matières résiduelles pour l’Est de l’Ontario et l’ensemble de la province. • Les investissements importants réalisés sur le site comprennent la plus grande installation de compostage en Ontario, une usine
Slide 35: Zone du projet d'agrandissement
ZONE DU PROJET D’AGRANDISSEMENT
Slide 36: Résumé du processus de consultation
RÉSUMÉ DU PROCESSUS DE CONSULTATION • Activité d’information publique: le 30 janvier au centre récréatif de Moose Creek • Présentation générale du projet et échanges sur l’élaboration et le contenu du cadre de références (ToR). • Tous les documents de présentation et un résumé du projet sont disponi
Slide 37: Gestion du biogaz
GESTION DU BIOGAZ • Le biogaz est produit par la décomposition des déchets et peut générer des odeurs si mal géré. • L’extraction du biogaz est réalisée à l’aide de puits de captage pour ensuite être détruit par combustion • 198 puits ont été installés et sont en exploitation dans les phases 1, 2 et
Slide 38: Partenaire dans la communauté
PARTENAIRE DANS LA COMMUNAUTÉ Plus grand Environ 10 million $ par année pour employeur à l’achat de biens et services dans la région Environ 30 employés North Stormont demeurent dans les Principaux fournisseurs cantons de Stormont, locaux : Dundas and Glengarry • MacEwen Fuels • Wanna Make It Farms
Slide 39: Aperçu du processus d'évaluation environnementale
Participation Élaboration et dépôt du cadre de références Cadre de (Janvier – Septembre 2020) des citoyens références Analyse par le (ToR) Ministre adopte le cadre de références ministère et (Fin 2020) les citoyens Avis de projet - Évaluation env’ale (Janvier 2021) Études pour Concepts des Commentai
Slide 40: Prochaines étapes
PROCHAINES ÉTAPES • Faire un suivi et répondre aux commentaires reçus. • Présenter au début du mois de juin notre version préliminaire du cadre de références (ToR) pour révision et commentaires. Tous les renseignements sur le projet sont disponibles sur le site Internet http://gflenv.com/moose-creek
Slide 41: Municipal Council Presentation, Village of Casselman, May 12, 2020
Record of Consultation and Engagement Future Development of the Eastern Ontario Waste Handling Facility Environmental Assessment Terms of Reference Municipal Council Presentation Village of Casselman May 12, 2020 June 11, September 12, 2020 2020 |
Slide 42: Projet d'agrandissement du centre de traitement des matières résiduelles de l'Est de l'Ontario
PROJET D’AGRANDISSEMENT DU CENTRE DE TRAITEMENT DES MATIÈRES RÉSIDUELLES DE L’EST DE L’ONTARIO (EOWHF) 17125 ROUTE LAFLÈCHE, MOOSE CREEK, ON 12 MAI 2020
Slide 43: Installations actuelles
INSTALLATIONS ACTUELLES • Superficie totale de 189 ha (467 acres) • Capacité d’enfouissement autorisée pour les phases 1 à 4: 11.6M m3 • Volume d’enfouissement annuel autorisé : 755 000 tonnes • Volume d’enfouissement actuel est d’environ 7,5M m3 • Capacité restante d’enfouissement de 5-6 années (fi
Slide 44: Services actuels et projet d'agrandissement
SERVICES ACTUELS • Le EOWHF est une des installations importantes dans le réseau de gestion des matières résiduelles pour l’Est de l’Ontario et l’ensemble de la province. • Les investissements importants réalisés sur le site comprennent la plus grande installation de compostage en Ontario, une usine
Slide 45: Zone du projet d'agrandissement
ZONE DU PROJET D’AGRANDISSEMENT
Slide 46: Résumé du processus de consultation
RÉSUMÉ DU PROCESSUS DE CONSULTATION • Activité d’information publique: le 30 janvier au centre récréatif de Moose Creek • Présentation générale du projet et échanges sur l’élaboration et le contenu du cadre de références (ToR). • Tous les documents de présentation et un résumé du projet sont disponi
Slide 47: Gestion du biogaz
GESTION DU BIOGAZ • Le biogaz est produit par la décomposition des déchets et peut générer des odeurs si mal géré. • L’extraction du biogaz est réalisée à l’aide de puits de captage pour ensuite être détruit par combustion • 198 puits ont été installés et sont en exploitation dans les phases 1, 2 et
Slide 48: Partenaire dans la communauté
PARTENAIRE DANS LA COMMUNAUTÉ Plus grand Environ 10 million $ par année pour employeur à l’achat de biens et services dans la région Environ 30 employés North Stormont demeurent dans les Principaux fournisseurs cantons de Stormont, locaux : Dundas and Glengarry • MacEwen Fuels • Wanna Make It Farms
Slide 49: Aperçu du processus d'évaluation environnementale
Participation Élaboration et dépôt du cadre de références Cadre de (Janvier – Septembre 2020) des citoyens références Analyse par le (ToR) Ministre adopte le cadre de références ministère et (Fin 2020) les citoyens Avis de projet - Évaluation env’ale (Janvier 2021) Études pour Concepts des Commentai
Slide 50: Prochaines étapes
PROCHAINES ÉTAPES • Faire un suivi et répondre aux commentaires reçus. • Présenter au début du mois de juin notre version préliminaire du cadre de références (ToR) pour révision et commentaires. Tous les renseignements sur le projet sont disponibles sur le site Internet http://gflenv.com/moose-creek