  1. Slide 1: Lublin Coal Project Presentation

    ABN 23 008 677 852 LUBLIN COAL PROJECT PRESENTATION March 2014 - ASX: PDZ Minesite Investor Forum, London, 11 March 2014

  2. Slide 2: Lublin Coal Project

    Lublin Coal Project Prairie Downs Metals Limited (ASX:PDZ) is an ASX listed company developing the Lublin Coal Project in Poland’s world class Lublin Coal basin  Large scale, high quality coal resource with semi- Lublin Coal Project Map soft coking/premium thermal potential - Inferred Coal Resource

  3. Slide 3: Poland: A favorable investment jurisdiction

    Poland: A favorable investment jurisdiction Poland is a safe, low risk mining jurisdiction with an excellent fiscal regime… Belchatow Power Station (4,440MW), Poland  One of the most attractive fiscal regimes globally for coal 19% corporate tax rate No Requirement for Government Participation 4PLN/

  4. Slide 4: The emergence of the Lublin Coal Basin

    The emergence of the Lublin Coal Basin  Initial drilling in the 1950's across the basin in search of gas reserves  Discovered massive coal resources  Government then drilled hundreds of boreholes between 1960-1980's  State owned company Bogdanka commenced production in 1982  Bogdanka has been s

  5. Slide 5: Polish Coal: A tale of two different coal basins

    Polish Coal: A tale of two different coal basins With the Upper Silesian Basin in decline, the Lublin Coal Basin is set to become the pre-eminent coal basin in Europe given favourable geology and mining conditions… Silesian Basin Lublin Basin Size * 5,400km2 Size 9,100 km2 Years in Production 250 Ye

  6. Slide 6: Bogdanka at a Glance

    Bogdanka at a Glance  Privatised by way of an IPO on Warsaw Stock Exchange in 2009  Current enterprise value in excess of USD1.6Bn with a 4% dividend yield in 2013  EBITDA margin of 39% (H1 2013)  Produced 8.4mt thermal coal in 2013 expanding to 12mtpa by 2015 Bogdanka Coal Mine  Lowest operati

  7. Slide 7: Lublin Basin: First Quartile Operating Costs

    Lublin Basin: First Quartile Operating Costs Q2 2013 Unit Mining Cash Costs (Source: Company Filings, 3.15 PLN/USD,  Lower Operating costs are 0.74 EUR/USD) primarily a function of favourable geology  Geology and mining conditions ideal for modern longwall plow operations  Caterpillar longwall pl

  8. Slide 8: Prairie Downs Lublin Coal Project

    Prairie Downs Lublin Coal Project  Dominant Basin Position  1.6 Billion tonne Inferred JORC Compliant Coal Resource Estimate 1  680 million tonnes (inferred) found within three high quality coal seams 1  Total resource located within 20 potentially economic coal seams 391 Seam 379 Seam 382 Seam

  9. Slide 9: Favourable Geology

    Favourable Geology 3271 million tonne Inferred JORC Compliant Coal Resource in the one thick, contiguous and high quality 391 coal seam… Note: 391 seam isopachs based on historical core and geophysical logs 1 JORC (Inferred), refer to maiden coal resource ASX announcement released on 14 February 201

  10. Slide 10: Metallurgical & Thermal Potential

    Metallurgical & Thermal Potential Initial testing has indicated that the Lublin Coal Project potentially hosts metallurgical coal which compares very well with current semi-soft benchmark coals… 391 Coal Seam Quality & Comparisons Prairie Downs Typical Semi-Soft Coking Typical Thermal 391 Seam* Hunt

  11. Slide 11: Export & Domestic Infrastructure

    Export & Domestic Infrastructure Rail, Port and Power infrastructure are all in place in Poland for new developments to supply both export and domestic European markets… Underutilised Coal Export Ports  Poland was the world’s 2nd largest coal exporter during the 1980’s, exporting 45mtpa  Capesize

  12. Slide 12: Competitive Freight Advantage

    Competitive Freight Advantage Lublin Coal Project’s location and access to infrastructure gives it a distinct advantage to capture key regional markets for both metallurgical and thermal coals… Excellent Seaborne European Market Penetration  Ability to penetrate all key European markets with access

  13. Slide 13: Exploration Program

    Exploration Program  Scoping Study being completed by Wardell Armstrong to: - Outline production profile and schedule - Provide detailed mine plan and process flow sheet - Estimate capital and operating costs  Core drilling program currently being completed to: - Validate historical drilling - Upd

  14. Slide 14: Building a world class team in Poland

    Building a world class team in Poland Page 14

  15. Slide 15: Experience Board and Management

    Experience Board and Management Strong board & management with proven development experience…  Highly respected, London based, mining engineer and investment banker  Eight years’ experience in underground longwall coal mining operations with BHP Billiton; Holds an Australian Ben Stoikovich (NSW) u

  16. Slide 16: Polish Executive Team

    Polish Executive Team Respected and established Polish team…  Geologist with over 30 years experience and a proven ability in the identification, exploration and appraisal of international Janusz Jakimowicz resource projects. Held positions at Ashton Mining, BHP Billiton and Striker Resources (Nort

  17. Slide 17: Corporate Structure

    Corporate Structure PRAIRIE DOWNS METALS LTD (ASX: PDZ) As at 10 March 2014 Current Issued Capital 132.3m Fully Diluted 158.9m Market Capitalisation (Undiluted @ A$0.32) A$42.3 million Cash at 31 January 2014 A$5.2 million Listed Securities Held* A$14.0 million Enterprise Value A$23.1 million Top 20

  18. Slide 18: Significant Re-rating Potential

    Significant Re-rating Potential…. Near term news flow and milestones….  Q1 2014 Results from coal quality and coal washability testing  Q1 2014 Results from marketing study  Q2 2014 JORC Resource estimate upgrade  Q2 2014 Publication of Scoping Study  Q3 2014 Commence Pre-Feasibility Study  H2

  19. Slide 19: Additional Slides

    ADDITIONAL SLIDES Europe’s next www.prairiedownsmetals.com.au

  20. Slide 20: Lublin Coking Coal Potential

    Lublin Coking Coal Potential  Strong long term demand growth for Seaborne Metallurgical Coal Demand – 2013 & Growth to 2035 coking coal expected in India, Brazil, Germany and Ukraine  Greater Europe (EU inc Turkey) consumes over 70mt of metallurgical coal per year  Poland is Europe’s largest prod

  21. Slide 21: Thermal Coal – Fundamental to Europe's Energy Matrix

    Thermal Coal – Fundamental to Europe’s Energy Matrix During 2012, Europe1 consumed over 770mt of coal for power generation, of which 265mt was thermal coal. Thermal coal imports amounted to 172mt, accounting for 22% of globally traded thermal coal… European Thermal Coal Imports & Production by Count

  22. Slide 22: Europe – Declining Domestic Coal Production

    Europe – Declining Domestic Coal Production Europe’s hard coal production continues to decline as viable coal resources deplete European Hard Coal1 Production (million tonnes) 400 Rest of EU 365mt (total) 350 Czech Republic 295mt Germany 300 United Kingdom 250 227mt Poland 200 189mt 155mt 150 127mt

  23. Slide 23: Increasing Reliance on Imported Thermal Coal

    Increasing Reliance on Imported Thermal Coal Imports from Russia, Colombia, the US and others are fundamental for European thermal coal supply… USA Russia Export to EU (2012) 35.8mt Export to EU (2012) 60.3mt % Total of EU Imports 19% % Total of EU Imports 33% Calorific Value (Kcal/kg) 6,676 Calorif

  24. Slide 24: Global Coal Producer Comparables

    Global Coal Producer Comparables Page 24

  25. Slide 25: Disclaimer

    Disclaimer Important Information This presentation has been prepared as a summary only, and does not contain all information about Prairie Downs Metals Limited’s (“Prairie”) assets and liabilities, financial position and performance, profits and losses, prospects, and the rights and liabilities atta

  26. Slide 26: Prairie Downs Metals Limited

    Prairie Downs Metals Limited Head Office London Office Poland Office Level 9, BGC Centre Unit 1C, Princes House PD CO Sp z o.o. 28 The Esplanade 38 Jermyn Street Rondo ONZ 1, Floor 5A PERTH WA 6000 LONDON, SW1Y 6DN 00-124 WARSAW AUSTRALIA UNITED KINGDOM POLAND P: +61 8 9322 6322 P: +44 207 478 3900