BPZ Resources — Credit Suisse 16th Annual Energy Summit 2013
24 slides from BPZ Resources's conference presentation, Feb 5, 2013

Slide 1: Credit Suisse 16th Annual Energy Summit
Credit Suisse 16" Annual Energy Summit ai o Vail Colorado Feb! 5-7,,2013 NYSE & BVL: BPZ www.bpzenergy.com

Slide 2: Forward Looking Statements
Forward Looking Statements ee This Presentation contains forward-looking statements within the meaning of the Private Securties Ltigation Reform Act of 1995, Section 27A of the Securties Act of 1933 and Section 2IE of the Securties Exchange Act of 1934.These forward looking statements are based on o

Slide 3: Better Positioned to Grow
Better Positioned to Grow Quality Acreage Offshore & Onshore Enhanced Operational, Technical, and Financial Resources Block Z-1 Transaction Closed and transferred 49% of license to Pacific Rubiales in 2012 @ Partnership accelerates Exploration & Development @ BPZ share of 2012, 2013, andsome if not

Slide 4: Favorable Host Country
Favorable Host Country Peru Peru Oil & Gas Sector = Promoting New Investments with = +80 Hydrocarbon Contracts in Force Social Inclusion = +50 Foreign Oil Companies engaged in = Investment Grade Ratings Oil Exploration & Production = GDP Growth of 6% per annum = Net Importer of Oil and Exporter of G

Slide 5: Mancora Gas and Heath Oil
————_ Mancora Gas and Heath Oil Potential Onshore 2D Seismic & 3D Planned XXII XXIII Adjacent to Prolific Oil Fields Mancora Gas Play New 2D Seismic Two Oil Plays Shallow Prospects 2D and 3D Seismic

Slide 6: Block Z-1 Producing Oil Fields
Block Z-1 2 Producing Oil Fields CX-15 Corvina Platform Drilling Campaign 18 MMBO Proved Reserves 1 Billion BOE of Prospective Resources 1,600 Sq. Km. of New 3D Seismic Carry Agreement with Pacific Rubiales Note: 2011 Reserves and Resources on a 51% net basis

Slide 7: Our Platform for Growth
Our Platform for Growth First well spud expected in Feb. 2013 = Production and reinjection equipment included = CX-15 and CX-11 platforms interconnected by subsea pipelines = 24drilling slots = Drilling and completion time 6-8 wks* = $10 MM-$12 MM drill costs/well* = 1,000-1,500 bopd avg. IP rates*

Slide 8: Continue Optimizing Oil Production
Continue Optimizing Oil Production ee Corvina CX-11 Platform Corvina & Albacora Fields = Gas cap reinjection underway at Corvina has had positive results > Opportunity to increase gas injection with CX-15 compressors > Opportunity to prove up probable reserves = Corvina CX-11 workovers to resume in

Slide 9: CX-15 platform area covered
= CX-15 platform area covered 30 ACQUIRED || 510 8 225K, oes BATHYMETRY Phase | and II completed IN METERS,

Slide 10: Maturing Leads into Prospects
Maturing Leads into Prospects Lead B LeadA Lead H Delfin Corvina Trend Albacora ae * Confirmed presence of undrilled structures (with multiple targets) * Indications of new leads/prospects on trend of previously drilled structures * 3D shows possible hydrocarbon effects 10

Slide 11: Confirmed presence of undrilled structures
* Confirmed presence of undrilled structures (with multiple targets) * Indications of new leads/prospects on trend of previously drilled structures * Lead G mappedis larger than original expectations at

Slide 12: ONSHORE: 100% Working Interests
ONSHORE: 100% Working Interests Cg )BPZEneray ). dmg Ey Poni OO Block XIX Block XXIII Mancora Gas and Heath Oil Mancora Gas Play 2D Seismic Completed Two Oil Plays New 3D Seismic Planned 2D and 3D Seismic Block XXII Adjacent to producing oil fields Pre-existing 2D seismic New 2D Seismic Shallow Pros

Slide 13: Talara Oil Fields
Talara Oil Fields have produced >1.7 Billion BBLs of oil to date and are producing ~40,000 bopd currently 3D SEISMIC ‘CUBE 2D LINE BPZOXXI-16 > soon 13

Slide 14: Block XXIII — 3D Cube
Block XXIII — 3D Cube (Based on New 3D Seismic) y BPZ Energy ge Anticline with previously drilled wells indicating presence of shallow hydrocarbons 2D PLANE SECTION VIEW OVER CD-X-1 WELL SHOWING STRUCTURE EXTENDING INTO BLOCK XIX 2D PLANE SECTION VIEW OVER ANTICLINE LEGEND WELLS

Slide 15: Oil Potential in Southern Block XXIII
Oil Potential in Southern Block XXIII Multiple structures with shallow oil potential in formations producing oil in Talara Basin New 2D Seismic Line BPZ10XXIII-16 Seismic Line BPZLOXXIII-16 — Major Fault Eocene (Salinas) — Small Faults Eocene (Talara) Eocene (Verdun) 15

Slide 16: OS 1015 25Km,
OS 1015 20 25Km, ° 510 15Mies 16

Slide 17: Structures on both sides of the depocenter
= Structures on both sides of the depocenter = Thick section of Cretaceous Muerto formation source rock expected in depocenter BPZ10XXII-16 time POCITOS ° 5 10 Miles SojO Depth (STRUCTURE STRUCTURE ve, 15,00 7

Slide 18: Next Steps Onshore
Next Steps Onshore: Blocks XIX and XXIII M Partnering process launched QO Permitting underway for drilling and seismic OQ Drill best Block XXIII shallow oil / gas prospects QO) Carry out 3D seismic survey in Block XIX Block XXII QO) Shoot confirmation 2D line extensions in Pocitos prospect as well a

Slide 19: 2013 Capital & Exploratory Budget
2013 Capital & Exploratory Budget $ Millions Onshore Contingent shallow drilling at Block XXIII * Contingent 3D and 2D seismic Blocks XIX and XXII * Other Total Offshore Block Z-1 (fully carried by Pacific Rubiales) CX-15 development drilling (6 wells) Projects & engineering Other Contingent Albacor

Slide 20: Drill and Produce from New CX-15 Platform
Drill and Produce from New CX-15 Platform Corvina Workovers Apply New Seismic Data * Contingent Albacora drilling * Define Z-1 exploration PACE Ocean campaign ECUADOR Drill and Develop Block Z-1 Prospects 1 Ongoing 30 seismic + WE sesiega0sesme gg an SW bisingsosmic SI Explore Onshore

Slide 21: Commitment to Corporate Citizenship
Commitment to Corporate Citizenship BPZ Energy Awarded distinction as a Socially Responsible Company by Peruvian association PERU 2021 in association with Mexican Center of Philanthropy (CEMEFI). Recognized for implementing best practices that promote the employee quality of life, good community rel

Slide 22: Our Vision
Our Vision The BPZ team will be recognized for excellence in exploring, developing and producing oil and gas in the Americas. For additional information please contact: A. Pierre Dubois Corporate Investor Relations & Communications BPZ Energy 580 Westlake Park Blvd., Suite 525 Houston, Texas 77079 (

Slide 23: Appendix - Numbers at a Glance
Appendix - Numbers at a Glance Nine Months 2010 2011 2012 Revenues $110 $ 144 $ 98 Operating Loss $ (61) $ (12) $ (39) EBITDAX $ 39 $ 52 $ 31 Capital & Exploratory Expenditures $168 $ 89 $ 89 Avg. Oil Sales Price / BBL $ 73 $101 $ 104 Avg. Daily Production BOPD 4,185 3,770 3,424 Proved Oil Reserves

Slide 24: Appendix — GAAP Reconciliation
Appendix — GAAP Reconciliation Cy )BPZ Energy _ etag trway. Poa Reconciliation of non-GAAP measure The table below represents a recondiliation of EBITDAX to the Company's net income (loss), which is the most directly comparable financial measure calculated in accordance with generally accepted accou
Source: SEC EDGAR · 8-K filed Feb 5, 2013
More decks from BPZ Resources Inc
Corporate Update (March 2015)6 slides · Mar 27, 2015
Debt Investor Presentation (March 2015)32 slides · Mar 10, 2015
Debt Investor Presentation (March 2015)11 slides · Mar 10, 2015
Investor Presentation (October 2014)32 slides · Oct 2, 2014
Investor Presentation (August 2014)20 slides · Aug 19, 2014
Investor Presentation (June 2014)33 slides · Jun 23, 2014