Slide 1: Väsman project Conceptual study results
1 Väsman project Conceptual study results Presenter: SRK UK – 12 November 2019 Location: Virtual © SRK Consulting (UK) Ltd 2019. All rights reserved.
Slide 2: Introduction to the Väsman project
Introduction to the Väsman project 2 • The Väsman project is located 220 km west-northwest of Stockholm, close to the town of Ludvika. • The project is part of the Ludvika Iron Ore Project, which also comprises the historic iron mines and deposits of Blötberget (situated approximately 3km south – we
Slide 3: Geotechnical evaluation - Level Spacing
Geotechnical evaluation - Level Spacing 3 • Pillar requirements are for stability in top-down Long Väsman South Lyviksberget Hole Open stoping which is the proposed method of From To Level spacing From To Level spacing Comments extraction below the Väsman Lake. mRL m mRL m • Transverse stoping is pr
Slide 4: Transverse Stopes and Mining Method Assumptions
Transverse Stopes and Mining Method Assumptions 4 • The proposed mining method is Sub Level Open Stoping (SLOS) without backfill. • Transverse stopes dimensions are: 20/25/30m high by 28m wide and between 15m to 60m long (Hanging wall to Footwall) • The pillars for the Väsman zone are the same dimen
Slide 5: Longitudinal Stope and Pillar Design (Lyviksberget and Finnaset)
Longitudinal Stope and Pillar Design ( Lyviksberget and Finnaset) 5 • Longitudinal stopes are 30m high x 30m Väsman Mining Sequence Schematics long and between 3 and 15m wide Sill Pillar • Rib pillars are 10m wide Rib Pillar Rib Pillar • Sill pillars are 7.5m high 37.5 Development Sill Pillar Rib Pi
Slide 6: Access Option – Base case – Option 1
Access Option – Base case – Option 1 6 Base case – Single conveyor decline access from Blötberget to Väsman Plan view • Vent raises every 1,100 m at the conveyor decline • Early production (year 2 – 0.6Mt) • Higher truck haulage distance from the bottom of Väsman to crusher station compared with Opt
Slide 7: Access Option – Option 2
Access Option – Option 2 7 Option 2 – Single conveyor decline access from Blötberget to Väsman and second parallel access (pilot drive) from Häksberg Plan view • Pilot drive to be used as exploration development for Väsman North • Additional ventilation and secondary egress which allows location of
Slide 8: Production Rate Assessment and Modifying factors
Production Rate Assessment 8 Based on a production rate assessment the Väsman production rate is around 3.4 Mt per year: • Longitudinal stoping - Normally up to 1.0 Mtpa from (peaking at 1.8 Mtpa at the beginning when no transverse stoping is taking place) • Transverse stoping - Up to 2.4 Mtpa Appli
Slide 9: COG calculation and TEM input parameters
COG calculation and TEM input parameters 9 • Iron ore price – 104.05 USD/t product – Magnetite (Blötberget (BB) report) • Mining cost – 12.00 USD/t RoM (BB report reference without backfill) • Beneficiation Plant + Tailings – 4.81 USD/t RoM (from BB report plus additional 30%) • G&A – 4.67 USD/t RoM
Slide 10: Schedules summary graph
Schedules summary graph 10 © SRK Consulting (UK) Ltd 2019. All rights reserved.
Slide 11: Financial results – Operational and Capital Costs
Financial results – Operational and Capital Costs 11 RoM Concentrate Capital Expenditure Base case Option 2 Base case Option 2 Base case Option 2 (USDm) (USDm) (USD/t RoM) (USD/t RoM) (USD/t Conc) (USD/t Conc) Capital Development 58 66 3.1 3.5 7.2 8.2 Undergound infrastructure 28 28 1.5 1.5 3.4 3.4
Slide 12: Financial results – NPV and Ramp-up capital
Financial results – NPV and Ramp-up capital 12 NPV Base case Option 2 Capital Expenditure – First 2 years Base case Option 2 Discount (USDm) (USDm) (USDm) (USDm) 0% 136.8 129.4 Capital Development 16.2 31.2 4% 99.0 91.8 Capital Lateral Development 15.0 29.0 8% 70.9 63.7 Capital Vertical Development
Slide 13: Conclusions and Recommendations
Conclusions and Recommendations 13 SRK has undertaken a conceptual study on the Väsman project with the following main outcomes: • Two options have been evaluated: • Base case – Single access from the Blötberget decline • Option 2 – As per Base Case and additional access via pilot drive from Håksber
Slide 14: Recommendations - Drilling
Recommendations - Drilling 14 The following drilling metres have been proposed: Land 8,975 m Barge 4,375 m Total 13,350 m The holes are to be properly surveyed and cemented to reduce the risk of water inflow into any future underground workings. © SRK Consulting (UK) Ltd 2019. All rights reserved.
Slide 15: SRK Office Locations and Project Countries
SRK Office Locations and Project Countries 15 >1,400 Professionals, 45 offices, 20 countries, 6 continents © SRK Consulting (UK) Ltd 2019. All rights reserved.