  1. Slide 1: Dragon Mining: An Established Nordic Gold Producer

    Dragon Mining An Established Nordic Gold Producer Prospectors and Developers Association of Canada Nordic Mining Days 3 - 4 March 2014

  2. Slide 2: Disclaimer

    Disclaimer The purpose of this presentation is to provide general information about Dragon Mining Limited (the "Company"). Unless otherwise stated herein, the information in this presentation is based on the Company's own information and estimates. This presentation does not constitute or form any p

  3. Slide 3: Competent Persons Statement

    Competent Persons Statement The information in this presentation that relates to Mineral Resources is based on information compiled by Mr Neale Edwards BSc (Hons), a Fellow of the Australian Institute of Geoscientists, and Mr Matti Talikka MSc (Geology), a Member of the Australasian Institute of Min

  4. Slide 4: Dragon Mining Summary

    Dragon Mining Summary • Two established Production Centres • Mineral Resources of 1.02 million ounces grading 4.6 g/t gold • Potential significant project - Kuusamo Mine Project • Debt free • Cash A$5.9 million and A$9.7 million in bullion and net gold concentrate receivables (31 December 2013) • Ex

  5. Slide 5: Corporate

    Corporate Issued Capital Board of Directors ASX Code DRA Arthur Dew Non Executive Chairman Ordinary Shares 88.84m Options ($1.00 – $2.10) 2.174m Brett Smith Executive Director Market Capitalisation A$16.44m (Market Opening – 3 March 2014) Peter Gunzburg Non Executive Director Markku Mäkelä Substanti

  6. Slide 6: Dragon Mining Overview

    Dragon Mining Overview Established Nordic Gold Producer Production • Svartliden and Vammala Production Centres • 2011 - 54,791 ounces (C1 cash cost US$1,014/oz) • 2012 - 54,328 ounces (C1 cash cost US$1,095/oz) • 2013 - 64,482 ounces (C1 cash cost US$1,013/oz) Potential Significant Project • Kuusamo

  7. Slide 7: Svartliden Production Centre

    Svartliden Production Centre Svartliden Gold Mine 7

  8. Slide 8: Svartliden Production Centre

    Svartliden Production Centre Svartliden Gold Mine Since first production in 2005 the Svartliden Production Centre has produced 350,871 ounces to 31 December 2013 Mineral Resources (Inclusive of Ore Reserves) Category Tonnes Gold (g/t) Ounces Measured 300,300 4.9 47,300 Indicated 657,000 3.3 69,800 I

  9. Slide 9: Vammala Production Centre

    Ap Vammala Production Centre Dragon Mining

  10. Slide 10: Vammala Production Centre

    Vammala Production Centre • Vammala Production Centre – Vammala Flotation Plant – Orivesi Gold Mine – Jokisivu Gold Mine – Kaapelinkulma Mine Project • Since recommissioning in 2007, the Vammala Production Centre has produced 176,089 ounces of gold in concentrate to 31 December 2013 10

  11. Slide 11: Vammala Production Centre: Orivesi Gold Mine

    Vammala Production Centre Orivesi Gold Mine • Orivesi Gold Mine first commenced production in 1992, yielding 422,000 ounces of gold to the end of 2003 when the mine was placed on care and maintenance • Dragon Mining recommenced mining in 2007, initially with the development of the Sarvisuo area and

  12. Slide 12: Orivesi Gold Mine – Continuing Deeper

    Vammala Production Centre Orivesi Gold Mine – Continuing Deeper 12

  13. Slide 13: Orivesi Gold Mine – Potential for Discovery

    Vammala Production Centre Orivesi Gold Mine – Potential for Discovery 13

  14. Slide 14: Jokisivu Gold Mine

    Vammala Production Centre Jokisivu Gold Mine Jokisivu Gold Mine commenced production in September 2009, initially by open-pit then underground methods Mineral Resources (Inclusive of Ore Reserves) Category Tonnes Gold (g/t) Ounces Measured 244,900 5.6 43,500 Indicated 825,700 5.1 135,700 Inferred 53

  15. Slide 15: Jokisivu Gold Mine - Kujankallio deposit

    Vammala Production Centre Jokisivu Gold Mine - Kujankallio deposit Gold lodes are open with depth and partly along strike 15

  16. Slide 16: Kuusamo Mine Project

    Be Kuusamo Mine Project Dragon Mining a

  17. Slide 17: Kuusamo Mine Project Overview

    Kuusamo Mine Project Overview • Area with potential to develop into significant gold camp • 700km north east of Helsinki • Excellent infrastructure • Potential local workforce • Permitting and approval process still have to be undertaken and the project remains at the exploration stage 17

  18. Slide 18: Kuusamo Mine Project Mineral Resources

    Kuusamo Mine Project Mineral Resources • Three key deposits: • Juomasuo • Hangaslampi • Pohjasvaara • 647 holes, 86,720 metres completed • High quality, high grade Mineral Resource base: • 381,600 ounces @ 4.8 g/t gold • 82% Measured & Indicated • Excellent potential for resource growth at existing

  19. Slide 19: Kuusamo Mine Project Development Status

    Kuusamo Mine Project Development - Status Metallurgy Environmental Impact Assessment • Metallurgical test work has • Environmental Impact Assessment demonstrated material is amenable to report released in December 2013 for conventional comminution followed by three month public review flotation with

  20. Slide 20: Kuusamo Exploration Province

    Kuusamo Exploration Province • Large land package - 600 km2 • Under-explored, highly prospective greenstone belt • Mineral Resource base of 78,000 ounces @ 2.6 g/t gold from two deposits in the Kuusamo South area • Series of early stage targets that have yielded strong intercepts from limited histor

  21. Slide 21: Kuusamo Exploration Province

    Kuusamo Exploration Province • Large land package - 600 km2 • Under-explored, highly prospective greenstone belt • Mineral Resource base of 78,000 ounces @ 2.6 g/t gold from two deposits in the Kuusamo South area • Series of early stage targets that have yielded strong intercepts from limited histor

  22. Slide 22: Hanhimaa Gold Project

    Hanhimaa Gold Project Earn-In Agreement with Agnico Eagle • Agreement with Agnico Eagle to earn up to 70% interest in the Hanhimaa Gold Project • Agnico-Eagle can spend €5 million over 4 years to earn a 51% interest and an additional €4 million over the following 3 years to earn a further 19% • 23 d

  23. Slide 23: Dragon Mining Summary

    Dragon Mining Summary • Two established Production Centres • Mineral Resources of 1.02 million ounces grading 4.6 g/t gold • Potential significant project - Kuusamo Mine Project • Debt free • Cash A$5.9 million and A$9.7 million in bullion and net gold concentrate receivables (Dec 31 2013) • Experie

  24. Slide 24: For more information

    For more information: www.dragon-mining.com.au 24

  25. Slide 25: Appendices

    Appendices • Group Gold Mineral Resources • Kuusamo Gold Mineral Resource 25

  26. Slide 26: Group Mineral Resources

    Group Mineral Resources Gold (inclusive of Ore Reserves) As at 31 Dec 2012 Measured Indicated Inferred Total Gold Gold Gold Gold Tonnes Ounces Tonnes Ounces Tonnes Ounces Tonnes Ounces (g/t) (g/t) (g/t) (g/t) Svartliden 300,300 97,000 3.8 4.9 11,800 47,300 246,000 657,000 4.2 3.3 33,400 69,800 39,00

  27. Slide 27: Kuusamo Mineral Resource

    Kuusamo Mineral Resource Gold As at 31 Dec 2012 Measured Indicated Inferred Total Gold Gold Gold Gold Tonnes Ounces Tonnes Ounces Tonnes Ounces Tonnes Ounces (g/t) (g/t) (g/t) (g/t) Kuusamo Mine – Kuusamo North Juomasuo 158,000 8.4 42,500 1,368,000 4.7 205,900 415,000 3.8 50,500 1,941,000 4.8 298,90