Rockfire Resources Plc · LSE:ROCK

Rockfire Resources — Investor Presentation (August 2018)

32 slides from Rockfire Resources's investor presentation, Aug 16, 2018

  1. Slide 1: Exploring for gold and copper in Australia and Papua New Guinea

    (LON:ROCK) Exploring for gold and copper in Australia and Papua New Guinea 1

  2. Slide 2: Disclaimer

    Disclaimer Important Information This presentation has been prepared by Rockfire Resources plc (“ROCK” or the “Company”). It should not be considered as an offer or invitation to subscribe for, or purchase any, securities in the Company or as an inducement to make an offer or invitation with respect

  3. Slide 3: Rockfire Resources – exploring amongst giants

    Rockfire Resources – exploring amongst giants ✓Exploring amongst world-class deposits in Australia and PNG ✓Excellent opportunity for discovery of economic deposits ✓A determined, experienced and successful board of directors ✓Aiming to build a growth company providing returns for investors ✓Low m/c

  4. Slide 4: Rockfire Resources – 10-year gold and copper

    Rockfire Resources – 10-year gold and copper GOLD Source: www.goldprice.org COPPER US$/T Source: www.lme.com/Metals/Non-ferrous/Copper ROCKFIRE 4

  5. Slide 5: Rockfire Resources – discovery trend favours juniors

    Rockfire Resources – discovery trend favours juniors Junior explorers are responsible for over 70% of all new mineral discoveries. ROCKFIRE 5

  6. Slide 6: Rockfire Resources – company profile

    Rockfire Resources – company profile AIM Code: ROCK Ordinary Shares (million) 373.34 Market Cap (£0.0135) £5.05M Cash at 15 Aug 2018 £0.75M Debt at 15 Aug 2018 £0 Shareholder Shares (M) % Michael Somerset-Leeke 51.15 13.70 Nicholas Walley 37.52 10.05 Value Generation/P.& M. Johnson 30.96 8.29 Salida

  7. Slide 7: Rockfire Resources – board of directors and management

    Rockfire Resources – board of directors and management • Gordon Hart Chairman Equities and Finance, (+35 years experience) Graduate of Institute of Company Directors Venture Group Equities, GB Energy, Convergent Minerals, Informotion • David Price Managing Director and CEO (FAusIMM) Geologist, (30 y

  8. Slide 8: Australia

    Australia ROCK owns 100% of all tenements • ‘Lighthouse’ Breccia-hosted Au/Cu +/- Ag Sits amongst giants • ‘Marengo’ Epithermal Au/Cu, IRGS Historical goldfield (1871) • ‘Copperhead’ Porphyry Cu Included in the USGS ‘Global Mineral Resource Assessment’ ROCKFIRE 8

  9. Slide 9: Papua New Guinea

    Papua New Guinea ROCK owns 100% of all tenements • ‘Tripela’ Porphyry Cu Rocks up to 29% Cu at surface • ‘Mount Visi’ Porphyry Cu New discovery, rocks up to 35.5 g/t Au and 4% Cu. ROCKFIRE 9

  10. Slide 10: Lighthouse

    Lighthouse Queensland, Australia 636 sq. km. Multiple breccia, epithermal and vein-hosted mineralising systems 10

  11. Slide 11: Lighthouse strategic land accumulation

    Lighthouse STRATEGIC LAND ACCUMULATION Regional production +20moz Au ROCKFIRE 11

  12. Slide 12: Lighthouse Plateau Prospect

    Lighthouse PLATEAU PROSPECT Open pit mine potential Historical drilling: December 2017 drilling: • 44m @ 2.4 g/t Au • 10m @ 5.0 g/t Au • 22m @ 1.9 g/t Au + 22.3 g/t Ag • 8m @ 3.0 g/t Au (39m downhole) • 14m @ 2.4 g/t Au • 3m @ 4.9 g/t Au • 20m @ 0.5 g/t Au + 2.5 g/t Ag (16m downhole) • 10m @ 1.9 g/t

  13. Slide 13: Lighthouse Plateau Prospect – open at depth

    Lighthouse PLATEAU PROSPECT – open at depth ROCKFIRE RESOURCES PLC ROCKFIRE 13

  14. Slide 14: Lighthouse Double Event Prospect

    Lighthouse DOUBLE EVENT PROSPECT Rockfire Resources plc 3 kilometres long Lighthouse Project, Double Event Prospect Rock sam pling February 2018 Sam ple Au Ag Pb Pb Num ber ppm ppm ppm % • Gold assays include; 37.7 g/t, 33.3 g/t, BDERS001 19.15 52.70 13,750 1.38 33.1 g/t, 25.9 g/t, 24.3 g/t, 23.5 g/

  15. Slide 15: Lighthouse Double Event Prospect

    Lighthouse DOUBLE EVENT PROSPECT Battle Mountain drill results 1987 July 2018 drilling: • 2m @ 13.2 g/t Au • 4m @ 4.65 g/t Au • 3m @ 2.1 g/t Au and 4 g/t Ag (from 23m) • 1m @ 3.93 g/t Au • 4m @ 2.87g/t Au • 4m @ 1.2 g/t Au and 4 g/t Ag (from 24m) • 1m @ 3.25g/t Au • 1m @ 6.0 g/t Au and 30 g/t Ag (fr

  16. Slide 16: Marengo

    Marengo Queensland, Australia 180 sq. km. Epithermal and Intrusion- related gold system (IRGS) 16

  17. Slide 17: Marengo two large intrusions

    Marengo TWO LARGE INTRUSIONS • One Mile Mountain is undrilled • Historical rocks up to 149 g/t Au • Faults, ring fractures, veining, sulphides and alteration MAPPING JUNE 2018 ROCKFIRE 17

  18. Slide 18: Marengo high grades at surface

    SAMPLE Au Ag Cu Cu Marengo HIGH GRADES AT SURFACE DESCRIPTION ppm ppm ppm % BMARS010 3.32 2.1 1,845 0.2 BMARS012 2.92 13.6 1,770 0.2 BMARS013 1.14 2.7 2,060 0.2 BMARS016 2.40 16.7 24 BMARS017 4.11 2.4 456 BMARS019 21.80 21.1 162 BMARS025 2.27 25.9 60 BMARS028 59.40 297.0 110 BMARS029 15.60 165.0 9 B

  19. Slide 19: Marengo One Mile Mountain geophysics

    Marengo ONE MILE MOUNTAIN GEOPHYSICS Possible copper porphyry with up to 1-2% sulphides GEOPHYSICS MAY 2018 Gradient Array chargeability high anomaly Possible epithermal vein gold system with silica alteration Gradient Array resistivity low anomaly ROCKFIRE 19

  20. Slide 20: Marengo One Mile Mountain geophysics

    Marengo ONE MILE MOUNTAIN GEOPHYSICS Possible top of porphyry copper Dipole-Dipole survey May 2018 GEOPHYSICS MAY 2018 Resistivity Chargeability ROCKFIRE 20

  21. Slide 21: Marengo Homeward Bound Prospect

    Marengo HOMEWARD BOUND PROSPECT GEOPHYSICS MAY 2018 Gradient Array chargeability high anomaly Gradient Array resistivity low anomaly ROCKFIRE 21

  22. Slide 22: Marengo ground magnetics

    Marengo GROUND MAGNETICS One Mile Mountain Homeward Bound GEOPHYSICS AUGUST 2018 Partially demagnetised alteration aureole ROCKFIRE 22

  23. Slide 23: Copperhead

    Copperhead Queensland, Australia 96.5 sq. km. Porphyry Copper 23

  24. Slide 24: Copperhead a large-scale project

    Copperhead A LARGE-SCALE PROJECT • 1970 Cu vein discovered at Julivon in 1970 Julivon Prospect • Auger drilling outlined a coherent +100ppm copper- in-soil anomaly in excess of 3km x 2km • 5 holes by Carpentaria +450ppm Cu Exploration in 1972. (weighted average 0.25% Cu + 2.1g/t Ag) +450ppm Cu • Inc

  25. Slide 25: Copperhead a large copper anomaly

    Copperhead A LARGE COPPER ANOMALY MODELLING AUGUST 2018 300 ppm Cu ROCKFIRE 25

  26. Slide 26: Copperhead copper plunging to depths beyond 300m

    Copperhead COPPER PLUNGING TO DEPTHS BEYOND 300m MODELLING AUGUST 2018 ** Target resource of 200Mt – 300Mt grading between 0.2% and 0.3% Cu 300 ppm Cu ** This is an Exploration Target and the potential quantity and grade is conceptual in nature. There has been insufficient exploration to estimate a

  27. Slide 27: Copperhead opportunity with infrastructure

    Copperhead OPPORTUNITY WITH INFRASTRUCTURE • Large, quality water supply • Australia’s largest copper refinery Lake Proserpine 20km from Copperhead There is no certainty that Rockfire Resources will be permitted to utilise any of the Glencore’s Copper Refinery infrastructure shown. Neither the owner

  28. Slide 28: Papua New Guinea

    Papua New Guinea New Britain (297.6 sq. km) Porphyry copper/gold 28

  29. Slide 29: Papua New Guinea 'Elephant' territory

    Papua New Guinea ’ELEPHANT’ TERRITORY ROCKFIRE 29

  30. Slide 30: Tripela intensely sheared and altered

    Tripela INTENSELY SHEARED AND ALTERED ROCKFIRE 30

  31. Slide 31: What we have achieved! What can you expect?

    Rockfire Resources what we have achieved! what can you expect? Lighthouse Lighthouse X Geophysics at Plateau (review old geophysics) • RC drilling at Double Event ✓ RC drilling Plateau • Further regional assessment ✓ RC drilling Double Event Marengo ✓ Regional assessment • RC drilling Marengo • Furt

  32. Slide 32: Contact

    (LON:ROCK) www.rockfireresources.com Salisbury House, London Wall London EC2M 5PS, England 32

Rockfire Resources — Investor Presentation (August 2018) on 6ix