Centaurus Metals Limited · ASX:CTM
Centaurus Metals — Resources Rising Stars Conference September 2015
26 slides from Centaurus Metals's conference presentation, September 2015
Slide 1: New Partner, New Opportunities, New Directions in Brazil
NEW PARTNER, NEW OPPORTUNITIES, NEW DIRECTIONS IN BRAZIL September 2015 – Resources Rising Stars Conference Darren Gordon – Managing Director
Slide 2: Disclaimer
Disclaimer This presentation does not constitute investment advice. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation does not take into a
Slide 3: Centaurus – The Investment Opportunity
Centaurus – The Investment Opportunity o Diversified ASX-listed resource company with extensive asset portfolio in Brazil Capital Structure o Strategy to reposition the Company well underway: Shares on Issue 352.9m o Unlocking the value of significant existing domestic Listed Options (EP $0.05, Exp
Slide 4: New Strategic Partner, New Opportunities
New Strategic Partner, New Opportunities o New Strategic Alliance established with Terrativa Minerais SA (TA), one of Brazil’s pre-eminent private exploration groups o TA holds an extensive tenement position in Brazil comprising some 200 tenements o TA set to become a major shareholder of Centaurus
Slide 5: Aurora Copper – New Horizons
Aurora Copper – New Horizons Aurora Copper Project 5
Slide 6: Aurora Copper – Project Location
Aurora Copper – Project Location 6
Slide 7: Aurora Copper – Outstanding Logistics & Infrastructure
Aurora Copper – Outstanding Logistics & Infrastructure o 15km from Federal highway BR-116 and less than 10km from the Transnordestina Rail (completion in 2016) o Project rail-head is roughly 350km to the fully operational bulk cargo port of Pecém o A high tension power lines traverses the project ar
Slide 8: Aurora Copper – Copper Sulphide Mineralisation
Aurora Copper – Copper Sulphide Mineralisation o Zone of extensional tectonics on a secondary shear zone of the Patos Shear (primary shear zone of NE Brazil) o Copper sulphides identified in core as both semi-massive veins and disseminated mineralisation o Sulphide assemblage: mainly chalcopyrite, c
Slide 9: Aurora Copper – Copper Oxide Mineralisation
Aurora Copper – Copper Oxide Mineralisation o Multiple expressions of secondary copper minerals (malachite) along 3km strike, correlating well with sulphide intersections at depth o Malachite predominant along fracture features o Grades of up to 16% Cu were returned when CTM directly analysed the ma
Slide 10: Aurora Copper – Outstanding New Targets from Historical Data
Aurora Copper – Outstanding New Targets from Historical Data o Terrativa completed ground mag and gravity surveys on 100m spaced lines over main target areas o From public reports Centaurus has identified that Vale completed soil geochem and IP survey work over entire project area on 400m line spaci
Slide 11: Aurora Copper – Initial Exploration Program
Aurora Copper – Initial Exploration Program Work Program for 2015/2016: o Re-assess all CPRM and Terrativa core and field data and integrate with other public data (Vale) – Underway o Re-process Terrativa geophysical data to generate 3D inversion and compare with historical drilling results – Underw
Slide 12: Mombuca Gold – Regionally Exciting Gold Project
Mombuca Gold – Regionally Exciting Gold Project Mombuca Gold Project 12
Slide 13: Mombuca – Project Location
Mombuca – Project Location 13
Slide 14: Mombuca Project – Gold and Iron Ore Potential
Mombuca Project – Gold and Iron Ore Potential o Regionally significant magnetic anomaly (4.8km x 3.5km) with significant high-grade gold and iron ore potential o The anomaly is of similar magnitude to that covering the world-class Itabira Iron Ore Complex, located just 20km to the south-east o Locat
Slide 15: Mombuca Project – Initial Target Zone, Soil Geochem
Mombuca Project – Initial Target Zone, Soil Geochem o Detailed soils geochem program has been conducted over the Initial Target Zone (ITZ) o Over 400 samples taken, 206 sent for chemical assay o Gold values in soils up to 0.8g/t Au returned over an extensive, open-ended zone 1.5km long and varying i
Slide 16: Mombuca Project – Recent Stream Sediment Work
Mombuca Project – Recent Stream Sediment Work o Three highly anomalous catchments identified by a stream sediment survey o Stream sediment assays up to 904 ppb (0.9 g/t) Au received with nine of the 49 samples returning more than 100ppb o Anomalous catchments coincident with magnetic and Potassium/T
Slide 17: Mombuca Project – Regional Aeromagnetics
Mombuca Project – Regional Aeromagnetics Crustal scale lineaments evident in First Vertical Derivative (1VD) delivering excellent exploration targets Both magnetic high (hydrothermal magnetite development) and low (iron oxide depletion zones due to sulfidation) are linked with the crustal scale
Slide 18: Brazilian Domestic Iron Ore
Brazilian Domestic Iron Ore Unlocking value from an extensive, development-ready project portfolio 18
Slide 19: Candonga – Deal Summary
Candonga – Deal Summary DSO Ore Reserve of 1.2Mt grading 60.5% Fe Consideration for Commitment to Lease of R$4 million (~A$1.6 million) to be received in instalments over 10 months Equates to A$1.3/tonne of DSO Reserve CTM Study showed Project could deliver EBITDA of A$20.9 million over 3 year life
Slide 20: Conquista DSO Project – Ground Magnetics
Conquista DSO Project – Ground Magnetics Conquista Project located only 8km from the recently sold Candonga DSO Iron Ore Project Significant high-grade DSO outcrop already identified on the Conquista ground over 2.5km of strike 20
Slide 21: Conquista – DSO Exploration Target
Conquista – DSO Exploration Target Rock chip samples collected to date grade 64-70% Fe with low impurities DSO Exploration Target established at Conquista of 3.5-8Mt grading 64% to 67% Fe based on outcrop, field mapping and knowledge of the Candonga Project. The Exploration Target quantity and grade
Slide 22: Conquista DSO Project – Value Proposition
Conquista DSO Project – Value Proposition Capital and Operating Costs for Conquista likely to be very similar to Candonga Project that is only 8km away DSO mineralisation is outcropping in areas of initial stage vegetation Further exploration to be undertaken to prove up Exploration Target and
Slide 23: Jambreiro – Project Location
Jambreiro – Project Location • 110km from Ipatinga steel- making region • JORC Resource of 128Mt • Initial Ore Reserve of 48.5Mt 110km • Over 19,000 metres of diamond and RC drilling to support JORC resource and 140km reserve • Extensive data set (including drill core) available to support project f
Slide 24: Jambreiro – A Development-Ready Project
Jambreiro – A Development-Ready Project Key Financial Outcome Total A significant asset that remains highly valuable to Total Revenue A$750 million the Company EBITDA A$350 million All Environmental and Mines Department approvals Capital Costs A$53 million in place for a wet processing operation up
Slide 25: Centaurus – Investment Summary
Centaurus – Investment Summary Rejuvenated and repositioned Brazilian-focused resource developer Strategy to realize value from extensive iron ore portfolio underway First transaction completed on Candonga DSO Project New Strategic Alliance secured with prominent Brazilian exploration group New copp
Slide 26: New Partner, New Opportunities, New Directions in Brazil
NEW PARTNER, NEW OPPORTUNITIES, NEW DIRECTIONS IN BRAZIL September 2015 – Resources Rising Stars Conference Darren Gordon – Managing Director 26
Centaurus Metals — Resources Rising Stars Conference September 2015 on 6ix