Slide 1: 2026 H1 Results Announcement
2026 H1 Results Announcement Record-High Interim Results Resource & Capacity Growth Unlock Value 2026.08.28 1
Slide 2: Forward Looking Statement
Forward Looking Statement This statement is made in accordance with the "forward-looking statements" definedunder the U.S. Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. The forward-looking statements and information in this document include, but are not li
Slide 3: Table of Contents
Table of Contents Company Operations & Financial 04 Performance Jiama Mine 12 CSH Mine 18 External Growth & Acquisition 23 Strategy Appendix: Mineral Resources & 25 Reserves 3
Slide 4: Company Operations & Financial Performance
01 Company Operations & Financial Performance 4
Slide 5: H1 Production Achieved Over Half of Full-Year Guidance
H1 Production Achieved Over Half of Full-Year Guidance H1 Gold Production H1 Copper Production Achieved Achieved 51% of Full-Year Guidance 56% of Full-Year Guidance Gold Production oz / kg Copper Production M lb / tonnes 88,200/ 2,743 78.64/35,671 76.99/34,924 72,317/2,249 2025 H1 2026 H1 2025 H1 20
Slide 6: H1 Revenue Up 58% YoY
Record-High Results Delivered in 2026 H1 Revenue US$100M Mine Operating Earnings US$100M H1 Revenue 9.14 Up 58% YoY 6.2 5.8 The Company delivered its best-ever Q2 and H1 results 2.77 • Mine operating earnings and net profit both more than doubled, with robust operating cash flow 2025 H1 2026 H1 2025
Slide 7: 59.8% Net Profit Margin
Interim Profitability Reached a Historic High 59.8% Net Profit Margin The Company Delivered Its Best Ever Q2 Profit Performance Revenue and Net Profit (US$ million) Revenue Net Profit Net Profit Margin 500 453.2 461.0 70.00% 450 60.00% 384.7 400 345.0 50.00% 350 307.3 300 273.1 275.8 40.00% 236.4 25
Slide 8: Strong Operating Cash Flow and EBITDA Growth Drive Long-Term Value Creation
Strong Operating Cash Flow and EBITDA Growth Drive Long-Term Value Creation EBITDA US$ million US$661M $4,500 $3,964 M 2026 H1 EBITDA $4,000 $661 10-Year Cumulative $3,500 $756 $3,000 EBITDA: US$3.96B $2,500 $153 $269 $508 $2,000 $509 $1,500 $341 $1,000 $171 US$555M $194 $500 $172 $114 $117 $0 2015
Slide 9: Stable and Solid Financial Structure
Stable and Solid Financial Structure Total Debt Ratio = 26.0% Maintaining a Healthy Balance Sheet Deposits, Cash and Cash Equivalents: US$990M Strong Capital Base – Better Positioned for Market Volatility and Opportunities Finance Costs Declined, Capital Structure Further Optimized Finance costs wer
Slide 10: HK Market Capitalization Exceeded HK$100B for the First Time
HK Market Capitalization Exceeded HK$100B for the First Time, Reaching a Milestone High P/B = 5.01x CAD 46.27 / share HKD 260.80 / share In Oct. and Nov. 2025 Effective Sept. 2026 Included in two key benchmarks: Hang Seng China-Affiliated Corporations Further inclusion in Hang Seng High Dividend Yie
Slide 11: Company Profile
Share Performance, Investor Profile & Analyst Coverage Analysts Institutional Investors Company Profile Firm Target Price As of Aug. 2026 TSX: CGG HKEX: 2099 Huatai 253.31HKD Share Price (2026.8.21) 260.8 HKD/46.27 CAD Securities Basic Shares Outstanding 396 M Northeast 252.00HKD Securities Market C
Slide 12: Jiama Mine
2 PHSSEMARARAAl China Gold International Resources Corp .Ltd
Slide 13: 2026 H1 Production Metrics – Jiama
2026 H1 Production Metrics – Jiama Gold Production oz / kg Production Cost US$ / lb Production & Cost 2025 H1 2026 H1 Analysis 42,371/1,317 29,464/916 3.29 Total Production Cost Main Reason for Cost Reduction 3.25 Lower proportion of high-cost underground ore and higher proportion of low-cost open-
Slide 14: Significant Resource Upgrade Strengthens Jiama's Development Base
Significant Resource Upgrade Strengthens Jiama’s Development Base As of June 30, 2026 | Measured + Indicated + Inferred Mineral Resources 1.79 Bt Ore Tonnage 12.14 Mt Contained Copper Metal Polymetallic Resource Endowment Au Ag Mo Pb Zn 16.49 Moz 724 Moz 0.57 1.431 0.704 (approx. 513 t) (approx. 22.
Slide 15: Clear Capacity Recovery Path, Tailings Facility Progressing Steadily
Clear Capacity Recovery Path, Tailings Facility Progressing Steadily Daily Processing Capacity & Ore Supply Structure Yulungbu TSF Construction Progress Yulungbu TSF 34,000 Commissioned 50,000 01 Preliminary procedures t/d t/d completed Current Mining Permit Capacity Restored Enhanced Underground mi
Slide 16: Jiama Advances Next-Stage Large-Scale Development
Jiama Advances Next-Stage Large-Scale Development Targeting Capacity Equivalent to Two Additional Jiama Mines Capacity Scale-Up (Expected Commissioning in 2030) 50,000 t/d 160,000 t/d Current Design Proposed Expansion Potential processing capacity is approximately 3.2x the current design capacity De
Slide 17: PFS Progressing Steadily; Linking Current and Long-Term Development
PFS Progressing Steadily; Linking Current and Long-Term Development Project Pathway and Two Key Safeguards End-2026 Thereafter Expected PFS Regulatory Completion Approvals Current Next Step Final Pre-Feasibility Internal Investment / Study Review Construction Decision Production Safeguard During Con
Slide 18: CSH Mine
2 PHSSEMARARAA) China Gold International Resources Corp .Ltd
Slide 19: 2026 H1 Production Metrics – CSH
2026 H1 Production Metrics – CSH Total Production Cost US$ / oz All-in Sustaining Cost 2025 H1 2026 H1 AISC = $1,329/oz 1,619 Strip Ratio = 0.35 1,776 Total Cost Increased by Approx. 10% - 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 CSH Gold Production oz / kg Cash Cost US$ / oz 45,829/1,425
Slide 20: Slope Remediation Approved; Path to Mining Resumption Clarified
Slope Remediation Approved; Path to Mining Resumption Clarified Remediation Plan in Place Mining Resumption Timetable Slope remediation plan approved 01 Plan Approved Approx. RMB98.38M 02 Contractor Mobilization Total budgeted capex for two remediation projects Key-stage works to be completed in app
Slide 21: Preparatory Works for Open-Pit-to-Underground Development Commenced
Preparatory Works for Open-Pit-to-Underground Development Commenced Open-Pit-to-Underground Transition Path and Key Progress Underground Development Direction Defined 01 As open-pit mining enters its later stage, underground resource development has become a key transition direction for CSH Preparat
Slide 22: SRK Engaged for Independent NI 43-101 PFS
SRK Engaged for Independent NI 43-101 PFS SRK Two-Stage Work Key Technical Studies The Company has signed an agreement with SRK Consulting Rock Mechanics: Assess rock mass behavior and caveability Stage 1 Stage 2 Gap Independent Analysis Feasibility Study Geotechnical Engineering: Assess wall rock s
Slide 23: External Growth & Acquisition Strategy
04 External Growth & Acquisition Strategy 23
Slide 24: Acquisition Target Criteria
Targeting High-Quality Gold and Copper Assets to Expand Global Resource Footprint Acquisition Target Criteria • Focus on copper-gold and gold assets • Preference for mature assets owned by major shareholders • Located in South America, Central Asia, Australia, Africa and the Middle East – safe and f
Slide 25: Appendix: Mineral Resources & Reserves
Appendix: Mineral Resources & Reserves 25
Slide 26: Jiama Copper-Gold Polymetallic Mine
Jiama Copper-Gold Polymetallic Mine Resources Latest data as of June 30, 2026 (Cu cut-off grade: 0.30%)) Grade Metal Content Ore Cu Mo Au Ag Pb Zn Cu Mo Au Ag Pb Zn Category (Mt) (%) (%) (g/t) (g/t) (%) (%) (Mt) (Mt) (Moz) (Moz) (kt) (kt) Measured 623.1 0.71 0.03 0.29 13.16 0.08 0.04 4.38 0.21 5.77
Slide 27: CSH Gold Mine
CSH Gold Mine Resources Latest data as of Dec. 31, 2025 Location Resource Category Ore Volume (kt) Grade (g/t) Metal Content (t) Metal Content (Moz) Measured 6,031 0.68 4.09 0.132 Within Open Pit Indicated 6,647 0.72 4.75 0.153 Cut-off Grade 0.28 g/t Au M+I 12,678 0.70 8.84 0.285 Inferred 2,576 0.41