  1. Slide 1: Integrated Developer, Owner and Operator of Renewable Energy Projects

    Integrated Developer, Owner and Operator of Renewable Energy Projects Investors Presentation – January 2021

  2. Slide 2: General disclaimer and forward-looking statements

    General: The information contained in this presentation is subject to, and must be read in conjunction with, all other publically available information, including our Annual Report on Form 20-F for the year ended December 31, 2019, and other filings that we make from time to time with the SEC. Any p

  3. Slide 3: Investor Highlights

    Investor Highlights Financial and technological expertise Active in various markets and locations From development to operation Trusted by financial institutes and banks Renewable energy as a long term, adaptable business Ongoing growth with conservative leverage ratios Public company traded in TASE

  4. Slide 4: Our Vision

    Our Vision To be ahead of the curve in green energy generation and storage technologies. To be a profitable and sustainable business based on enhanced financing strategies and advanced technological expertise. To provide comprehensive solutions, from development to operation, enabling a stable suppl

  5. Slide 5: Our Objectives: Energy Revolution as a Long-Term, Profitable Business

    Growing our renewable energy and power generation activities – from development to operation – in Europe and Israel. Continuous growth Creating continuous cash flow from various assets in diverse renewable energy and energy storage applications. Constant cash flow Maintainingrelatively lowleverage r

  6. Slide 6: Business Development Roadmap

    Business Development Roadmap Manara Cliff - Conditional license for pumped storage Talasol, Spain - Signed a PPA for 80% of the expected output Sold 49% of Talasol 2017 2018 2019 2020 Acquired Talmei Yosef PV Plant Commercial operation of first Biogas Project in the Netherlands Talasol Financing agr

  7. Slide 7: Financial Forecast (in million of Euro)

    Financial Forecast (in million of Euro) (1) The forecast assumes the expected commencement of operations mid year.The PV Plant located in Talmei Yosef, Israel is presented under the fixed asset model and not under the financial asset model as per IFRIC 12. Including the Company's share in Dorad. The

  8. Slide 8: Development Projects – Growth

    Development Projects – Growth Early Stage Development900 MW Under Advanced Development 591 MW Italy - aggregated 900 MW PV Israel - 20 MW PV + Storage. 156 MW Manara Cliff, Pumped Storage * Italy – 415 MW PV Ready for construction28 MW Connected to the grid 416 MW PV - Spain & Israel; Biogas - Nethe

  9. Slide 9: Diverse Green Energy Infrastructure

    DiverseGreen Energy Infrastructure Development, Construction, Operation Solar Energy | PV Waste to Energy | Bio Gas Clean Energy | Natural Gas Energy Storage | Pumped Storage 9

  10. Slide 10: Projects Summary (EUR Millions)

    Projects Summary (EUR Millions) Projects % Ownership License MW Expected Distribution in 2021 Expected Annual Revenues in 2021 Expected Annual Adjusted EBITDA in 2021 Expected Adjusted Annual FFO in 2021 Expected Debt as of December 31, 2021 Expected interest on bank loans payment in 2021 Expected C

  11. Slide 11: Projects Summary – Under Development

    Projects Summary (EUR Millions) Projects % Ownership License MWp/ MWp/h Ready for construction Spain PV 100% Expected production start: 2021 28 MW Under development Israel – PV + Storage 100% Expected production start: 2023 20 MW Italy PV 100% Expected production start: 2021-2023 415 MW Israel – Man

  12. Slide 12: Waste-to-Energy (Biogas) Projects

    Waste-to-Energy(Biogas) Projects EUR Millions 2021 (E) 2022 (E) 2023 (E) Revenues 13 15 15 Cost of Sale -6.4 -6.8 -6.8 Gross Margin 6.6 8.2 8.5 Opex -2.6 -3.1 -3 Ebitda 4 5.1 5.3 Interest on bank loans -0.5 -0.4 -0.4 Taxes on income - -0.9 -0.9 Adjusted FFO 3.5 3.8 4 See Appendix C for reconciliatio

  13. Slide 13: Spain – Talasol

    Spain – Talasol * Business strategy and timeline: Acquired:2017 Capacity:300 MW Plant type:1 PV plant Starting power production:Q4/2020 Location:Talaván, Cáceres, Spain ExpectedCost:EUR 227M Expected Annual Revenue:EUR 23-25M June 2018:METKA –procurement and engineering agreement June 2018:PPA agree

  14. Slide 14: Talasol PV Plant

    Talasol 300 MW PV Plant Connection lines within the project 14 Evacuation line construction Grid ConnectionDecember 2020

  15. Slide 15: Framework Agreements for the Development of 1,315 MW PV Projects in Italy

    Framework Agreements for the Development of 1,315 MW PV Projects in Italy Expected Capacity:1,315 MW Expected power production:90 MW – 2021180 MW – 2022450 MW – 2023595 MW – 2024 Location:Italy ExpectedCost:625 MIL EUR Signed:2020 Plant type:Multi PV plants

  16. Slide 16: PV + Storage in Israel

    PV + Storage in Israel Tender winning date July 14, 2020 Location Israel Total installed capacity (MWh) –DC* 40 Total installed capacity (MWh, Calc.) –AC* 20 % of electricity through battery 19.7% Expected annual power production (MW) 72,771 Expected construction cost NIS 160 M Tariff (Ag) 19.90 Lic

  17. Slide 17: Israel - Manara Cliff

    Israel - Manara Cliff Expected Capacity:156 MW Location:Manara Cliff - Israel ExpectedCost:EUR 390M Acquired:Ellomay Capital Ltd. –75% Sheva Mizrakot Ltd. –25% Plant type:1 pumped hydro storage plant During December 2020, the Manara Project paid a consent fee of approximately NIS 60 million (includi

  18. Slide 18: Key Balance Sheet Figures

    Key Balance Sheet Figures December 31, 2017 % Of BS December 31, 2018 % Of BS December 31, 2019 % Of BS September 30, 2020Unaudited % Of BSUnaudited Cash and cash equivalent, deposits and marketable securities 26,124 13% 39,014 18% 53,197 17% 62,726 16% Financial Debt* 106,515 54% 117,435 56% 164,90

  19. Slide 19: Key Financial Ratios

    Key Financial Ratios December 31 , 2017 December 31 , 2018 December 31, 2019 September 30, 2020Unaudited Financial Debt to CAP * 58% 60% 61% 64% Financial Debt, net to CAP * 44% 40% 41% 47% * See Appendix B for calculations Strong Balance Sheet, Sufficient Liquidity

  20. Slide 20: Summary

    Summary Renewable energy industry enjoys favorable business prognosis and supportive regulation Competitive pricing,no need for governmental subsidizing High segmental and geographic diversity. Revenue not dependent on a specific project Long termagreements reducedemand market risk Value based finan

  21. Slide 21: Renewable Energy Market and Business Environment

    Renewable energy is an ongoing, worldwide sustainable economy trend, with an ever growing production and consumption of green energy. Renewable Energy Market and Business Environment http://www.brinknews.com/eu-2020-renewable-energy-goals-on-track/ http://appsso.eurostat.ec.europa.eu/nui/show.do?dat

  22. Slide 22: Israel - Renewable Energy Production Goals

    Israel - Renewable Energy Production Goals https://www.gov.il/he/Departments/General/renewable_energyhttps://www.evm.co.il/israel/אנרגיות-מתחדשות-הפוטנציאל-הלא-ממומש-ש/ https://www.gov.il/he/Departments/news/re_171119 2.26%Actually produced Expected to increased to 25-30% by 2030

  23. Slide 23: The Photo-Voltaic Market Overview

    The Photo-Voltaic effect enables conversion of light into electricity using semiconductors.IEA:PV expected todoubleuntil 2023 The Photo-Voltaic Market Overview https://www.iea.org/renewables2018/ ©OECD/IEA Bioenergy Solar Thermal Hydropower Geothermal Wind Marine Solar PV Renewable energy consumptio

  24. Slide 24: Waste-to-Energy Market Overview

    Waste-to-Energy Market Overview Biogas is a renewable energy source, produced by fermentation of organic matter. Expected CAGR 2018-2024 is 6%* Number of biogas plants per 1 Mio capita in European countries in 2017 * https://www.statista.com/statistics/480452/market-value-of-waste-to-energy-globally

  25. Slide 25: Pumped Hydro Storage Market Overview

    The Pumped Hydro Storage method stores energy in the form of gravitational potential energy of water, pumped from a lower elevation reservoir to a higher elevation.365/24/7Energy storage enables power delivery all day and all year round. Pumped Hydro Storage Market Overview https://www.gminsights.co

  26. Slide 26: Thank You

    THANK YOUFor further Info:Ran Fridrich, CEO: ranf@ellomay.comKalia Weintraub, CFO: kaliaw@ellomay.com www.ellomay.com

  27. Slide 27: Appendix A – Adjusted EBITDA and Adjusted FFO

    Appendix A – Adjusted EBITDA and Adjusted FFO Adjusted EBITDA and Adjusted FFO are non-IFRS measures. EBITDA is defined as earnings before financial expenses, net, taxes, depreciation and amortization and FFO (funds from operations) is calculated by adding tax and financing expenses to EBITDA. The C

  28. Slide 28: Appendix B – Financial Debt and CAP calculations

    As of December 31, As of December 31, As of December 31, As of September30, 2017 2018 2019 2020 Current liabilities Loans and borrowings € (3,103) € (5,864) € (4,138) € (15,262) Debentures € (4,644) € (8,758) € (26,773) € (6,668) Non-current liabilities Finance lease obligations € (3,690) € - € - €

  29. Slide 29: Appendix C – Biogas EBITDA and Adjusted FFO

    Appendix C – Biogas EBITDA and Adjusted FFO EBITDA and Adjusted FFO are non-IFRS measures. EBITDA is defined as earnings before financial expenses, net, taxes, depreciation and amortization and FFO (funds from operations) is calculated by adding tax and financing expenses to EBITDA. The Company uses