  1. Slide 1: Macquarie Connections Conference Presentation

    For personal use only 8 May 2014 The Manager, Company Announcements Australian Securities Exchange Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 MACQUARIE CONNECTIONS CONFERENCE PRESENTATION Please find attached the presentation which will be presented by Michael Sheridan, Chief Financial

  2. Slide 2: Macquarie Connections Australia Conference Presentation

    Horizon Oil Limited ABN 51 009 799 455 For personal use only Macquarie Connections Australia Conference Presentation May 2014 This presentation contains some references to forward looking assumptions, representations, estimates and outcomes. These are uncertain by the nature of the business and no a

  3. Slide 3: Horizon Oil Snapshot

    Horizon Oil Snapshot For personal use only  Market capitalisation of A$494m at A$0.38 per share on 30 April 2014 (1,301.2m shares)  Current net production: Maari/Manaia 900 bopd priced at Brent plus US$5-6 Beibu Gulf 3,400+ bopd priced at Brent less US$4  Current EBITDA ~US$11m per month  Foreca

  4. Slide 4: Shareholder Distribution and Trading Statistics

    Shareholder Distribution and Trading Statistics SHARE PRICE HISTORY TRADING STATISTICS For personal use only 3

  5. Slide 5: Geographic Focus and Asset Location

    Geographic Focus and Asset Location Focus remains on southeast Asia/Australasia, with… For personal use only …new exploration block in China and expanded acreage position in PNG 4

  6. Slide 6: Investment Proposition

    Investment Proposition For personal use only  Focused southeast Asian/Australasian E&P specialist  Strong, long-lived cashflows from Maari/Manaia fields, offshore New Zealand, re-invested to fund future capital program. Low risk, new reserves appraisal drilling and mid-life field upgrade program b

  7. Slide 7: Net Reserves, Contingent Resources and Prospective Resources

    Net Reserves1, Contingent Resources1 and Prospective Resources1 as at 30 April 2013, Post Osaka Gas Transaction For personal use only RESERVES CONTINGENT RESOURCES PROSPECTIVE RESOURCES Proven + Probable Proven + Probable Best Estimate 7 Includes 2.6 mmbbl LPG (1 tonne LPG equals 11 bbl) 1 Estimated

  8. Slide 8: Forecast Net Production From Reserves + Contingent Resources

    Forecast Net Production From Reserves + Contingent Resources as at 30 April 2013, Post Osaka Gas Transaction and Tingu-1 For personal use only 25,000 20,000 Barrels of oil equivalent per day 15,000 10,000 5,000 0 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Maari/Manaia Wei 6-12

  9. Slide 9: Significant Recent Achievements

    Significant Recent Achievements Successful sale of 40% of PNG assets to Osaka Gas For personal use only  Horizon Oil entered into agreement in May 2013 to sell 40% of its PNG assets to Osaka Gas Co. Ltd. of Japan for US$204 million, including US$74 million in cash on completion, a further US$130 mi

  10. Slide 10: Upcoming News Flow and Share Price Catalysts

    Upcoming News Flow and Share Price Catalysts Timeframe For personal use only  Stanley PDL award and development execution Q2 2014  Improved production performance from Maari/Manaia fields and progress on Ongoing to Q1 2015 field upgrade  Progress on Beibu Gulf fields Phase II development plan Ong

  11. Slide 11: Maari/Manaia Fields – New Zealand

    Maari /Manaia Fields – New Zealand For personal use only PMP 38160: Gross reserves (mmbo) as 2P at 31 December 2013 HZN 10% (RISC estimate) OMV 69% (Op) Todd 21% Produced 22.0 CUE 5% Remaining 60.0 10

  12. Slide 12: Maari/Manaia – Key Points

    Maari/Manaia – Key Points  Wellhead platform / FPSO development in 100 m water depth For personal use only  Maari Moki zone developed with 5 producer wells and 3 water injectors – field developed on basis of 60 mmbo recoverable reserves; successful appraisal/development wells drilled from platform

  13. Slide 13: Maari Field Development Assets

    Maari Field Development Assets For personal use only 12

  14. Slide 14: Maari/Manaia Upside Potential

    Maari /Manaia Upside Potential For personal use only 13

  15. Slide 15: Maari/Manaia Growth Projects

    Maari/Manaia Growth Projects For personal use only Objective to reconfigure water injection scheme, access undeveloped reserves and optimise production 14

  16. Slide 16: PEP 51313 – New Zealand

    PEP 51313 – New Zealand Deep prospect and lead inventory with 163 mmbo exploration potential For personal use only PEP 51313: HZN 21% (10% Whio) OMV 30% (Op) Todd 35% CUE 14% Whio-1 to be drilled in Q1 2014 with mean potential of 27 mmbo (operator estimate) 15

  17. Slide 17: Beibu Gulf Fields, China – Development Areas

    Beibu Gulf Fields, China – Development Areas For personal use only Block 22/12 Post-CNOOC Back-in: HZN 26.95% CNOOC 51.00% (Op) ROC 19.60% Majuko Corp 2.45% Gross reserves 2P (mmbo) as at 31 December 2013 Produced 3.0 Remaining 24.4 16

  18. Slide 18: Beibu Gulf Fields – Key Points

    Beibu Gulf Fields – Key Points  2 phase development in 40 - 60 m water depth utilising CNOOC platform facilities, export pipeline and For personal use only terminal on Weizhou Island  Phase 1 platforms WZ 6-12 and WZ 12-8W connected by pipeline to PUQB utility platform; completion cost within init

  19. Slide 19: Beibu Gulf Fields – Phased Development Scheme

    Beibu Gulf Fields – Phased Development Scheme For personal use only 18

  20. Slide 20: WZ 12-8E Early Production Concept – Phase II

    WZ 12-8E Early Production Concept – Phase II For personal use only WZ 12‐1PUQB  Leased mobile production platform NOED Mobile  Flexible pipeline Production Platform  Initially up to three production wells  Run extended DST or pilot production  Drill more wells (4-5) depending on production perf

  21. Slide 21: Papua New Guinea

    Papua New Guinea For personal use only Horizon Oil acreage position expanded to ~7,900 sq km, primarily in wet gas “sweet spot” 20

  22. Slide 22: PNG Exploration and Development Program – Key Points

    PNG Exploration and Development Program – Key Points For personal use only  Commanding 7,900 sq km acreage position in liquids-rich “sweet spot” of foreland area with certified condensate and gas resources of 125 mmboe net, subject to reduction when transaction with Osaka Gas completes  Stanley (P

  23. Slide 23: Horizon Oil Acreage and Joint Venture Partners

    Horizon Oil Acreage and Joint Venture Partners PRL 4: For personal use only HZN 30% (Op) Osaka Gas 20% Talisman 40% Mitsubishi 10% PRL 21: HZN 27% (Op) Osaka Gas 18% Talisman 32.5% Kina 15% Mitsubishi 7.5% PPL 259: HZN 35% Osaka Gas 10% Eaglewood 45% P3GE 10% PPL 430: HZN 50% (Op) Eaglewood 50% PPLs

  24. Slide 24: Stanley Project Concept

    Stanley Project Concept Facilities For personal use only  2 train, 140 mmscfd gas refrigeration plant  Mercury removal via adsorption catalyst beds  Gas sales at plant fence, addition gas recycled to enhance liquids recovery  6 inch, 40 km pipeline to transport liquids to Kiunga  60,000 bbl sto

  25. Slide 25: Stanley Production Facility Site

    Stanley Production Facility Site For personal use only 24

  26. Slide 26: Kiunga Base and Condensate Loadout Facility

    Kiunga Base and Condensate Loadout Facility For personal use only 25

  27. Slide 27: PRL (Elevala/Tingu and Ketu) – Development Concept

    PRL 21 (Elevala/Tingu and Ketu) – Development Concept For personal use only 26

  28. Slide 28: PNG Gas Commercialisation Options

    PNG Gas Commercialisation Options  Sales to regional buyers for power generation For personal use only – Ok Tedi Mining Limited (OTML) and Frieda River project (when sanctioned) – Local towns and communities in Kiunga – OK Menga – Frieda River corridor – Export to West Papua: Merauke, Jayapura  Mi

  29. Slide 29: Upcoming News Flow and Share Price Catalysts

    Upcoming News Flow and Share Price Catalysts Timeframe For personal use only  Stanley PDL award and development execution Q2 2014  Improved production performance from Maari/Manaia fields and progress on Ongoing to Q1 2015 field upgrade  Progress on Beibu Gulf fields Phase II development plan Ong

  30. Slide 30: Please visit the Horizon Oil website

    Please visit the Horizon Oil website www.Horizonoil.com.au to see:- Detailed Investor Presentation Latest Quarterly Report For personal use only Analyst reports on HZN Level 7, 134 William St, The reserve and resource information contained in this announcement is based on information compiled by Ala